Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Folsom, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 22Number of bridges
  • 240ft / 73.1mTotal length
  • $45,694,000Total costs
  • 8,739Total average daily traffic
  • 974Total average daily truck traffic
  • 12,376Total future (year 2030) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Folsom
  • No street view available for this location

New bridges in Folsom, AL - historical statistics
  • New bridges - historical statistics
  • 41930-1939
  • 11940-1949
  • 11950-1959
  • 21960-1969
  • 51970-1979
  • 31980-1989
  • 61990-1999
Average Bridge Daily Traffic in Folsom, AL
Average Bridge Truck Traffic in Folsom, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 7.7%Very good
  • 23.1%Good
  • 38.5%Satisfactory
  • 30.8%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 15.4%Very good
  • 23.1%Good
  • 15.4%Satisfactory
  • 38.5%Fair
  • 7.7%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 15.4%Very good
  • 15.4%Good
  • 23.1%Satisfactory
  • 38.5%Fair
  • 7.7%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 4.5%Very good
  • 36.4%Good
  • 54.5%Satisfactory
  • 4.5%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Very good
  • 33.3%Good
  • 22.2%Satisfactory
  • 11.1%Fair
Find on map >>   Show street view

Structure Number: 954,  Location: 1 MI NORTH NEWELL (Lat: 33.446000,  Lng: -85.437000),  Route carried "on" structure: County highway ,  Year Built: 1932,  Status: Posted for load,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 50 (year 1997),  Average Future Daily Traffic: 126 (year 2035),  Design Load: H 10,  Features Intersected: COHOBADIAH CREEK,  Facility Carried by Structure: CO RD 417
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 4.0m (13.1ft),  Out-to-Out Width: 4.0m (13.1ft)

Condition: Deck: Satisfactory,  Superstructure: Serious,  Substructure: Serious,  Channel: Satisfactory,  Operating Rating: 2.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 1.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 3 months,  Inspection Date: June 2021,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $144,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $158,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 1617,  Location: 9.8 MI W JCT I65 * US278 (Lat: 34.204358,  Lng: -87.023031),  Route carried "on" structure: US 278,  Year Built: 1937,  Status: Open,  Structure Length: 9.14m (29.99ft),  Average Daily Traffic: 5,014 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 7,020 (year 2040),  Design Load: H 15,  Features Intersected: CROOKED CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 108.684,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 4,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 47.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 29.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.11m (33.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $1,871,000,  Roadway Improvement Cost: $187,000,  Total Project Cost: $2,058,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1701,  Location: FOSTER(WOOD)2.0MI NE (Lat: 33.434500,  Lng: -85.588800),  Route carried "on" structure: County highway ,  Year Built: 1938,  Status: Posted for load,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 35 (year 1991),  Average Future Daily Traffic: 75 (year 2030),  Features Intersected: BUCKANNON CREEK,  Facility Carried by Structure: CO RD 269
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 24.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: High priority of replacement,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 1.84m (6.04ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: September 2020,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $176,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $194,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 1702,  Location: 2.3MI E CAVER CR CHURCH (Lat: 33.401000,  Lng: -85.448700),  Route carried "on" structure: County highway ,  Year Built: 1938,  Status: Posted for load,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 73 (year 1990),  Average Future Daily Traffic: 105 (year 2030),  Features Intersected: WOLF CREEK,  Facility Carried by Structure: CO RD 532
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.3m (37.1ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 3.7m (12.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 14.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 10.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $148,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $163,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 3487,  Location: 1MI E FOSTERS X RD (Lat: 33.421400,  Lng: -85.538200),  Route carried "on" structure: County highway 82,  Year Built: 1949,  Status: Posted for load,  Structure Length: 6.22m (20.41ft),  Average Daily Traffic: 420 (year 1990),  Truck Traffic: 30%,  Average Future Daily Traffic: 581 (year 2035),  Design Load: H 15,  Features Intersected: PINEY WOOD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.649,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 7.26m (23.82ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $1,195,000,  Roadway Improvement Cost: $120,000,  Total Project Cost: $1,315,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3615,  Location: 1.5MI EAST FOLSOM SCHOOL (Lat: 33.457900,  Lng: -85.529200),  Route carried "on" structure: ServiceCounty highway ,  Year Built: 1992,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 20 (year 1997),  Average Future Daily Traffic: 70 (year 2030),  Design Load: HS 20,  Features Intersected: PINEYWOOD CREEK,  Facility Carried by Structure: CO RD 208
