  • National Bridge Inventory (NBI) Statistics
  • 10Number of bridges
  • 72ft / 22.3mTotal length
  • $31,420,000Total costs
  • 21,944Total average daily traffic
  • 1,409Total average daily truck traffic
  • 32,472Total future (year 2042) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Hart's Location
  • No street view available for this location

New bridges in Hart's Location, NH - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 11940-1949
  • 11950-1959
  • 11960-1969
  • 51970-1979
  • 12010-2019
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 44.4%Very good
  • 44.4%Good
  • 11.1%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 44.4%Very good
  • 44.4%Good
  • 11.1%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 11.1%Very good
  • 66.7%Good
  • 22.2%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 11.1%Very good
  • 11.1%Good
  • 44.4%Satisfactory
  • 33.3%Fair
Find on map >>   Show street view

Structure Number: 116006900081,  Location: 1.3 MI SE FROM CARROLL TL (Lat: 44.197786,  Lng: -71.407153),  Route carried "on" structure: US 302,  Year Built: 1978,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 2,376 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,516 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: WILLEY BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 72.171,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 13.6m (44.6ft),  Out-to-Out Width: 14.8m (48.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 74.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 116007000084,  Location: 1.0 MI FROM CARROLL TL (Lat: 44.200211,  Lng: -71.406258),  Route carried "on" structure: US 302,  Year Built: 1978,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 2,376 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,516 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: SACO RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 71.880,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 6 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 13.6m (44.6ft),  Out-to-Out Width: 14.8m (48.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 52.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 116011600085,  Location: 3.5 MI CARROLL TL (Lat: 44.170281,  Lng: -71.384503),  Route carried "on" structure: US 302,  Year Built: 1960,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 1,854 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,743 (year 2042),  Design Load: HS 20,  Features Intersected: AVALANCHE BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 75.961,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.0m (42.7ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 13.2m (43.3ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 74.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.07m (3.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 116012700096,  Location: 4.4 MI CARROLL TL (Lat: 44.165069,  Lng: -71.369186),  Route carried "on" structure: US 302,  Year Built: 1949,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 1,854 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,743 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: SACO RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 77.353,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.6m (41.3ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.19m (3.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 116014200094,  Location: 5.3 MI FROM CARROLL TL (Lat: 44.153250,  Lng: -71.364719),  Route carried "on" structure: US 302,  Year Built: 1976,  Status: Open,  Structure Length: 3.20m (10.50ft),  Average Daily Traffic: 1,854 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,743 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: SACO RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 78.790,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.0m (95.1ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 52.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.20m (10.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 116014900089,  Location: 5.8 MI CARROLL TL (Lat: 44.146075,  Lng: -71.365608),  Route carried "on" structure: US 302,  Year Built: 1950,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 0.83m (2.72ft),  Average Daily Traffic: 1,854 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,743 (year 2042),  Design Load: H 20,  Features Intersected: BEMIS BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 79.614,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.2m (23.6ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 60.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.83m (2.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 116019700077,  Location: 4.2 MI.BARTLETT T.L. (Lat: 44.113397,  Lng: -71.354022),  Route carried "on" structure: US 302,  Year Built: 1978,  Status: Open,  Structure Length: 6.77m (22.21ft),  Average Daily Traffic: 2,444 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,617 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: NHRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 83.472,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 5 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 51.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.77m (22.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 116020100072,  Location: 8.3 MI CARROLL TL (Lat: 44.112603,  Lng: -71.353767),  Route carried "on" structure: US 302,  Year Built: 1978,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 2,444 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,617 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: NANCY BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 83.578,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 96.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.25m (4.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 116023500059,  Location: 1.8 MI FROM BARTLETT TL (Lat: 44.085094,  Lng: -71.349697),  Route carried "on" structure: US 302,  Year Built: 2013,  Status: Open,  Structure Length: 4.31m (14.14ft),  Average Daily Traffic: 2,444 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,617 (year 2042),  Design Load: HL 93,  Features Intersected: SAWYER RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 86.779,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.2m (43.3ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 40.7m (133.5ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 13.2m (43.3ft),  Out-to-Out Width: 14.5m (47.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 53.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 41.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.31m (14.14ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 116025600069,  Location: 0.3 MI FROM BARTLETT TL (Lat: 44.076044,  Lng: -71.335261),  Route carried "on" structure: US 302,  Year Built: 1939,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 2,444 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 3,617 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: STONY BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 88.417,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.6m (31.5ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 83.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Other
Discuss Hart's Location, New Hampshire (NH) on our hugely popular New Hampshire forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.