Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Fort Deposit, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 28Number of bridges
  • 279ft / 84.8mTotal length
  • $31,819,000Total costs
  • 224,285Total average daily traffic
  • 52,017Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Fort Deposit
  • No street view available for this location

New bridges in Fort Deposit, AL - historical statistics
  • New bridges - historical statistics
  • 51950-1959
  • 151960-1969
  • 11970-1979
  • 21980-1989
  • 41990-1999
  • 12000-2009
Average Bridge Daily Traffic in Fort Deposit, AL
Average Bridge Truck Traffic in Fort Deposit, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.0%Good
  • 30.0%Satisfactory
  • 60.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 10.0%Good
  • 80.0%Satisfactory
  • 10.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 30.0%Good
  • 50.0%Satisfactory
  • 20.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 9.5%Very good
  • 38.1%Good
  • 42.9%Satisfactory
  • 4.8%Fair
  • 4.8%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Very good
  • 13.3%Good
  • 33.3%Satisfactory
  • 13.3%Fair
  • 6.7%Poor
Find on map >>   Show street view

Structure Number: 3631,  Location: 1.0MI N OF C.R.77 (Lat: 31.931667,  Lng: -86.536667),  Route carried "on" structure: US 31,  Year Built: 1950,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 1,930 (year 2013),  Truck Traffic: 16%,  Average Future Daily Traffic: 2,479 (year 2033),  Design Load: H 15,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 235.350,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 70.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $495,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $545,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 3632,  Location: 08.2 MI N JCT AL 10 (Lat: 31.937767,  Lng: -86.529353),  Route carried "on" structure: US 31,  Year Built: 1950,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 1,930 (year 2013),  Truck Traffic: 16%,  Average Future Daily Traffic: 2,479 (year 2033),  Design Load: HS 20,  Features Intersected: PIGEON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 236.768,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 56.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.20m (20.34ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,276,000,  Roadway Improvement Cost: $128,000,  Total Project Cost: $1,404,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 3633,  Location: 9.0 MI N OF JCT AL 10 (Lat: 31.946472,  Lng: -86.520233),  Route carried "on" structure: US 31,  Year Built: 1950,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 1,370 (year 2013),  Truck Traffic: 22%,  Average Future Daily Traffic: 1,760 (year 2033),  Design Load: HS 20,  Features Intersected: PINEYWOOD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 238.020,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Fair,  Operating Rating: 56.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.12m (16.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,053,000,  Roadway Improvement Cost: $105,000,  Total Project Cost: $1,158,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 3635,  Location: 0.6MI N BUTLER CO LINE (Lat: 31.970836,  Lng: -86.498769),  Route carried "on" structure: US 31,  Year Built: 1950,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 1,230 (year 2013),  Truck Traffic: 23%,  Average Future Daily Traffic: 1,580 (year 2033),  Design Load: H 15,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 241.435,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 86.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.68m (5.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $650,000,  Roadway Improvement Cost: $65,000,  Total Project Cost: $715,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 4871,  Location: 2MI N. OF SR185 (Lat: 32.019806,  Lng: -86.555472),  Route carried "on" structure: County highway 37,  Year Built: 1954,  Status: Posted for load,  Structure Length: 4.01m (13.16ft),  Average Daily Traffic: 660 (year 2015),  Truck Traffic: 5%,  Average Future Daily Traffic: 720 (year 2035),  Design Load: H 15,  Features Intersected: CS XRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 36.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 4.97m (16.31ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $784,000,  Roadway Improvement Cost: $78,000,  Total Project Cost: $862,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7435,  Location: 1.2 MI.W.BETHEL CHURCH (Lat: 31.952900,  Lng: -86.482250),  Route carried "on" structure: County highway 60,  Year Built: 1961,  Status: Open,  Structure Length: 0.78m (2.56ft),  Average Daily Traffic: 145 (year 2018),  Truck Traffic: 28%,  Average Future Daily Traffic: 220 (year 2040),  Design Load: HS 20,  Features Intersected: BRANCH OF THREE RUNCREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 49.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.44m (4.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $332,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $365,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8982,  Location: CO RD 75 OVER I65 (Lat: 31.960283,  Lng: -86.542667),  Route carried "on" structure: County highway 75,  Year Built: 1966,  Status: Open,  Structure Length: 9.66m (31.69ft),  Average Daily Traffic: 610 (year 2009),  Truck Traffic: 1%,  Average Future Daily Traffic: 635 (year 2029),  Design Load: H 20,  Features Intersected: I65
