Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Fulda, Minnesota (MN)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 29Number of bridges
  • 115ft / 34.9mTotal length
  • $1,761,002,000Total costs
  • 10,062Total average daily traffic
  • 1,245Total average daily truck traffic
  • 9,682Total future (year 2029) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Fulda
  • No street view available for this location

New bridges in Fulda, MN - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 11940-1949
  • 21950-1959
  • 41960-1969
  • 31970-1979
  • 61980-1989
  • 21990-1999
  • 82000-2009
  • 22010-2019
Average Bridge Daily Traffic in Fulda, MN
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 50.0%Good
  • 33.3%Satisfactory
  • 16.7%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 16.7%Very good
  • 33.3%Good
  • 33.3%Satisfactory
  • 16.7%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 50.0%Good
  • 16.7%Fair
  • 33.3%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 3.4%Excellent
  • 31.0%Very good
  • 37.9%Good
  • 20.7%Satisfactory
  • 3.4%Fair
  • 3.4%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 8.7%Excellent
  • 65.2%Very good
  • 8.7%Good
  • 17.4%Fair
Find on map >>   Show street view

Structure Number: 51002,  Location: 2.2 MI N OF JCT TH 62 (Lat: 43.899886,  Lng: -95.602272),  Route carried "on" structure: US 59,  Year Built: 1996,  Status: Open,  Structure Length: 2.15m (7.05ft),  Average Daily Traffic: 2,950 (year 2019),  Truck Traffic: 23%,  Average Future Daily Traffic: 2,700 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: LIME CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.0m (68.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 77.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 51508,  Location: 0.3 MI E OF JCT TH 59 (Lat: 43.891472,  Lng: -95.593819),  Route carried "on" structure: County highway 3,  Year Built: 1966,  Status: Posted for load,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 345 (year 2017),  Average Future Daily Traffic: 345 (year 2039),  Design Load: H 20,  Features Intersected: LIME CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Good,  Operating Rating: 42.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 3.35m (10.99ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $650,000,000,  Roadway Improvement Cost: $60,000,000,  Total Project Cost: $710,000,000 ( Estimate for 2020),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 51509,  Location: 1.3 MI E OF JCT TH 59 (Lat: 43.891503,  Lng: -95.572258),  Route carried "on" structure: County highway 3,  Year Built: 1966,  Status: Posted for load,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 345 (year 2017),  Average Future Daily Traffic: 345 (year 2039),  Design Load: H 20,  Features Intersected: LIME CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Good,  Operating Rating: 48.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 33.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 2.38m (7.81ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $510,000,000,  Roadway Improvement Cost: $50,000,000,  Total Project Cost: $560,000,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 51J12,  Location: 0.8 MI W OF JCT CSAH 42 (Lat: 43.905844,  Lng: -95.558906),  Route carried "on" structure: County highway 16,  Year Built: 2000,  Status: Open,  Structure Length: 1.33m (4.36ft),  Average Daily Traffic: 30 (year 2000),  Average Future Daily Traffic: 30 (year 2029),  Design Load: HS 25 or greater,  Features Intersected: LIME CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.8m (12.5ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 68.6 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2020
Find on map >>   Show street view

Structure Number: 51J13,  Location: 0.7 MI N OF JCT CSAH 3 (Lat: 43.900539,  Lng: -95.562667),  Route carried "on" structure: County highway 38,  Year Built: 2000,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 30 (year 2000),  Average Future Daily Traffic: 30 (year 2029),  Design Load: HS 25 or greater,  Features Intersected: LIME CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 68.6 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2020
Find on map >>   Show street view

Structure Number: 51J21,  Location: 0.3 MI E OF JCT CR 68 (Lat: 43.877144,  Lng: -95.656486),  Route carried "on" structure: County highway 9,  Year Built: 2002,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 30 (year 1990),  Average Future Daily Traffic: 30 (year 2029),  Design Load: HS 25 or greater,  Features Intersected: Jack Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2020
Find on map >>   Show street view

Structure Number: 51J31,  Location: 0.1 mi N of jct CSAH 2 (Lat: 43.871222,  Lng: -95.643081),  Route carried "on" structure: County highway 171,  Year Built: 2002,  Status: Open,  Structure Length: 1.26m (4.13ft),  Average Daily Traffic: 44 (year 1990),  Average Future Daily Traffic: 44 (year 2029),  Design Load: HS 25 or greater,  Features Intersected: Jack Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.5m (14.8ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 58.8 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2020
Find on map >>   Show street view

Structure Number: 51X01,  Location: 2.7 MI E OF JCT TH 59 (Lat: 43.862400,  Lng: -95.541594),  Route carried "on" structure: State highway 62,  Year Built: 2014,  Status: Open,  Structure Length: 0.84m (2.76ft),  Average Daily Traffic: 970 (year 2019),  Truck Traffic: 24%,  Average Future Daily Traffic: 990 (year 2039),  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.5m (11.5ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Inventory Rating: 35.9 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2021
Find on map >>   Show street view

