Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Eldon, Iowa (IA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 14Number of bridges
  • 220ft / 67.3mTotal length
  • 2,229Total average daily traffic
  • 68Total average daily truck traffic
  • 2,229Total future (year 2038) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Eldon
  • No street view available for this location

New bridges in Eldon, IA - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 11920-1929
  • 11940-1949
  • 41950-1959
  • 31970-1979
  • 21990-1999
  • 22000-2009
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 9.1%Very good
  • 18.2%Good
  • 18.2%Satisfactory
  • 36.4%Fair
  • 18.2%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 9.1%Very good
  • 18.2%Good
  • 27.3%Satisfactory
  • 18.2%Fair
  • 9.1%Poor
  • 18.2%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 9.1%Very good
  • 18.2%Good
  • 18.2%Fair
  • 36.4%Poor
  • 18.2%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 14.3%Very good
  • 14.3%Good
  • 42.9%Satisfactory
  • 14.3%Fair
  • 14.3%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 66.7%Good
  • 33.3%Satisfactory
Find on map >>   Show street view

Structure Number: 4451,  Location: 071122600 (Lat: 40.919225,  Lng: -92.222164),  Route carried "on" structure: City street ,  Year Built: 1998,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 289 (year 1998),  Average Future Daily Traffic: 289 (year 2040),  Design Load: HS 20,  Features Intersected: DRAINAGE,  Facility Carried by Structure: WALNUT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.781,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $18,000,  Roadway Improvement Cost: $2,000
Find on map >>   Show street view

Structure Number: 135121,  Location: 070120204 (Lat: 40.897425,  Lng: -92.212631),  Route carried "on" structure: County highway ,  Year Built: 1979,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 140 (year 2018),  Average Future Daily Traffic: 140 (year 2038),  Design Load: H 20,  Features Intersected: SOAP CREEK,  Facility Carried by Structure: FM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.180,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 58.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2018,  Bridge Improvement Cost: $30,000,  Roadway Improvement Cost: $3,000
Find on map >>   Show street view

Structure Number: 13514,  Location: 070120504 (Lat: 40.893436,  Lng: -92.265094),  Route carried "on" structure: County highway ,  Year Built: 1954,  Status: Posted for load-capacity,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 100 (year 2018),  Average Future Daily Traffic: 100 (year 2040),  Features Intersected: SOAP CREEK,  Facility Carried by Structure: FM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.391,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.8m (78.1ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 33.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 24.30m (79.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $642,000,  Roadway Improvement Cost: $64,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 135161,  Location: 070120804 (Lat: 40.883078,  Lng: -92.265106),  Route carried "on" structure: County highway ,  Year Built: 2008,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 80 (year 2018),  Average Future Daily Traffic: 80 (year 2039),  Design Load: HL 93,  Features Intersected: SMALL STREAM,  Facility Carried by Structure: FM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.240,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 68.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.00m (26.25ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2019,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 135172,  Location: 070121203 (Lat: 40.879522,  Lng: -92.188408),  Route carried "on" structure: County highway ,  Year Built: 2003,  Status: Posted for load-capacity,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 60 (year 2018),  Average Future Daily Traffic: 60 (year 2040),  Features Intersected: TRIB DESMOINES RIVER,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.821,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 33.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 4.00m (13.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 13518,  Location: 070121304 (Lat: 40.868614,  Lng: -92.190311),  Route carried "on" structure: County highway ,  Year Built: 1948,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 150 (year 2018),  Average Future Daily Traffic: 150 (year 2040),  Design Load: H 15,  Features Intersected: VESSER CREEK,  Facility Carried by Structure: FM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.268,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.2m (63.0ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.8m (22.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 30.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 13.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 10.00m (32.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $264,000,  Roadway Improvement Cost: $26,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 329801,  Location: 070110603 (Lat: 40.897742,  Lng: -92.175089),  Route carried "on" structure: County highway ,  Year Built: 1972,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 25 (year 2018),  Average Future Daily Traffic: 25 (year 2040),  Design Load: H 20,  Features Intersected: CREEK,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.478,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Fair,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 5.00m (16.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $120,000,  Roadway Improvement Cost: $12,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 32982,  Location: 070110703 (Lat: 40.877747,  Lng: -92.173694),  Route carried "on" structure: County highway ,  Year Built: 1950,  Status: Posted for load,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 60 (year 2018),  Average Future Daily Traffic: 60 (year 2040),  Features Intersected: TRIB DES MOINES RIVER,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.452,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 33.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 26.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 6.20m (20.34ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $149,000,  Roadway Improvement Cost: $15,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 32983,  Location: 070110707 (Lat: 40.874253,  Lng: -92.172356),  Route carried "on" structure: County highway ,  Year Built: 1956,  Status: Posted for load,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 50 (year 2018),  Average Future Daily Traffic: 50 (year 2041),  Design Load: H 15,  Features Intersected: CREEK,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.576,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Poor,  Operating Rating: 31.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 18.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 12.50m (41.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $244,000,  Roadway Improvement Cost: $24,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 330181,  Location: 071121706 (Lat: 40.949636,  Lng: -92.260306),  Route carried "on" structure: County highway ,  Year Built: 1978,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 30 (year 2014),  Average Future Daily Traffic: 30 (year 2041),  Design Load: HS 20,  Features Intersected: CHIPPEWA CREEK,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.023,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.00m (16.40ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $108,000,  Roadway Improvement Cost: $11,000
Find on map >>   Show street view

