Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Harpersville, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 19Number of bridges
  • 390ft / 119mTotal length
  • $39,028,000Total costs
  • 62,218Total average daily traffic
  • 7,072Total average daily truck traffic
  • 82,956Total future (year 2034) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Harpersville
  • No street view available for this location

New bridges in Harpersville, AL - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 11960-1969
  • 91980-1989
  • 21990-1999
  • 42000-2009
  • 22010-2019
Average Bridge Daily Traffic in Harpersville, AL
Average Bridge Truck Traffic in Harpersville, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 14.3%Very good
  • 42.9%Good
  • 42.9%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 14.3%Very good
  • 28.6%Good
  • 57.1%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 14.3%Very good
  • 42.9%Good
  • 42.9%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 23.5%Very good
  • 41.2%Good
  • 17.6%Satisfactory
  • 17.6%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 83.3%Good
  • 16.7%Satisfactory
Find on map >>   Show street view

Structure Number: 9755,  Location: 1.9 MI N JCT AL 25 (Lat: 33.287833,  Lng: -86.418833),  Route carried "on" structure: State highway 76,  Year Built: 1968,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 2,890 (year 2022),  Truck Traffic: 16%,  Average Future Daily Traffic: 3,561 (year 2042),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.075,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 38.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.76m (9.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $1,196,000,  Roadway Improvement Cost: $120,000,  Total Project Cost: $1,316,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11532,  Location: .1 MI. E. CO RD 280 (Lat: 33.350450,  Lng: -86.467250),  Route carried "on" structure: US 280,  Year Built: 1931,  Year Reconstructed: 1976,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 18,130 (year 2021),  Truck Traffic: 14%,  Average Future Daily Traffic: 23,848 (year 2041),  Design Load: HS 20,  Features Intersected: MORGAN CREEK
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 39.257,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 63.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.64m (5.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,481,000,  Roadway Improvement Cost: $148,000,  Total Project Cost: $1,629,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 13006,  Location: 0.5 MI. S. OF WEDGEWORTH (Lat: 32.966667,  Lng: -87.750000),  Route carried "on" structure: County highway 30,  Year Built: 1983,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 100 (year 1989),  Average Future Daily Traffic: 300 (year 2034),  Design Load: H 10,  Features Intersected: TRIB. TO DRY CREEK,  Facility Carried by Structure: TREE LIMB ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $233,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $256,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 13007,  Location: CRAIGMONT * LAUDERDALE (Lat: 34.655000,  Lng: -86.578333),  Route carried "on" structure: City street ,  Year Built: 1983,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 460 (year 2017),  Truck Traffic: 1%,  Average Future Daily Traffic: 644 (year 2037),  Design Load: H 20,  Features Intersected: BRANCH,  Facility Carried by Structure: CRAIGMONT DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 2.6m (8.5ft),  Right: 2.6m (8.5ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 63.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.48m (4.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $444,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $488,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 13015,  Location: .5 MI E.OF US 231 (Lat: 32.270603,  Lng: -86.161436),  Route carried "on" structure: County highway 101,  Year Built: 1983,  Status: Open,  Structure Length: 2.93m (9.61ft),  Average Daily Traffic: 300 (year 1988),  Truck Traffic: 1%,  Average Future Daily Traffic: 500 (year 2040),  Design Load: H 10,  Features Intersected: CREEK,  Facility Carried by Structure: MERIWETHER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 71.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 47.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.84m (12.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $789,000,  Roadway Improvement Cost: $79,000,  Total Project Cost: $868,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 13071,  Location: 100' S BRIGHTON CL (Lat: 33.425456,  Lng: -86.953144),  Route carried "on" structure: County highway 59,  Year Built: 1983,  Status: Open,  Structure Length: 3.33m (10.93ft),  Average Daily Traffic: 8,378 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 11,800 (year 2039),  Design Load: HS 20,  Features Intersected: VALLEY CREEK,  Facility Carried by Structure: JAYBIRD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.0m (29.5ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 18.4m (60.4ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 12.7m (41.7ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 62.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.21m (13.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,271,000,  Roadway Improvement Cost: $127,000,  Total Project Cost: $1,398,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 13073,  Location: 1000' E OLD TUSC HWY (Lat: 33.334875,  Lng: -87.011150),  Route carried "on" structure: County highway 451,  Year Built: 1983,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 5,180 (year 2022),  Truck Traffic: 5%,  Average Future Daily Traffic: 7,275 (year 2042),  Design Load: HS 20,  Features Intersected: CREEK,  Facility Carried by Structure: MCADORY SCHOOL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.4m (24.3ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.2m (10.5ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 86.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.66m (5.45ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $728,000,  Roadway Improvement Cost: $73,000,  Total Project Cost: $801,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 13277,  Location: 1.5 MI W JCT I-59 (Lat: 32.874600,  Lng: -87.928800),  Route carried "on" structure: State highway 14,  Year Built: 1984,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 2,207 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 3,111 (year 2041),  Design Load: HS 20,  Features Intersected: Brushy Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 69.097,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 37.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.47m (8.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,356,000,  Roadway Improvement Cost: $136,000,  Total Project Cost: $1,492,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 13355,  Location: 1.5 MI W PICKENSVILLE (Lat: 33.225725,  Lng: -88.292072),  Route carried "on" structure: State highway 86,  Year Built: 1984,  Status: Open,  Structure Length: 84.98m (278.81ft),  Average Daily Traffic: 1,653 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 1,891 (year 2040),  Design Load: HS 20,  Features Intersected: Tombigbee River
