Bridge Statistics for Cleveland, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 16Number of bridges
  • 269ft / 81.8mTotal length
  • $22,293,000Total costs
  • 33,941Total average daily traffic
  • 1,587Total average daily truck traffic
  • 45,399Total future (year 2028) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Cleveland
  • No street view available for this location

New bridges in Cleveland, AL - historical statistics
  • New bridges - historical statistics
  • 31930-1939
  • 11940-1949
  • 31950-1959
  • 31960-1969
  • 31970-1979
  • 11980-1989
  • 22000-2009
Average Bridge Daily Traffic in Cleveland, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 16.7%Very good
  • 25.0%Good
  • 41.7%Satisfactory
  • 16.7%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 8.3%Very good
  • 25.0%Good
  • 41.7%Satisfactory
  • 25.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 8.3%Very good
  • 16.7%Good
  • 33.3%Satisfactory
  • 25.0%Fair
  • 16.7%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 7.1%Very good
  • 14.3%Good
  • 35.7%Satisfactory
  • 42.9%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 25.0%Good
  • 25.0%Satisfactory
  • 50.0%Fair
Find on map >>   Show street view

Structure Number: 1644,  Location: 1 MI W OF CLEVELAND (Lat: 33.997456,  Lng: -86.601406),  Route carried "on" structure: County highway 123,  Year Built: 1937,  Status: Closed,  Structure Length: 9.30m (30.51ft),  Average Daily Traffic: 324 (year 2019),  Average Future Daily Traffic: 437 (year 2039),  Features Intersected: LOCUST FORK RIVER,  Facility Carried by Structure: SWANN BRIDGE ROAD
Minimum Vertical Clearance: 3.96m (12.99ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.0m (16.4ft),  Material/Design: Wood or Timber,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: High priority of replacement,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 10.25m (33.63ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2020,  Critical Feature Inspection Date: March 2021,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $1,406,000,  Roadway Improvement Cost: $141,000,  Total Project Cost: $1,547,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 202,  Location: 1.6 MI SO ST RT AL 160 (Lat: 33.991667,  Lng: -86.548333),  Route carried "on" structure: US 231,  Year Built: 1939,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 6,460 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 8,397 (year 2041),  Features Intersected: ANDY BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 418.487,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $353,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $388,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2022,  Location: US 231 * DRY BRANCH (Lat: 33.990833,  Lng: -86.566111),  Route carried "on" structure: US 231,  Year Built: 1939,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 6,460 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 8,397 (year 2041),  Design Load: H 15,  Features Intersected: DRY BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 420.139,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 49.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.54m (8.33ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $419,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $461,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3337,  Location: 1/2 MI W OF CLEVELAND (Lat: 33.995539,  Lng: -86.600739),  Route carried "on" structure: County highway 123,  Year Built: 1948,  Status: Posted for load,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 324 (year 2020),  Average Future Daily Traffic: 481 (year 2040),  Features Intersected: UNK CREEK TO LOCUST FORK,  Facility Carried by Structure: SWANN BRIDGE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 2.8m (9.2ft),  Out-to-Out Width: 4.5m (14.8ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Poor,  Channel: Fair,  Operating Rating: 5.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 3.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2020,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $121,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $133,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 4659,  Location: .9 MI. SO. AL 160 (Lat: 33.971111,  Lng: -86.588889),  Route carried "on" structure: State highway 79,  Year Built: 1953,  Status: Open,  Structure Length: 6.83m (22.41ft),  Average Daily Traffic: 4,480 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 5,402 (year 2041),  Design Load: H 15,  Features Intersected: DRY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 53.932,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Load Testing,  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Testing,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.87m (25.82ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,510,000,  Roadway Improvement Cost: $151,000,  Total Project Cost: $1,661,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 672,  Location: 3 1/2 MI SW OF ROSA (Lat: 33.952736,  Lng: -86.545928),  Route carried "on" structure: County highway 33,  Year Built: 1959,  Status: Posted for load,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 598 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 888 (year 2040),  Design Load: H 15,  Features Intersected: CHITWOOD CREEK AT EASLEY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2020,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $788,000,  Roadway Improvement Cost: $79,000,  Total Project Cost: $867,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6722,  Location: EASLEY (Lat: 33.956544,  Lng: -86.543272),  Route carried "on" structure: County highway 33,  Year Built: 1959,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 609 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 906 (year 2040),  Design Load: H 15,  Features Intersected: CHITWOOD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 76.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $428,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $471,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 7498,  Location: 1/2 MI E OF FIVE POINTS (Lat: 34.018533,  Lng: -86.543700),  Route carried "on" structure: County highway 187,  Year Built: 1961,  Status: Posted for load,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 146 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 216 (year 2040),  Features Intersected: DRY CREEK,  Facility Carried by Structure: DRY CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 4.1m (13.5ft),  Out-to-Out Width: 4.1m (13.5ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 18.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 10.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2020,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $177,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $195,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8206,  Location: 2.37 MI.N. AL.49 (Lat: 32.448278,  Lng: -85.752275),  Route carried "on" structure: County highway 36,  Year Built: 1964,  Status: Open,  Structure Length: 9.45m (31.00ft),  Average Daily Traffic: 581 (year 2003),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,036 (year 2028),  Design Load: HS 20,  Features Intersected: I85