Structure Number: 53002,  Location: 3.8 MI S OF JCT TH 62 (Lat: 43.816581,  Lng: -95.592636),  Route carried "on" structure: US 59,  Year Built: 1980,  Status: Open,  Structure Length: 2.92m (9.58ft),  Average Daily Traffic: 3,350 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,200 (year 2039),  Design Load: HS 20,  Features Intersected: NORTH BRANCH JACK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.3m (92.8ft),  Curb-To-Curb Width: 14.3m (46.9ft),  Out-to-Out Width: 15.3m (50.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 55.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 53512,  Location: 0.3 MI W OF JCT TH 59 (Lat: 43.819650,  Lng: -95.599275),  Route carried "on" structure: County highway 18,  Year Built: 1966,  Status: Open,  Structure Length: 1.78m (5.84ft),  Average Daily Traffic: 195 (year 2015),  Average Future Daily Traffic: 195 (year 2039),  Design Load: H 20,  Features Intersected: JACK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 46.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 53J31,  Location: 0.5 MI E OF JCT TH 59 (Lat: 43.804775,  Lng: -95.580006),  Route carried "on" structure: County highway 175,  Year Built: 2000,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 40 (year 2000),  Average Future Daily Traffic: 40 (year 2029),  Design Load: HS 25 or greater,  Features Intersected: N BRANCH OF JACK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.2m (13.8ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 68.6 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2018
Find on map >>   Show street view

Structure Number: 53J32,  Location: 0.4 MI N OF JCT CSAH 18 (Lat: 43.825206,  Lng: -95.633067),  Route carried "on" structure: County highway 87,  Year Built: 2000,  Status: Open,  Structure Length: 0.63m (2.07ft),  Average Daily Traffic: 40 (year 2000),  Average Future Daily Traffic: 40 (year 2029),  Design Load: HS 25 or greater,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 68.6 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2018
Find on map >>   Show street view

Structure Number: 53J51,  Location: 0.3 MI N OF JCT CSAH 18 (Lat: 43.824992,  Lng: -95.552242),  Route carried "on" structure: County highway 174,  Year Built: 2004,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 14 (year 2001),  Average Future Daily Traffic: 14 (year 2029),  Design Load: HS 25 or greater,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 58.8 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.34m (1.12ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2018,  Bridge Improvement Cost: $49,000,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $1,000
Find on map >>   Show street view

Structure Number: 53J52,  Location: 1.3 MI W OF JCT TH 59 (Lat: 43.834264,  Lng: -95.619478),  Route carried "on" structure: County highway 172,  Year Built: 2004,  Status: Open,  Structure Length: 0.87m (2.85ft),  Average Daily Traffic: 43 (year 2003),  Average Future Daily Traffic: 43 (year 2029),  Design Load: HS 25 or greater,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.0m (13.1ft)

Condition: Channel: Excellent,  Culverts: Excellent,  Operating Rating: 58.8 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.43m (1.41ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2018,  Bridge Improvement Cost: $64,000,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $1,000
Find on map >>   Show street view

Structure Number: 53J84,  Location: 0.7 MI W OF JCT TH 59 (Lat: 43.834233,  Lng: -95.606353),  Route carried "on" structure: County highway 172,  Year Built: 2014,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 49 (year 2014),  Average Future Daily Traffic: 49 (year 2034),  Design Load: HL 93,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.9m (16.1ft)

Condition: Channel: Satisfactory,  Culverts: Excellent,  Operating Rating: 58.8 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Structural Evaluation: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2020
Find on map >>   Show street view

Structure Number: 91984,  Location: 1.1 MI S OF JCT CSAH 18 (Lat: 43.803747,  Lng: -95.633106),  Route carried "on" structure: County highway 87,  Year Built: 1979,  Status: Open,  Structure Length: 0.71m (2.33ft),  Average Daily Traffic: 31 (year 1986),  Average Future Daily Traffic: 31 (year 2029),  Design Load: HS 20,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.1m (10.2ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Inventory Rating: 35.9 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2018
Find on map >>   Show street view

Structure Number: 93351,  Location: 1.1 MI E OF JCT CSAH 36 (Lat: 43.869950,  Lng: -95.639756),  Route carried "on" structure: County highway 2,  Year Built: 1978,  Status: Open,  Structure Length: 1.00m (3.28ft),  Average Daily Traffic: 840 (year 2017),  Average Future Daily Traffic: 840 (year 2039),  Design Load: HS 20,  Features Intersected: JACK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Inventory Rating: 35.9 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2020
Find on map >>   Show street view

Structure Number: 95235,  Location: 0.1 MI S OF JCT CSAH 18 (Lat: 43.817986,  Lng: -95.632992),  Route carried "on" structure: County highway 87,  Year Built: 1980,  Status: Open,  Structure Length: 1.21m (3.97ft),  Average Daily Traffic: 29 (year 1986),  Average Future Daily Traffic: 29 (year 2029),  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Inventory Rating: 35.9 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2020
Find on map >>   Show street view