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 65.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $730,000,  Roadway Improvement Cost: $73,000,  Total Project Cost: $803,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 6697,  Location: 0.6MI S CENTER WEST (Lat: 33.425000,  Lng: -85.623300),  Route carried "on" structure: County highway 113,  Year Built: 1959,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 135 (year 1991),  Truck Traffic: 10%,  Average Future Daily Traffic: 189 (year 2030),  Design Load: HS 20,  Features Intersected: LITTLE KETCHEPEDRAKEE CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.479,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 54.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $458,000,  Roadway Improvement Cost: $46,000,  Total Project Cost: $504,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7781,  Location: SIMPSON CULVERT)W PINEHIL (Lat: 33.457000,  Lng: -85.421900),  Route carried "on" structure: County highway 92,  Year Built: 1962,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 250 (year 1997),  Truck Traffic: 30%,  Average Future Daily Traffic: 329 (year 2030),  Design Load: H 10,  Features Intersected: COHOBADIAH CREEK
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 3.700,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 17.7m (58.1ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 79.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.84m (6.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $636,000,  Roadway Improvement Cost: $64,000,  Total Project Cost: $700,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8722,  Location: 0.5MI S JORDAN CHAPEL (Lat: 33.450000,  Lng: -85.497100),  Route carried "on" structure: County highway 17,  Year Built: 1965,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 235 (year 1990),  Truck Traffic: 15%,  Average Future Daily Traffic: 329 (year 2030),  Design Load: HS 20,  Features Intersected: BRANCH,  Facility Carried by Structure: C0. RD. 47
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.080,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 61.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $382,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $420,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11235,  Location: 1.8MI S GOLD RIDGE (Lat: 33.470900,  Lng: -85.377200),  Route carried "on" structure: County highway 37,  Year Built: 1974,  Status: Posted for load,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 320 (year 1990),  Truck Traffic: 15%,  Average Future Daily Traffic: 448 (year 2035),  Features Intersected: KNOKES CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.789,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 8.5m (27.9ft),  Right: 8.5m (27.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 41.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 2.23m (7.32ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $368,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $405,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11475,  Location: (FOSTER BR)WEST FOSTXRDS (Lat: 33.410600,  Lng: -85.594700),  Route carried "on" structure: County highway 82,  Year Built: 1975,  Status: Open,  Structure Length: 14.20m (46.59ft),  Average Daily Traffic: 310 (year 1990),  Truck Traffic: 20%,  Average Future Daily Traffic: 454 (year 2030),  Design Load: HS 20,  Features Intersected: TALLAPOOSA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.999,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 4,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 38.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 15.00m (49.21ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2021,  Underwater Inspection Date: July 2019,  Bridge Improvement Cost: $2,365,000,  Roadway Improvement Cost: $237,000,  Total Project Cost: $2,602,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11479,  Location: LEE BRIDGE (Lat: 33.438400,  Lng: -85.610600),  Route carried "on" structure: County highway 88,  Year Built: 1975,  Status: Open,  Structure Length: 14.66m (48.10ft),  Average Daily Traffic: 212 (year 1990),  Truck Traffic: 21%,  Average Future Daily Traffic: 297 (year 2030),  Design Load: H 20,  Features Intersected: TALLAPOOSA RIVER FAS 18
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 3,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 41.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 15.44m (50.66ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2021,  Underwater Inspection Date: July 2019,  Bridge Improvement Cost: $2,541,000,  Roadway Improvement Cost: $254,000,  Total Project Cost: $2,795,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1195,  Location: RICE MILL 3MI.S OF FOSTER (Lat: 33.389600,  Lng: -85.516900),  Route carried "on" structure: County highway ,  Year Built: 1978,  Status: Posted for load,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 25 (year 1997),  Average Future Daily Traffic: 75 (year 2035),  Design Load: H 10,  Features Intersected: PINEYWOOD CREEK,  Facility Carried by Structure: CO RD 270
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 4.0m (13.1ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 5.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 3.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.02m (6.63ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $194,000,  Roadway Improvement Cost: $19,000,  Total Project Cost: $213,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 11952,  Location: 1.4MI NE PINE HILL (Lat: 33.484200,  Lng: -85.402300),  Route carried "on" structure: County highway ,  Year Built: 1978,  Status: Posted for load,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 75 (year 1997),  Average Future Daily Traffic: 70 (year 2030),  Design Load: H 10,  Features Intersected: KNAKES CREEK,  Facility Carried by Structure: CO RD 429