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.055,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Navigation Control: Yes ( Vertical Clearance: 15.8m (51.8ft), Horizontal Clearance: 109.7m (359.9ft)),  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 18,  Length of Maximum Span: 114.3m (375.0ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 52.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 84.98m (278.81ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Critical Feature Inspection Date: March 2020,  Underwater Inspection Date: August 2020,  Bridge Improvement Cost: $20,978,000,  Roadway Improvement Cost: $2,098,000,  Total Project Cost: $23,076,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13646,  Location: .8 MI W. AL 25 (Lat: 33.346900,  Lng: -86.450500),  Route carried "on" structure: US 280,  Year Built: 1985,  Status: Open,  Structure Length: 4.94m (16.21ft),  Average Daily Traffic: 8,810 (year 2019),  Truck Traffic: 13%,  Average Future Daily Traffic: 11,588 (year 2039),  Design Load: HS 20,  Features Intersected: SCL RR,  Facility Carried by Structure: AL - 38 WEST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 42.326,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.95m (19.52ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $1,755,000,  Roadway Improvement Cost: $176,000,  Total Project Cost: $1,931,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13647,  Location: US 280 * SCL RR (Lat: 33.346817,  Lng: -86.451383),  Route carried "on" structure: US 280,  Year Built: 1985,  Status: Open,  Structure Length: 4.94m (16.21ft),  Average Daily Traffic: 8,810 (year 2022),  Truck Traffic: 13%,  Average Future Daily Traffic: 11,588 (year 2042),  Design Load: HS 20,  Features Intersected: SCL RR,  Facility Carried by Structure: AL - 38 EAST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 42.326,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.95m (19.52ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $1,755,000,  Roadway Improvement Cost: $176,000,  Total Project Cost: $1,931,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1556,  Location: AL 76 * LOGAN BRANCH (Lat: 33.300483,  Lng: -86.386933),  Route carried "on" structure: State highway 76,  Year Built: 1992,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 3,170 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 3,906 (year 2040),  Design Load: HS 20,  Features Intersected: LOGAN BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.280,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $485,000,  Roadway Improvement Cost: $49,000,  Total Project Cost: $534,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 17396,  Location: .5 MI. W JCT. ST 25 (Lat: 33.290272,  Lng: -86.455867),  Route carried "on" structure: County highway ,  Year Built: 1998,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 202 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 349 (year 2040),  Design Load: HS 20,  Features Intersected: MORGAN CREEK,  Facility Carried by Structure: DEAD HOLLOW ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.2m (20.3ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $385,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $424,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 18185,  Location: .2 MI FROM INT CR 85 *463 (Lat: 33.336906,  Lng: -86.382319),  Route carried "on" structure: County highway 85,  Year Built: 2003,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 1,278 (year 2021),  Average Future Daily Traffic: 1,790 (year 2041),  Design Load: HS 20,  Features Intersected: LOCUST CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 65.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.58m (15.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $942,000,  Roadway Improvement Cost: $94,000,  Total Project Cost: $1,036,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19452,  Location: .25 MI. FROM AL 25 (Lat: 33.336250,  Lng: -86.442425),  Route carried "on" structure: County highway 444,  Year Built: 2004,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 250 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 245 (year 2040),  Design Load: HS 20,  Features Intersected: TANYARD BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.89m (6.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $389,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $428,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 19935,  Location: 0.4 MI WEST AL 25 (Lat: 33.342364,  Lng: -86.445253),  Route carried "on" structure: County highway 434,  Year Built: 2007,  Status: Open,  Structure Length: 0.72m (2.36ft),  Average Daily Traffic: 100 (year 2021),  Average Future Daily Traffic: 140 (year 2041),  Design Load: HS 20,  Features Intersected: W. FORK TANYARD BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 84.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.35m (4.43ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $375,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $413,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 20227,  Location: 0.6 MI FROM AL 25 (Lat: 33.302303,  Lng: -86.455503),  Route carried "on" structure: County highway ,  Year Built: 2009,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 100 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 140 (year 2041),  Design Load: HS 20,  Features Intersected: MORGAN CREEK,  Facility Carried by Structure: DEAD HOLLOW ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 57.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $416,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $458,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 21276,  Location: 0.1 MI. West JCT AL 25 (Lat: 33.302272,  Lng: -86.446825),  Route carried "on" structure: County highway ,  Year Built: 2016,  Status: Open,  Structure Length: 0.84m (2.76ft),  Average Daily Traffic: 150 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 210 (year 2040),  Design Load: HS 20,  Features Intersected: Tanyard Branch,  Facility Carried by Structure: Dead Hollow Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 55.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $243,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $267,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 21546,  Location: _0.25 MI from Narrow Road (Lat: 33.314600,  Lng: -86.456853),  Route carried "on" structure: County highway ,  Year Built: 2019,  Status: Open,  Structure Length: 0.68m (2.23ft),  Average Daily Traffic: 50 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 70 (year 2041),  Design Load: HS 20,  Features Intersected: _MORGAN CREEK,  Facility Carried by Structure: Dead Holl. Rd. N
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 56.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $256,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $282,000 ( Estimate for 2022)
Discuss Harpersville, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.