Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Hansen, Idaho (ID)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 12Number of bridges
  • 171ft / 51.8mTotal length
  • $14,724,000Total costs
  • 60,380Total average daily traffic
  • 16,229Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Hansen
  • No street view available for this location

New bridges in Hansen, ID - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 61960-1969
  • 31970-1979
  • 11990-1999
  • 12010-2019
Average Bridge Daily Traffic in Hansen, ID
Average Bridge Truck Traffic in Hansen, ID
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 22.2%Good
  • 66.7%Satisfactory
  • 11.1%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 11.1%Very good
  • 11.1%Good
  • 77.8%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 11.1%Very good
  • 11.1%Good
  • 66.7%Satisfactory
  • 11.1%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 37.5%Very good
  • 50.0%Good
  • 12.5%Satisfactory
Find on map >>   Show street view

Structure Number: 13646,  Location: 2.6 E. HANSEN (Lat: 42.533194,  Lng: -114.249889),  Route carried "on" structure: US 30,  Year Built: 2011,  Status: Open,  Structure Length: 4.18m (13.71ft),  Average Daily Traffic: 2,700 (year 2019),  Truck Traffic: 19%,  Average Future Daily Traffic: 4,050 (year 2039),  Design Load: HL 93,  Features Intersected: TWIN FALLS MAIN CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 370.351,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: US0,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 9.9m (32.5ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1452,  Location: 8.3 E. TWIN FALLS (Lat: 42.565556,  Lng: -114.300556),  Route carried "on" structure: State highway 50,  Year Built: 1966,  Status: Open,  Structure Length: 23.23m (76.21ft),  Average Daily Traffic: 8,200 (year 2019),  Truck Traffic: 24%,  Average Future Daily Traffic: 12,300 (year 2039),  Design Load: HS 20,  Features Intersected: SNAKE RIVER;HANSEN BR.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.256,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 78.6m (257.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 30.18m (99.02ft),  Designated Inspection Frequency: Every 48 months,  Other Special Inspection Frequency: Every 48 months,  Inspection Date: June 2020,  Other Special Inspection Date: June 2018,  Bridge Improvement Cost: $7,623,000,  Roadway Improvement Cost: $762,000,  Total Project Cost: $11,435,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 14525,  Location: 8.9 E. TWIN FALLS (Lat: 42.576944,  Lng: -114.296306),  Route carried "on" structure: State highway 50,  Year Built: 1964,  Status: Open,  Structure Length: 6.89m (22.60ft),  Average Daily Traffic: 6,700 (year 2019),  Truck Traffic: 15%,  Average Future Daily Traffic: 10,050 (year 2039),  Design Load: HS 20,  Features Intersected: I 84 EB-WB;KIMBERLY IC
Minimum Vertical Clearance: 5.49m (18.01ft),  Kilometerpoint: 7.564,  Lanes on structure: 4,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 21.0m (68.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 2,  Length of Maximum Span: 15.3m (50.2ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 20.9m (68.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.92m (25.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,888,000,  Roadway Improvement Cost: $189,000,  Total Project Cost: $2,831,000 ( Estimate for 2017),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 19451,  Location: 2.7 S. HANSEN (Lat: 42.494167,  Lng: -114.305556),  Route carried "on" structure: County highway 2739,  Year Built: 1995,  Status: Open,  Structure Length: 0.77m (2.53ft),  Average Daily Traffic: 930 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,395 (year 2039),  Design Load: HS 20,  Features Intersected: LOW LINE CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.911,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.7m (25.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 36.8m (120.7ft)

Condition: Channel: Good,  Culverts: Very good,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2018
Find on map >>   Show street view

Structure Number: 19455,  Location: 1.4 N. 0.3 W. HANSEN (Lat: 42.549444,  Lng: -114.306111),  Route carried "on" structure: County highway 2739,  Year Built: 1920,  Year Reconstructed: 1940,  Status: Posted for load,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 2,500 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 3,750 (year 2039),  Design Load: H 15,  Features Intersected: LATERAL 10
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 45.047,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 33.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $305,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $458,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 24865,  Location: 6.2 E. TWIN FALLS (Lat: 42.590278,  Lng: -114.324167),  Route carried "on" structure: County highway ,  Year Built: 1965,  Status: Open,  Structure Length: 6.71m (22.01ft),  Average Daily Traffic: 70 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 105 (year 2039),  Design Load: HS 20,  Features Intersected: I 84;VINYARD RD GS,  Facility Carried by Structure: VINYARD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 161.047,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 2538,  Location: 3.1 S. 2.0 E. KIMBERLY (Lat: 42.489944,  Lng: -114.319222),  Route carried "on" structure: County highway ,  Year Built: 1978,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 70 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 105 (year 2039),  Design Load: HS 20,  Features Intersected: LOW LINE CANAL,  Facility Carried by Structure: 3400 NORTH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 167.481,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 25528,  Location: 1.3 W. 1.3 S. HANSEN (Lat: 42.510361,  Lng: -114.325472),  Route carried "on" structure: County highway ,  Year Built: 1962,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 70 (year 2020),  Average Future Daily Traffic: 105 (year 2040),  Design Load: HS 20,  Features Intersected: PERRINE COULEE CANAL,  Facility Carried by Structure: N 3700 E ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.869,  Lanes on structure: 1,  Owner: Local Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2553,  Location: 3.1 S. 1.0 W. HANSEN (Lat: 42.489250,  Lng: -114.324944),  Route carried "on" structure: County highway ,  Year Built: 1978,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 70 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 105 (year 2039),  Design Load: HS 20,  Features Intersected: LOW LINE CANAL,  Facility Carried by Structure: N 3700 E ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 162.458,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2569,  Location: 0.7 S. 1.2 E. HANSEN (Lat: 42.518714,  Lng: -114.276667),  Route carried "on" structure: County highway ,  Year Built: 1975,  Status: Open,  Structure Length: 4.36m (14.30ft),  Average Daily Traffic: 70 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 105 (year 2039),  Design Load: HS 20,  Features Intersected: TWIN FALLS MAIN CANAL,  Facility Carried by Structure: 3600 NORTH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 180.330,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 34.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 14525,  Location: 8.9 E. TWIN FALLS (Lat: 42.576944,  Lng: -114.296306),  Route carried "under" structure: Interstate 84,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 21,000 (year 2018),  Truck Traffic: 30%,  Features Intersected: I 84 EB-WB;KIMBERLY IC,  Facility Carried by Structure: SH 50
Minimum Vertical Clearance: 5.49m (18.01ft),  Kilometerpoint: 292.719,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.3m (50.2ft)

Find on map >>   Show street view

Structure Number: 24865,  Location: 6.2 E. TWIN FALLS (Lat: 42.590278,  Lng: -114.324167),  Route carried "under" structure: Interstate 84,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 18,000 (year 2018),  Truck Traffic: 34%,  Features Intersected: I 84;VINYARD RD GS,  Facility Carried by Structure: VINYARD ROAD
Minimum Vertical Clearance: 5.51m (18.08ft),  Kilometerpoint: 289.978,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.9m (48.9ft)

Discuss Hansen, Idaho (ID) on our hugely popular Idaho forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.