Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Gibson, Georgia (GA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 12Number of bridges
  • 167ft / 50.8mTotal length
  • $25,051,000Total costs
  • 9,240Total average daily traffic
  • 193Total average daily truck traffic
  • 13,860Total future (year 2031) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Gibson
  • No street view available for this location

New bridges in Gibson, GA - historical statistics
  • New bridges - historical statistics
  • 21950-1959
  • 21960-1969
  • 21970-1979
  • 11980-1989
  • 21990-1999
  • 22000-2009
  • 12010-2019
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 20.0%Very good
  • 80.0%Good
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 20.0%Very good
  • 80.0%Good
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 33.3%Very good
  • 8.3%Good
  • 58.3%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 71.4%Good
  • 28.6%Satisfactory
Find on map >>   Show street view

Structure Number: 1250006,  Location: 4.4 MI N OF GIBSON (Lat: 33.297447,  Lng: -82.598958),  Route carried "on" structure: State highway 171,  Year Built: 1950,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 910 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,365 (year 2031),  Design Load: H 15,  Features Intersected: GIN BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.921,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 93.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $123,000
Find on map >>   Show street view

Structure Number: 125001,  Location: 3 MI E OF GIBSON (Lat: 33.247569,  Lng: -82.547789),  Route carried "on" structure: County highway 1454,  Year Built: 1958,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 520 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 780 (year 2031),  Design Load: H 15,  Features Intersected: DEEP CREEK,  Facility Carried by Structure: STEEPHOLLOW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $156,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $234,000
Find on map >>   Show street view

Structure Number: 1250013,  Location: .75 MI E OF GIBSON (Lat: 33.235050,  Lng: -82.582828),  Route carried "on" structure: State highway 102,  Year Built: 1993,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 2,510 (year 2011),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,765 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: ROCKY COMFORT CREEK O/F
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.703,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 87.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $938,000,  Roadway Improvement Cost: $94,000,  Total Project Cost: $1,407,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1250014,  Location: 1 MI E OF GIBSON (Lat: 33.236719,  Lng: -82.578297),  Route carried "on" structure: State highway 102,  Year Built: 1993,  Status: Open,  Structure Length: 13.41m (44.00ft),  Average Daily Traffic: 2,470 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,705 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: ROCKY COMFORT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.703,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 11,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 87.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: January 2021,  Underwater Inspection Date: May 2021,  Bridge Improvement Cost: $1,719,000,  Roadway Improvement Cost: $172,000,  Total Project Cost: $2,579,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1255001,  Location: 3.3 MI NE OF GIBSON (Lat: 33.256819,  Lng: -82.546078),  Route carried "on" structure: County highway 3,  Year Built: 1974,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 150 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 225 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: DEEP CREEK,  Facility Carried by Structure: BLANKENSHIP MILL R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $94,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $141,000
Find on map >>   Show street view

Structure Number: 1255002,  Location: 2.8 MI NE OF GIBSON (Lat: 33.264489,  Lng: -82.564728),  Route carried "on" structure: County highway 3,  Year Built: 1979,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 110 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 165 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: BEECHTREE CREEK,  Facility Carried by Structure: IRBY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000
Find on map >>   Show street view

Structure Number: 1255003,  Location: 1.7 MI NW OF GIBSON (Lat: 33.255047,  Lng: -82.613108),  Route carried "on" structure: County highway 12,  Year Built: 1985,  Status: Posted for load,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 100 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 150 (year 2031),  Design Load: HS 15,  Features Intersected: ROCKY COMFORT CREEK,  Facility Carried by Structure: CHALKER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $664,000,  Roadway Improvement Cost: $66,000,  Total Project Cost: $996,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1255007,  Location: 2.4 MI SE OF GIBSON (Lat: 33.219947,  Lng: -82.556878),  Route carried "on" structure: County highway 70,  Year Built: 1969,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 100 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 150 (year 2031),  Design Load: H 15,  Features Intersected: DEEP CREEK,  Facility Carried by Structure: USRY MILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $123,000
Find on map >>   Show street view

Structure Number: 125501,  Location: 4.3 MI SE OF MITCHELL (Lat: 33.165078,  Lng: -82.668208),  Route carried "on" structure: County highway 34,  Year Built: 1960,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 60 (year 2011),  Truck Traffic: 8%,  Average Future Daily Traffic: 90 (year 2031),  Design Load: H 15,  Features Intersected: BIG CREEK,  Facility Carried by Structure: BIG CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $123,000
Find on map >>   Show street view

Structure Number: 1255012,  Location: .75 MI N OF GIBSON (Lat: 33.245425,  Lng: -82.595122),  Route carried "on" structure: State highway 171,  Year Built: 2007,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 910 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,365 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: ROCKY COMFORT CREEK O/F
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.484,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Inventory Rating: 63.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $168,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $252,000
Find on map >>   Show street view

Structure Number: 1255013,  Location: .5 MI N OF GIBSON (Lat: 33.239308,  Lng: -82.595228),  Route carried "on" structure: State highway 171,  Year Built: 2007,  Status: Open,  Structure Length: 15.09m (49.51ft),  Average Daily Traffic: 910 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,365 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: ROCKY COMFORT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.484,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 41.1m (134.8ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $1,934,000,  Roadway Improvement Cost: $193,000,  Total Project Cost: $2,901,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1255015,  Location: 3.1 MI SW OF GIBSON (Lat: 33.193669,  Lng: -82.623208),  Route carried "on" structure: County highway 50,  Year Built: 2017,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 490 (year 2017),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2037),  Design Load: HL 93,  Features Intersected: JOES CREEK,  Facility Carried by Structure: LYONS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 84.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.39m (14.40ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: January 2021,  Underwater Inspection Date: May 2021,  Bridge Improvement Cost: $10,656,000,  Roadway Improvement Cost: $1,066,000,  Total Project Cost: $15,984,000 ( Estimate for 2017),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss Gibson, Georgia (GA) on our hugely popular Georgia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.