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.239,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.0m (82.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 66.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.60m (34.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $2,036,000,  Roadway Improvement Cost: $204,000,  Total Project Cost: $2,240,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8983,  Location: 0.2 MI N OF CO RD 75 (Lat: 31.962517,  Lng: -86.540400),  Route carried "on" structure: Interstate 65,  Year Built: 1966,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 29,840 (year 2013),  Truck Traffic: 24%,  Average Future Daily Traffic: 37,805 (year 2033),  Design Load: H 20,  Features Intersected: PINEY WOODS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 224.990,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $3,174,000,  Roadway Improvement Cost: $317,000,  Total Project Cost: $3,491,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8984,  Location: 0.5 MI.N.OF BUTLER CO. (Lat: 31.971139,  Lng: -86.534572),  Route carried "on" structure: Interstate 65,  Year Built: 1966,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 14,920 (year 2013),  Truck Traffic: 24%,  Average Future Daily Traffic: 18,902 (year 2033),  Design Load: H 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 226.122,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 14 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.34m (7.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $1,891,000,  Roadway Improvement Cost: $189,000,  Total Project Cost: $2,080,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8985,  Location: 0.8 MI.N.OF BUTLER CO. (Lat: 31.974731,  Lng: -86.534489),  Route carried "on" structure: Interstate 65,  Year Built: 1966,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 14,920 (year 2013),  Truck Traffic: 24%,  Average Future Daily Traffic: 18,902 (year 2033),  Design Load: H 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 226.510,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 14 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Poor,  Culverts: Poor,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.07m (6.79ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2022,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $1,521,000,  Roadway Improvement Cost: $152,000,  Total Project Cost: $1,673,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8986,  Location: I65 * AL.185 INTERCHANGE (Lat: 31.983686,  Lng: -86.531033),  Route carried "on" structure: Ramp Interstate 65,  Year Built: 1966,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 2,984 (year 2013),  Truck Traffic: 24%,  Average Future Daily Traffic: 3,780 (year 2033),  Design Load: H 20,  Features Intersected: BRANCH,  Facility Carried by Structure: S.W.RAMP A
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 227.598,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $260,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $286,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8988,  Location: I65 * AL.185 INTERCHANGE (Lat: 31.986667,  Lng: -86.528333),  Route carried "on" structure: Ramp Interstate 65,  Year Built: 1966,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 2,785 (year 2013),  Truck Traffic: 24%,  Average Future Daily Traffic: 3,528 (year 2033),  Design Load: H 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 227.954,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $537,000,  Roadway Improvement Cost: $54,000,  Total Project Cost: $591,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8989,  Location: 4.5 MI.N.OF BUTLER CO. (Lat: 32.025636,  Lng: -86.512414),  Route carried "on" structure: County highway 33,  Year Built: 1966,  Status: Open,  Structure Length: 8.08m (26.51ft),  Average Daily Traffic: 628 (year 2009),  Truck Traffic: 1%,  Average Future Daily Traffic: 654 (year 2029),  Design Load: H 20,  Features Intersected: I65,  Facility Carried by Structure: CO RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.029,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 50.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.08m (29.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $1,744,000,  Roadway Improvement Cost: $174,000,  Total Project Cost: $1,918,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 899,  Location: 4.7 MI.N.OF BUTLER CO. (Lat: 32.028122,  Lng: -86.511281),  Route carried "on" structure: Interstate 65,  Year Built: 1966,  Status: Open,  Structure Length: 8.29m (27.20ft),  Average Daily Traffic: 13,925 (year 2013),  Truck Traffic: 24%,  Average Future Daily Traffic: 17,642 (year 2033),  Design Load: HS 20,  Features Intersected: BIG SWAMP CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 232.872,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 13 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.29m (30.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $2,102,000,  Roadway Improvement Cost: $210,000,  Total Project Cost: $2,312,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8991,  Location: 4.7 MI.N.OF BUTLER CO. (Lat: 32.027958,  Lng: -86.511089),  Route carried "on" structure: Interstate 65,  Year Built: 1966,  Status: Open,  Structure Length: 8.29m (27.20ft),  Average Daily Traffic: 13,925 (year 2013),  Truck Traffic: 24%,  Average Future Daily Traffic: 17,642 (year 2033),  Design Load: HS 20,  Features Intersected: BIG SWAMP CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 232.872,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 13 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.29m (30.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $2,102,000,  Roadway Improvement Cost: $210,000,  Total Project Cost: $2,312,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9028,  Location: 2 MI NORTH OF AL 185 (Lat: 32.011075,  Lng: -86.511061),  Route carried "on" structure: County highway ,  Year Built: 1993,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 110 (year 2003),  Truck Traffic: 5%,  Average Future Daily Traffic: 140 (year 2028),  Design Load: HS 20,  Features Intersected: CREEK,  Facility Carried by Structure: GOLSON RD 185-37
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 80.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.81m (5.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $500,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $550,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 9263,  Location: 5.4 MI N OF CO RD 45 (Lat: 31.945150,  Lng: -86.559539),  Route carried "on" structure: Interstate 65,  Year Built: 1967,  Status: Open,  Structure Length: 8.23m (27.00ft),  Average Daily Traffic: 14,920 (year 2013),  Truck Traffic: 24%,  Average Future Daily Traffic: 18,902 (year 2033),  Design Load: HS 20,  Features Intersected: PIGEON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 222.386,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 14 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.23m (30.