Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Comer, Georgia (GA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 11Number of bridges
  • 125ft / 38.2mTotal length
  • $43,205,000Total costs
  • 19,240Total average daily traffic
  • 1,809Total average daily truck traffic
  • 29,710Total future (year 2030) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Comer
  • No street view available for this location

New bridges in Comer, GA - historical statistics
  • New bridges - historical statistics
  • 11960-1969
  • 21980-1989
  • 21990-1999
  • 42000-2009
  • 22010-2019
Average Bridge Daily Traffic in Comer, GA
Average Bridge Truck Traffic in Comer, GA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 60.0%Very good
  • 40.0%Good
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 80.0%Very good
  • 20.0%Good
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 20.0%Very good
  • 80.0%Good
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 45.5%Very good
  • 18.2%Good
  • 18.2%Satisfactory
  • 18.2%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 83.3%Good
  • 16.7%Fair
Find on map >>   Show street view

Structure Number: 1955023,  Location: 1.5 MI SW OF COMER (Lat: 34.052969,  Lng: -83.147458),  Route carried "on" structure: County highway 274,  Year Built: 1992,  Status: Open,  Structure Length: 4.27m (14.01ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SOUTH FORK BROAD RIVER,  Facility Carried by Structure: ARNOLD BOTTOMS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: March 2021,  Underwater Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1955026,  Location: 2 MI NE OF COMER (Lat: 34.089700,  Lng: -83.107289),  Route carried "on" structure: County highway 301,  Year Built: 1992,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: ROCKY SHOAL CREEK,  Facility Carried by Structure: COMER PAOLI ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021
Find on map >>   Show street view

Structure Number: 195503,  Location: 3 MI NW OF COMER (Lat: 34.075519,  Lng: -83.177147),  Route carried "on" structure: County highway 326,  Year Built: 1986,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 5%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: GUNNELL'S BRANCH,  Facility Carried by Structure: FRED GOSS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021
Find on map >>   Show street view

Structure Number: 1955031,  Location: 3.5 MI N OF COMER (Lat: 34.104700,  Lng: -83.089189),  Route carried "on" structure: County highway 334,  Year Built: 1961,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: H 15,  Features Intersected: HOLLY CREEK,  Facility Carried by Structure: VINEYARD CK CH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021
Find on map >>   Show street view

Structure Number: 1955048,  Location: 3.5 MI N OF COMER (Lat: 34.109458,  Lng: -83.102458),  Route carried "on" structure: County highway 329,  Year Built: 1982,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 160 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 240 (year 2032),  Design Load: H 15,  Features Intersected: HOLLY CREEK,  Facility Carried by Structure: BARWICK-HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021
Find on map >>   Show street view

Structure Number: 195506,  Location: 2.5MI W OF COMER (Lat: 34.065500,  Lng: -83.168569),  Route carried "on" structure: State highway 172,  Year Built: 2005,  Status: Open,  Structure Length: 5.85m (19.19ft),  Average Daily Traffic: 3,150 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,725 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SOUTH FORK BROAD RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 33.5m (109.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1955061,  Location: 2.1 MI NE OF COMER (Lat: 34.081400,  Lng: -83.097867),  Route carried "on" structure: County highway 277,  Year Built: 2008,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 170 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 255 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: ROCKY SHOAL CREEK,  Facility Carried by Structure: NEW HOPE CHURCH RO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021
Find on map >>   Show street view

Structure Number: 1955064,  Location: 1.5 MI W OF COMER (Lat: 34.061558,  Lng: -83.155808),  Route carried "on" structure: State highway 72,  Year Built: 2016,  Status: Open,  Structure Length: 8.38m (27.49ft),  Average Daily Traffic: 6,110 (year 2012),  Truck Traffic: 10%,  Average Future Daily Traffic: 12,400 (year 2030),  Design Load: HS 20+Mod,  Features Intersected: SOUTH FORK BROAD RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.484,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 26.8m (87.9ft),  Skew: 13 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 38.1m (125.0ft),  Curb-To-Curb Width: 26.8m (87.9ft),  Out-to-Out Width: 27.7m (90.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.06m (33.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $24,420,000,  Roadway Improvement Cost: $2,442,000,  Total Project Cost: $36,630,000 ( Estimate for 2017),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1955066,  Location: 2 MI E OF COMER (Lat: 34.068817,  Lng: -83.086897),  Route carried "on" structure: State highway 72,  Year Built: 2017,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 4,690 (year 2012),  Truck Traffic: 10%,  Average Future Daily Traffic: 4,650 (year 2035),  Design Load: HS 20+Mod,  Features Intersected: ROCK SHOALS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.921,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Skew: 11 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Very good,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.04m (3.41ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: March 2021,  Underwater Inspection Date: October 2021,  Bridge Improvement Cost: $2,516,000,  Roadway Improvement Cost: $252,000,  Total Project Cost: $3,744,000 ( Estimate for 2019)
Find on map >>   Show street view

Structure Number: 2215034,  Location: 8.7 MI N OF LEXINGTON (Lat: 33.997547,  Lng: -83.109447),  Route carried "on" structure: State highway 22,  Year Built: 2004,  Status: Open,  Structure Length: 6.34m (20.80ft),  Average Daily Traffic: 1,500 (year 2011),  Truck Traffic: 22%,  Average Future Daily Traffic: 2,250 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: BIG CLOUDS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.624,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 39.0m (128.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 62.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $813,000,  Roadway Improvement Cost: $81,000,  Total Project Cost: $1,219,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2215037,  Location: 12.1 MI N OF LEXINGTON (Lat: 34.046078,  Lng: -83.127250),  Route carried "on" structure: State highway 22,  Year Built: 2007,  Status: Open,  Structure Length: 8.38m (27.49ft),  Average Daily Traffic: 1,500 (year 2011),  Truck Traffic: 22%,  Average Future Daily Traffic: 2,250 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: SOUTH FORK BROAD RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 45.062,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 38.1m (125.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 59.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,074,000,  Roadway Improvement Cost: $107,000,  Total Project Cost: $1,612,000,  Deck Structure Type: Concrete Cast-file-Place
Discuss Comer, Georgia (GA) on our hugely popular Georgia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.