  • National Bridge Inventory (NBI) Statistics
  • 26Number of bridges
  • 397ft / 121mTotal length
  • $48,399,000Total costs
  • 42,159Total average daily traffic
  • 9,970Total average daily truck traffic
  • 57,263Total future (year 2033) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Clio
  • No street view available for this location

New bridges in Clio, AL - historical statistics
  • New bridges - historical statistics
  • 31950-1959
  • 51960-1969
  • 21970-1979
  • 131980-1989
  • 21990-1999
  • 12000-2009
Average Bridge Daily Traffic in Clio, AL
Average Bridge Truck Traffic in Clio, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 16.7%Very good
  • 75.0%Good
  • 8.3%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 25.0%Very good
  • 75.0%Good
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 25.0%Very good
  • 66.7%Good
  • 8.3%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 12.5%Very good
  • 54.2%Good
  • 29.2%Satisfactory
  • 4.2%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 14.3%Very good
  • 71.4%Good
  • 7.1%Satisfactory
  • 7.1%Fair
Find on map >>   Show street view

Structure Number: 3407,  Location: 1.9 MI S OF AL 130 (Lat: 31.751183,  Lng: -85.623014),  Route carried "on" structure: County highway 9,  Year Built: 1955,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 160 (year 2017),  Truck Traffic: 16%,  Average Future Daily Traffic: 200 (year 2037),  Design Load: H 15,  Features Intersected: BIG SAND CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 41.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $390,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $429,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5446,  Location: 1.0 MI S OF AL 10 (Lat: 31.692319,  Lng: -85.671078),  Route carried "on" structure: County highway 3,  Year Built: 1956,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 200 (year 2016),  Truck Traffic: 16%,  Average Future Daily Traffic: 225 (year 2036),  Design Load: HS 15,  Features Intersected: LITTLE CREEK,  Facility Carried by Structure: RIVER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.66m (5.45ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $297,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $327,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6913,  Location: 1.0 MI N OF AL-10 (Lat: 31.725256,  Lng: -85.654847),  Route carried "on" structure: County highway 3,  Year Built: 1960,  Status: Posted for load,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 105 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 125 (year 2038),  Design Load: H 15,  Features Intersected: BIG CREEK,  Facility Carried by Structure: SHELLEY JACKSON SP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 38.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 5.11m (16.77ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2022,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $806,000,  Roadway Improvement Cost: $81,000,  Total Project Cost: $887,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6955,  Location: 0.4 MI W OF COUNTY 21 (Lat: 31.718017,  Lng: -85.551372),  Route carried "on" structure: County highway 14,  Year Built: 1960,  Status: Open,  Structure Length: 1.32m (4.33ft),  Average Daily Traffic: 145 (year 2017),  Truck Traffic: 16%,  Average Future Daily Traffic: 160 (year 2037),  Design Load: HS 15,  Features Intersected: SIKES CREEK,  Facility Carried by Structure: BAXTER STATION RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 51.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.99m (6.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $459,000,  Roadway Improvement Cost: $46,000,  Total Project Cost: $505,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6977,  Location: 1.1 MI E OF AL 51 (Lat: 31.726625,  Lng: -85.586953),  Route carried "on" structure: County highway 22,  Year Built: 1960,  Status: Open,  Structure Length: 1.30m (4.27ft),  Average Daily Traffic: 155 (year 2017),  Truck Traffic: 16%,  Average Future Daily Traffic: 170 (year 2037),  Design Load: HS 15,  Features Intersected: CAMPBELL CREEK,  Facility Carried by Structure: JW MCLEAN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 48.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.97m (6.46ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $454,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $499,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6981,  Location: 1.4 MI NE OF AL 10 (Lat: 31.713619,  Lng: -85.566136),  Route carried "on" structure: County highway 23,  Year Built: 1960,  Status: Open,  Structure Length: 0.66m (2.17ft),  Average Daily Traffic: 165 (year 2017),  Truck Traffic: 16%,  Average Future Daily Traffic: 180 (year 2037),  Design Load: HS 15,  Features Intersected: WILDCAT BRANCH,  Facility Carried by Structure: SCONYERS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $280,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $308,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6982,  Location: 1.1 MI NE OF AL 10 (Lat: 31.712236,  Lng: -85.569708),  Route carried "on" structure: County highway 23,  Year Built: 1960,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 155 (year 2017),  Truck Traffic: 16%,  Average Future Daily Traffic: 170 (year 2037),  Design Load: HS 15,  Features Intersected: CAMPBELL CREEK,  Facility Carried by Structure: SCONYERS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 47.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.24m (7.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $491,000,  Roadway Improvement Cost: $49,000,  Total Project Cost: $540,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 10932,  Location: 2.0 MI SE OF CO 15 (Lat: 31.664697,  Lng: -85.588994),  Route carried "on" structure: County highway 7,  Year Built: 1973,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 60 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 80 (year 2037),  Design Load: HS 15,  Features Intersected: LITTLE JUDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 78.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $359,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $395,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 10934,  Location: .7 MI WEST OF CO 23 (Lat: 31.661564,  Lng: -85.585672),  Route carried "on" structure: County highway 8,  Year Built: 1973,  Status: Open,  Structure Length: 1.64m (5.38ft),  Average Daily Traffic: 150 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 200 (year 2037),  Design Load: HS 15,  Features Intersected: LITTLE JUDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 43.