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.175,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 49.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.40m (34.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,997,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $2,197,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1086,  Location: 7.2 MI E JCT AL 46 (Lat: 33.663597,  Lng: -85.383728),  Route carried "on" structure: County highway 20,  Year Built: 1973,  Status: Open,  Structure Length: 9.91m (32.51ft),  Average Daily Traffic: 212 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 297 (year 2040),  Design Load: HS 20,  Features Intersected: I-20,  Facility Carried by Structure: CO RD 66
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 212.400,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 7.7m (25.3ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 29.0m (95.1ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 64.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 10.84m (35.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $2,156,000,  Roadway Improvement Cost: $216,000,  Total Project Cost: $2,372,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11505,  Location: 1 MI W OF EASLEY (Lat: 33.954761,  Lng: -86.558003),  Route carried "on" structure: County highway 1,  Year Built: 1975,  Status: Open,  Structure Length: 12.37m (40.58ft),  Average Daily Traffic: 2,984 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 4,434 (year 2041),  Design Load: H 20,  Features Intersected: CALVERT PRONG
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 6,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 41.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.21m (43.34ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,446,000,  Roadway Improvement Cost: $245,000,  Total Project Cost: $2,691,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11506,  Location: 1 MI S OF CLEVELAND (Lat: 33.975856,  Lng: -86.574992),  Route carried "on" structure: County highway 1,  Year Built: 1975,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 2,926 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 4,348 (year 2040),  Design Load: H 20,  Features Intersected: DRY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 6.1m (20.0ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.90m (12.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,260,000,  Roadway Improvement Cost: $126,000,  Total Project Cost: $1,386,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 18188,  Location: 2.7 MI. NO. AL 160 (Lat: 34.023194,  Lng: -86.574186),  Route carried "on" structure: US 231,  Year Built: 2007,  Status: Open,  Structure Length: 16.46m (54.00ft),  Average Daily Traffic: 6,730 (year 2021),  Truck Traffic: 12%,  Average Future Daily Traffic: 8,748 (year 2041),  Design Load: HS 20,  Features Intersected: LOCUST FK OF WARRIOR RIV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 424.711,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 41.1m (134.8ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 67.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 17.20m (56.43ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $5,425,000,  Roadway Improvement Cost: $543,000,  Total Project Cost: $5,968,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19263,  Location: SOUTHERN PINES SUBDIVISIO (Lat: 33.405942,  Lng: -86.686294),  Route carried "on" structure: County highway ,  Year Built: 1985,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 700 (year 2022),  Truck Traffic: 1%,  Average Future Daily Traffic: 980 (year 2042),  Design Load: HS 20,  Features Intersected: DRAINAGE DITCH FROM LAKE,  Facility Carried by Structure: TALL TIMBER DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.9 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.25m (4.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $435,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $479,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 19409,  Location: 6.0 MILES SO HWY80W (Lat: 32.319119,  Lng: -85.919544),  Route carried "on" structure: County highway 9,  Year Built: 2005,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 251 (year 2015),  Truck Traffic: 5%,  Average Future Daily Traffic: 200 (year 2035),  Design Load: HS 20,  Features Intersected: OLD TOWN CREEK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.8m (22.3ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 58.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.89m (19.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,211,000,  Roadway Improvement Cost: $121,000,  Total Project Cost: $1,332,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 20723,  Location: 1/2 MI NE OF FIVE PTS (Lat: 34.019747,  Lng: -86.540908),  Route carried "on" structure: County highway 188,  Year Built: 1961,  Year Reconstructed: 2013,  Status: Posted for load,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 156 (year 2021),  Average Future Daily Traffic: 232 (year 2041),  Design Load: HS 20,  Features Intersected: DRY CREEK,  Facility Carried by Structure: MTN GAP ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Poor,  Channel: Fair,  Operating Rating: 35.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $132,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $145,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place