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $2,088,000,  Roadway Improvement Cost: $209,000,  Total Project Cost: $2,297,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9264,  Location: 5.4 MI N OF CO 45 (Lat: 31.945161,  Lng: -86.559172),  Route carried "on" structure: Interstate 65,  Year Built: 1967,  Status: Open,  Structure Length: 8.23m (27.00ft),  Average Daily Traffic: 14,920 (year 2013),  Truck Traffic: 24%,  Average Future Daily Traffic: 18,902 (year 2033),  Design Load: HS 20,  Features Intersected: PIGEON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 222.386,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 14 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.23m (30.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $2,088,000,  Roadway Improvement Cost: $209,000,  Total Project Cost: $2,297,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12796,  Location: 2.5 MI NW OF FT DEPOSIT (Lat: 32.013203,  Lng: -86.618922),  Route carried "on" structure: County highway 45,  Year Built: 1982,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 710 (year 2003),  Truck Traffic: 5%,  Average Future Daily Traffic: 730 (year 2030),  Design Load: H 15,  Features Intersected: BEAVER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 58.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $330,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $363,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 12834,  Location: 3.0 MI.S.OF I65 (Lat: 31.985000,  Lng: -86.576667),  Route carried "on" structure: State highway 185,  Year Built: 1982,  Status: Open,  Structure Length: 3.84m (12.60ft),  Average Daily Traffic: 3,570 (year 2013),  Truck Traffic: 2%,  Average Future Daily Traffic: 4,399 (year 2033),  Design Load: HS 20,  Features Intersected: L*N RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.799,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.0m (45.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 66.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 4.78m (15.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,114,000,  Roadway Improvement Cost: $111,000,  Total Project Cost: $1,225,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15085,  Location: 3 MI NORTH OF AL 185 (Lat: 32.019711,  Lng: -86.505206),  Route carried "on" structure: County highway ,  Year Built: 1990,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 100 (year 2003),  Average Future Daily Traffic: 120 (year 2028),  Design Load: HS 20,  Features Intersected: CREEK,  Facility Carried by Structure: GOLSON RD 185-37
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $315,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $347,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 15907,  Location: 2.0 MI. NE SEARCY (Lat: 31.919300,  Lng: -86.580500),  Route carried "on" structure: County highway 45,  Year Built: 1993,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 383 (year 2018),  Truck Traffic: 16%,  Average Future Daily Traffic: 475 (year 2040),  Design Load: HS 20,  Features Intersected: HALLS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 67.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $562,000,  Roadway Improvement Cost: $56,000,  Total Project Cost: $618,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 16795,  Location: 3MI S OF CO37 (Lat: 32.022089,  Lng: -86.506825),  Route carried "on" structure: County highway ,  Year Built: 1970,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 2.23m (7.32ft),  Average Daily Traffic: 120 (year 2003),  Truck Traffic: 5%,  Average Future Daily Traffic: 120 (year 2028),  Design Load: HS 20,  Features Intersected: BIG SWAMP CREEK,  Facility Carried by Structure: GOLSON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 68.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.04m (9.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $1,036,000,  Roadway Improvement Cost: $104,000,  Total Project Cost: $1,140,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 17149,  Location: 1 MI S CO 37 (Lat: 32.046369,  Lng: -86.542450),  Route carried "on" structure: County highway ,  Year Built: 1998,  Status: Open,  Structure Length: 1.56m (5.12ft),  Average Daily Traffic: 100 (year 2003),  Average Future Daily Traffic: 150 (year 2035),  Design Load: HS 20,  Features Intersected: BALLARDS CRK.,  Facility Carried by Structure: GOLSON RD 185-37
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 74.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.24m (7.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $544,000,  Roadway Improvement Cost: $54,000,  Total Project Cost: $598,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 18653,  Location: 1 MI E OF CO 75 (Lat: 31.971314,  Lng: -86.548864),  Route carried "on" structure: County highway ,  Year Built: 2003,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 20 (year 2003),  Average Future Daily Traffic: 30 (year 2028),  Design Load: HS 20,  Features Intersected: AVINGER BRANCH,  Facility Carried by Structure: REED RD. 185 TO 75
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $393,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $432,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 8982,  Location: CO RD 75 OVER I65 (Lat: 31.960283,  Lng: -86.542667),  Route carried "under" structure: Interstate 65,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 29,840 (year 2013),  Truck Traffic: 24%,  Features Intersected: I65,  Facility Carried by Structure: CO RD 75
Minimum Vertical Clearance: 6.48m (21.26ft),  Kilometerpoint: 224.635,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.0m (82.0ft)

Find on map >>   Show street view

Structure Number: 8989,  Location: 4.5 MI.N.OF BUTLER CO. (Lat: 32.025636,  Lng: -86.512414),  Route carried "under" structure: Interstate 65,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 27,850 (year 2013),  Truck Traffic: 24%,  Features Intersected: I65,  Facility Carried by Structure: CO RD.
Minimum Vertical Clearance: 5.42m (17.78ft),  Kilometerpoint: 232.592,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 22.3m (73.2ft)

Find on map >>   Show street view

Structure Number: 9178,  Location: INT. I-65 * AL 185 (Lat: 31.985000,  Lng: -86.528333),  Route carried "under" structure: Interstate 65,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 29,840 (year 2013),  Truck Traffic: 24%,  Features Intersected: I-65,  Facility Carried by Structure: AL 185
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 227.775,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 20.7m (67.9ft)

Discuss Fort Deposit, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.