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.32m (7.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $564,000,  Roadway Improvement Cost: $56,000,  Total Project Cost: $620,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 12561,  Location: 0.7 MI NW OF COUNTY 33 (Lat: 31.710583,  Lng: -85.538417),  Route carried "on" structure: County highway ,  Year Built: 1981,  Status: Posted for load,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 200 (year 2017),  Truck Traffic: 16%,  Average Future Daily Traffic: 210 (year 2037),  Design Load: HS 15,  Features Intersected: CARPENTERS MILL CREEK,  Facility Carried by Structure: CARPENTER MILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 39.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 3.15m (10.33ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $583,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $641,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 1325,  Location: .2 MI.E.PIKE LINE (Lat: 31.714689,  Lng: -85.703497),  Route carried "on" structure: State highway 10,  Year Built: 1984,  Status: Open,  Structure Length: 7.50m (24.61ft),  Average Daily Traffic: 1,760 (year 2013),  Truck Traffic: 20%,  Average Future Daily Traffic: 2,292 (year 2033),  Design Load: HS 20,  Features Intersected: PEA RIVER RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 301.657,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.52m (27.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $2,454,000,  Roadway Improvement Cost: $245,000,  Total Project Cost: $2,699,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13903,  Location: .8 MI.E.BARBOUR #3 (Lat: 31.709717,  Lng: -85.660867),  Route carried "on" structure: State highway 10,  Year Built: 1986,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 2,151 (year 2013),  Truck Traffic: 20%,  Average Future Daily Traffic: 2,802 (year 2033),  Design Load: HS 20,  Features Intersected: THOMPSON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 306.015,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 68.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $835,000,  Roadway Improvement Cost: $84,000,  Total Project Cost: $919,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 14193,  Location: .6 MI.E.BARBOUR #5 (Lat: 31.711317,  Lng: -85.686617),  Route carried "on" structure: State highway 10,  Year Built: 1987,  Status: Open,  Structure Length: 6.25m (20.51ft),  Average Daily Traffic: 1,760 (year 2013),  Truck Traffic: 20%,  Average Future Daily Traffic: 2,292 (year 2033),  Design Load: HS 20,  Features Intersected: BIG CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 303.435,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.29m (23.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $2,099,000,  Roadway Improvement Cost: $210,000,  Total Project Cost: $2,309,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14362,  Location: 600' S PINEHILL DRIVE (Lat: 30.999278,  Lng: -87.479650),  Route carried "on" structure: City street ,  Year Built: 1988,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 526 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 789 (year 2039),  Design Load: HS 20,  Features Intersected: PINE BARREN WATER SHED,  Facility Carried by Structure: MEDICAL PARK DR.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.119,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.2m (20.3ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 63.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $334,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $367,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 14363,  Location: 1.1 MI W JCT AL-19 (Lat: 34.180278,  Lng: -88.081083),  Route carried "on" structure: Interstate 22,  Year Built: 1958,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 2.41m (7.91ft),  Average Daily Traffic: 11,620 (year 2013),  Truck Traffic: 33%,  Average Future Daily Traffic: 15,743 (year 2040),  Design Load: HS 20,  Features Intersected: Broadtree Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.514,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.0m (78.7ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 4.6m (15.1ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.27m (10.73ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $3,513,000,  Roadway Improvement Cost: $351,000,  Total Project Cost: $3,864,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 14364,  Location: 2.0 MI NE OF JCT US NO 11 (Lat: 33.255300,  Lng: -87.160736),  Route carried "on" structure: County highway 420,  Year Built: 1988,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 700 (year 2019),  Average Future Daily Traffic: 770 (year 2039),  Design Load: HS 20,  Features Intersected: DAVIS CREEK,  Facility Carried by Structure: WOODLAND LAKE RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 77.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $281,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $309,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14382,  Location: 0.8 MI.S.AL.154 (Lat: 31.796667,  Lng: -87.946667),  Route carried "on" structure: County highway ,  Year Built: 1988,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 100 (year 1995),  Average Future Daily Traffic: 110 (year 2041),  Design Load: HS 20,  Features Intersected: WELLS CREEK RELIEF,  Facility Carried by Structure: WEBB ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 1.3m (4.3ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 35.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $195,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $215,000 ( Estimate for 2022),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 14622,  Location: LEEMAN FERRY AT DRAKE AVE (Lat: 34.705228,  Lng: -86.591639),  Route carried "on" structure: City street ,  Year Built: 1988,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 7,400 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 10,360 (year 2039),  Design Load: H 20,  Features Intersected: Drainage Culvert,  Facility Carried by Structure: LEEMAN FERRY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Culverts: Good,  Operating Rating: 44.