Structure Number: 95255,  Location: 0.6 MI E OF JCT TH 59 (Lat: 43.847981,  Lng: -95.581781),  Route carried "on" structure: County highway 1027,  Year Built: 1980,  Status: Open,  Structure Length: 0.69m (2.26ft),  Average Daily Traffic: 47 (year 1986),  Average Future Daily Traffic: 47 (year 2029),  Design Load: HS 20,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.6m (8.5ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Inventory Rating: 35.9 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020
Find on map >>   Show street view

Structure Number: 95739,  Location: 1.2 MI N OF JCT CSAH 18 (Lat: 43.836056,  Lng: -95.572725),  Route carried "on" structure: County highway 75,  Year Built: 1982,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 33 (year 1986),  Average Future Daily Traffic: 33 (year 2029),  Design Load: HS 20,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.2m (7.2ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Inventory Rating: 35.9 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020
Find on map >>   Show street view

Structure Number: 95803,  Location: 1.2 MI N OF JCT CSAH 18 (Lat: 43.836142,  Lng: -95.612833),  Route carried "on" structure: County highway 86,  Year Built: 1989,  Status: Open,  Structure Length: 1.56m (5.12ft),  Average Daily Traffic: 40 (year 1988),  Average Future Daily Traffic: 40 (year 2029),  Design Load: HS 20,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Inventory Rating: 35.9 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2020
Find on map >>   Show street view

Structure Number: 95804,  Location: 1.6 MI W OF JCT TH 59 (Lat: 43.848019,  Lng: -95.624731),  Route carried "on" structure: County highway 1026,  Year Built: 1992,  Status: Open,  Structure Length: 1.48m (4.86ft),  Average Daily Traffic: 49 (year 1994),  Average Future Daily Traffic: 49 (year 2029),  Design Load: HS 20,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.9m (12.8ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Inventory Rating: 35.9 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2018
Find on map >>   Show street view

Structure Number: 97567,  Location: 0.2 MI N OF JCT CSAH 18 (Lat: 43.821194,  Lng: -95.653083),  Route carried "on" structure: County highway 152,  Year Built: 1988,  Status: Open,  Structure Length: 0.66m (2.17ft),  Average Daily Traffic: 34 (year 1986),  Average Future Daily Traffic: 34 (year 2029),  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 39.2 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Inventory Rating: 26.1 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020
Find on map >>   Show street view

Structure Number: L156,  Location: 0.2 MI E OF JCT CR 68 (Lat: 43.891711,  Lng: -95.660675),  Route carried "on" structure: County highway 72,  Year Built: 1941,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 35 (year 2013),  Average Future Daily Traffic: 35 (year 2034),  Features Intersected: JACK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.3m (10.8ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Inventory Rating: 35.9 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $155,000,000,  Roadway Improvement Cost: $5,000,000,  Total Project Cost: $160,000,000 ( Estimate for 2018)
Find on map >>   Show street view

Structure Number: L1561,  Location: 0.4 MI W OF JCT CSAH 42 (Lat: 43.920425,  Lng: -95.550147),  Route carried "on" structure: County highway 20,  Year Built: 1917,  Status: Open,  Structure Length: 1.05m (3.44ft),  Average Daily Traffic: 10 (year 1989),  Average Future Daily Traffic: 10 (year 2029),  Features Intersected: LIME CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Poor,  Culverts: Fair,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Inventory Rating: 35.9 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020
Find on map >>   Show street view

Structure Number: L3365,  Location: 1.9 MI W OF JCT TH 59 (Lat: 43.819711,  Lng: -95.632417),  Route carried "on" structure: County highway 18,  Year Built: 1959,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 195 (year 2015),  Average Future Daily Traffic: 195 (year 2039),  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Fair,  Operating Rating: 29.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Inventory Rating: 19.6 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.34m (1.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $63,000,000,  Roadway Improvement Cost: $8,000,000,  Total Project Cost: $129,000,000
Find on map >>   Show street view

Structure Number: L3366,  Location: 1.2 MI E OF JCT CSAH 7 (Lat: 43.819764,  Lng: -95.648981),  Route carried "on" structure: County highway 18,  Year Built: 1959,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 195 (year 2015),  Average Future Daily Traffic: 195 (year 2039),  Features Intersected: DITCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Fair,  Operating Rating: 29.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Inventory Rating: 19.6 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.34m (1.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $63,000,000,  Roadway Improvement Cost: $13,000,000,  Total Project Cost: $202,000,000
Find on map >>   Show street view

Structure Number: L9021,  Location: 0.2 MI N OF JCT CSAH 18 (Lat: 43.821878,  Lng: -95.633008),  Route carried "on" structure: County highway 87,  Year Built: 1964,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 32 (year 1986),  Average Future Daily Traffic: 32 (year 2029),  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 51.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: L9827,  Location: 1.2 MI E OF JCT CSAH 36 (Lat: 43.862642,  Lng: -95.638175),  Route carried "on" structure: County highway 2,  Year Built: 1978,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 17 (year 1990),  Average Future Daily Traffic: 17 (year 2029),  Design Load: HS 20,  Features Intersected: JACK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Inventory Rating: 35.9 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020
Discuss Fulda, Minnesota (MN) on our hugely popular Minnesota forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.