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 3.5m (11.5ft),  Out-to-Out Width: 3.5m (11.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 4.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 2.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Other Special Inspection Date: July 2021,  Bridge Improvement Cost: $150,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $165,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 12343,  Location: .8 MI NE FOSTER BRIDGE (Lat: 33.418400,  Lng: -85.591100),  Route carried "on" structure: County highway ,  Year Built: 1980,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 100 (year 1997),  Average Future Daily Traffic: 125 (year 2030),  Design Load: HS 20,  Features Intersected: BUCKHANON CREEK,  Facility Carried by Structure: CO RD 7
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 57.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.26m (7.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $483,000,  Roadway Improvement Cost: $48,000,  Total Project Cost: $531,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 1256,  Location: 0.3MI N CODRAN (Lat: 33.469100,  Lng: -85.520700),  Route carried "on" structure: County highway 19,  Year Built: 1981,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 315 (year 1990),  Truck Traffic: 25%,  Average Future Daily Traffic: 441 (year 2030),  Design Load: H 10,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 5.9m (19.4ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $409,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $450,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14492,  Location: 1.4MI NE CENTER WESTCHURC (Lat: 33.451500,  Lng: -85.620300),  Route carried "on" structure: County highway ,  Year Built: 1989,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 30 (year 1991),  Average Future Daily Traffic: 42 (year 2030),  Design Load: HS 20,  Features Intersected: KETCHEPEDRAKE CREEK,  Facility Carried by Structure: CO RD 201
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.56m (18.24ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $992,000,  Roadway Improvement Cost: $99,000,  Total Project Cost: $1,091,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1617,  Location: 2 MI NW MORRISON X ROADS (Lat: 33.440600,  Lng: -85.509600),  Route carried "on" structure: County highway 19,  Year Built: 1994,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 250 (year 1997),  Truck Traffic: 25%,  Average Future Daily Traffic: 400 (year 2030),  Design Load: HS 20,  Features Intersected: PINEYWOOD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 70.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $382,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $420,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 16171,  Location: HWY 113(FULLER CULVERT) (Lat: 33.379700,  Lng: -85.618400),  Route carried "on" structure: Business County highway 82,  Year Built: 1994,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 150 (year 1997),  Truck Traffic: 25%,  Average Future Daily Traffic: 175 (year 2030),  Design Load: HS 20,  Features Intersected: FULLER CREEK,  Facility Carried by Structure: CO.RD. 113
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 26.8m (87.9ft),  Out-to-Out Width: 27.4m (89.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $232,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $255,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 16173,  Location: 1.4 MI E MORRISON X ROADS (Lat: 33.433000,  Lng: -85.473600),  Route carried "on" structure: County highway 82,  Year Built: 1993,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 300 (year 1993),  Truck Traffic: 10%,  Average Future Daily Traffic: 700 (year 2030),  Design Load: HS 20,  Features Intersected: WOLF CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 17.7m (58.1ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 73.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.48m (4.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $512,000,  Roadway Improvement Cost: $51,000,  Total Project Cost: $563,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 16175,  Location: 1.5 MI NW NEW HOPE CHURCH (Lat: 33.243200,  Lng: -85.643300),  Route carried "on" structure: ServiceCounty highway ,  Year Built: 1992,  Status: Open,  Structure Length: 4.63m (15.19ft),  Average Daily Traffic: 400 (year 1997),  Truck Traffic: 16%,  Average Future Daily Traffic: 250 (year 2030),  Design Load: HS 20,  Features Intersected: CROOKED CREEK,  Facility Carried by Structure: CO. RD. 857
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 212.4m (696.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 59.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.63m (18.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $26,863,000,  Roadway Improvement Cost: $2,686,000,  Total Project Cost: $29,549,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16207,  Location: 3 MI E CO. RD. 33 (Lat: 33.209400,  Lng: -85.475900),  Route carried "on" structure: ServiceCounty highway ,  Year Built: 1991,  Status: Posted for load,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 20 (year 1992),  Average Future Daily Traffic: 75 (year 2030),  Features Intersected: CORNHOUSE CREEK,  Facility Carried by Structure: CO. RD. 821
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.002,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 14.2m (46.6ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 3.7m (12.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 13.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 8.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.76m (12.34ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 3 months,  Inspection Date: December 2021,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $309,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $340,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Discuss Folsom, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.