Structure Number: 33022,  Location: 071122108 (Lat: 40.930389,  Lng: -92.238875),  Route carried "on" structure: County highway ,  Year Built: 1910,  Status: Posted for load,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 45 (year 2014),  Average Future Daily Traffic: 45 (year 2041),  Features Intersected: CHIPPEWA CREEK,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.315,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Serious,  Superstructure: Serious,  Substructure: Serious,  Channel: Fair,  Operating Rating: 18.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 13.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 8.50m (27.89ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $229,000,  Roadway Improvement Cost: $23,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 33026,  Location: 071122706 (Lat: 40.919264,  Lng: -92.231967),  Route carried "on" structure: County highway ,  Year Built: 1957,  Year Reconstructed: 2015,  Status: Posted for load,  Structure Length: 37.95m (124.51ft),  Average Daily Traffic: 860 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 860 (year 2040),  Design Load: H 15,  Features Intersected: DES MOINES RIVER,  Facility Carried by Structure: FM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.107,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 15,  Length of Maximum Span: 40.2m (131.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 19.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 11.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 125.00m (410.10ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Other Special Inspection Frequency: Every 60 months,  Inspection Date: June 2020,  Underwater Inspection Date: November 2017,  Other Special Inspection Date: July 2020,  Bridge Improvement Cost: $3,375,000,  Roadway Improvement Cost: $338,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 33028,  Location: 071122803 (Lat: 40.927372,  Lng: -92.240856),  Route carried "on" structure: County highway ,  Year Built: 1925,  Status: Posted for load,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 200 (year 2014),  Average Future Daily Traffic: 200 (year 2041),  Features Intersected: CHIPPEWA CREEK,  Facility Carried by Structure: LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.746,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Serious,  Superstructure: Serious,  Substructure: Serious,  Channel: Poor,  Operating Rating: 18.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 13.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 10.00m (32.81ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $228,000,  Roadway Improvement Cost: $23,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 330311,  Location: 071123504 (Lat: 40.899644,  Lng: -92.213547),  Route carried "on" structure: County highway ,  Year Built: 1994,  Status: Open,  Structure Length: 6.13m (20.11ft),  Average Daily Traffic: 140 (year 2018),  Average Future Daily Traffic: 140 (year 2039),  Design Load: HS 20,  Features Intersected: SOAP CREEK,  Facility Carried by Structure: FM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.011,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 78.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 20.10m (65.94ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2019,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $2,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Discuss Eldon, Iowa (IA) on our hugely popular Iowa forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.