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $3,650,000,  Roadway Improvement Cost: $365,000,  Total Project Cost: $4,015,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 14623,  Location: 0.4 MI E JCT I65 * SR 91 (Lat: 33.948153,  Lng: -86.860014),  Route carried "on" structure: State highway 91,  Year Built: 1988,  Status: Open,  Structure Length: 3.78m (12.40ft),  Average Daily Traffic: 1,467 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,054 (year 2040),  Design Load: HS 20,  Features Intersected: MARIOT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.309,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 40.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.71m (15.45ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,422,000,  Roadway Improvement Cost: $142,000,  Total Project Cost: $1,564,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14627,  Location: 0.8 MI S AL 76 (Lat: 33.284647,  Lng: -86.301147),  Route carried "on" structure: County highway 103,  Year Built: 1988,  Status: Open,  Structure Length: 5.97m (19.59ft),  Average Daily Traffic: 710 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 955 (year 2038),  Design Load: HS 20,  Features Intersected: TALLASEEHATCHEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 4,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 58.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 7.01m (23.00ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: October 2021,  Underwater Inspection Date: May 2020,  Bridge Improvement Cost: $1,250,000,  Roadway Improvement Cost: $125,000,  Total Project Cost: $1,375,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14642,  Location: 1.2 MI S AL-19 (Lat: 34.130833,  Lng: -88.058278),  Route carried "on" structure: County highway 4,  Year Built: 1988,  Status: Open,  Structure Length: 9.85m (32.32ft),  Average Daily Traffic: 350 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 960 (year 2040),  Design Load: HS 20,  Features Intersected: I-22,  Facility Carried by Structure: CR-11
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.338,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 6.2m (20.3ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 30.2m (99.1ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 47.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.79m (35.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,293,000,  Roadway Improvement Cost: $229,000,  Total Project Cost: $2,522,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14644,  Location: 2.8 MI W AL-171 (Lat: 34.095472,  Lng: -88.013972),  Route carried "on" structure: Interstate 22,  Year Built: 1988,  Status: Open,  Structure Length: 27.40m (89.90ft),  Average Daily Traffic: 5,665 (year 2018),  Truck Traffic: 38%,  Average Future Daily Traffic: 7,675 (year 2040),  Design Load: HS 20,  Features Intersected: Buttahatchee River
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.561,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Number Of Approach Spans: 9,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.7m (54.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 41.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 27.40m (89.90ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Underwater Inspection Date: April 2020,  Bridge Improvement Cost: $10,146,000,  Roadway Improvement Cost: $1,015,000,  Total Project Cost: $11,161,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14645,  Location: 2.8 MI W OF AL-171 (Lat: 34.095778,  Lng: -88.013972),  Route carried "on" structure: Interstate 22,  Year Built: 1988,  Status: Open,  Structure Length: 26.43m (86.71ft),  Average Daily Traffic: 5,665 (year 2018),  Truck Traffic: 38%,  Average Future Daily Traffic: 7,675 (year 2040),  Design Load: HS 20,  Features Intersected: Buttahatchee River
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.561,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.5m (37.7ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Number Of Approach Spans: 5,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 49.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 26.43m (86.71ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Underwater Inspection Date: April 2020,  Bridge Improvement Cost: $7,793,000,  Roadway Improvement Cost: $779,000,  Total Project Cost: $8,572,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15062,  Location: 0.9 MI NE OF AL 10 (Lat: 31.725967,  Lng: -85.632836),  Route carried "on" structure: County highway 1055,  Year Built: 1990,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 30 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 40 (year 2037),  Design Load: HS 20,  Features Intersected: U.T. SAND CREEK,  Facility Carried by Structure: ALEX SHIPMAN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 68.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.89m (6.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $437,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $481,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 15561,  Location: 0.9 MI. N. SR. 10 (Lat: 31.696133,  Lng: -85.540950),  Route carried "on" structure: State highway 131,  Year Built: 1992,  Status: Open,  Structure Length: 6.25m (20.51ft),  Average Daily Traffic: 720 (year 2013),  Truck Traffic: 16%,  Average Future Daily Traffic: 966 (year 2033),  Design Load: HS 20,  Features Intersected: SIKES CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.447,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 10.3m (33.8ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 60.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.29m (23.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,799,000,  Roadway Improvement Cost: $180,000,  Total Project Cost: $1,979,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 18401,  Location: 0.8 MI EAST CO RD 13 (Lat: 31.637036,  Lng: -85.628756),  Route carried "on" structure: County highway 1015,  Year Built: 2003,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 40 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 60 (year 2037),  Design Load: HS 20,  Features Intersected: JUDY CREEK,  Facility Carried by Structure: DEWEY IVEY ROAD
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 70.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $815,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $897,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels