Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Cardington, Ohio (OH)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 25Number of bridges
  • 194ft / 59.3mTotal length
  • $3,018,000,000Total costs
  • 24,489Total average daily traffic
  • 1,362Total average daily truck traffic
  • 34,111Total future (year 2025) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Cardington
  • No street view available for this location

New bridges in Cardington, OH - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 21920-1929
  • 41950-1959
  • 31960-1969
  • 21970-1979
  • 11980-1989
  • 31990-1999
  • 12000-2009
  • 82010-2019
Reconstructed bridges in Cardington, OH - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 01980-1989
  • 21990-1999
  • 32000-2009
  • 12010-2019
  • 12020-2022
Average Bridge Daily Traffic in Cardington, OH
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 38.1%Excellent
  • 28.6%Very good
  • 19.0%Good
  • 4.8%Satisfactory
  • 4.8%Fair
  • 4.8%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 36.4%Excellent
  • 31.8%Very good
  • 4.5%Good
  • 9.1%Satisfactory
  • 9.1%Fair
  • 9.1%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 31.8%Excellent
  • 22.7%Very good
  • 9.1%Good
  • 18.2%Satisfactory
  • 9.1%Fair
  • 4.5%Poor
  • 4.5%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 8.0%Very good
  • 32.0%Good
  • 32.0%Satisfactory
  • 20.0%Fair
  • 8.0%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Very good
  • 33.3%Satisfactory
  • 33.3%Poor
Find on map >>   Show street view

Structure Number: 590053,  Location: 0.3 MI N OF SR529 (Lat: 40.500581,  Lng: -82.888581),  Route carried "on" structure: US 42,  Year Built: 1986,  Status: Open,  Structure Length: 3.12m (10.24ft),  Average Daily Traffic: 4,574 (year 2015),  Truck Traffic: 4%,  Average Future Daily Traffic: 6,349 (year 2035),  Design Load: HS 20+Mod,  Features Intersected: WHETSTONE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.408,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.0m (49.2ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 35.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5900581,  Location: 1 MI.N OF CARDINGTON (Lat: 40.517600,  Lng: -82.872119),  Route carried "on" structure: US 42,  Year Built: 2000,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 4,574 (year 2015),  Truck Traffic: 4%,  Average Future Daily Traffic: 6,349 (year 2035),  Design Load: HS 20+Mod,  Features Intersected: WHESTONE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.903,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 5903483,  Location: 1.50 MI E OF MARION CO. (Lat: 40.516500,  Lng: -82.931300),  Route carried "on" structure: State highway 529,  Year Built: 1957,  Status: Open,  Structure Length: 3.02m (9.91ft),  Average Daily Traffic: 2,540 (year 2015),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,526 (year 2035),  Design Load: H 10,  Features Intersected: SHAW CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.430,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.4m (37.4ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 38.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 5903513,  Location: 2.44 MI E OF MARION CO (Lat: 40.510939,  Lng: -82.915450),  Route carried "on" structure: State highway 529,  Year Built: 1957,  Status: Open,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 2,540 (year 2015),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,526 (year 2035),  Design Load: H 10,  Features Intersected: BIG RUN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.959,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 19.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 5903548,  Location: 0.76 MI W OF US42 (Lat: 40.506211,  Lng: -82.903150),  Route carried "on" structure: State highway 529,  Year Built: 1957,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 2,540 (year 2015),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,526 (year 2035),  Design Load: H 15,  Features Intersected: HARDSGRABBLE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.134,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: May 2021
Find on map >>   Show street view

Structure Number: 5903572,  Location: 0.07 MI W OF US42 (Lat: 40.501500,  Lng: -82.894539),  Route carried "on" structure: State highway 529,  Year Built: 1952,  Year Reconstructed: 1984,  Status: Open,  Structure Length: 3.72m (12.20ft),  Average Daily Traffic: 2,312 (year 2015),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,209 (year 2035),  Design Load: HS 20+Mod,  Features Intersected: WHETSTONE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.260,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.7m (44.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 35.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 5930008,  Location: .10 MI. E. OF INT. TR134 (Lat: 40.491511,  Lng: -82.950019),  Route carried "on" structure: County highway C0011,  Year Built: 2015,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 199 (year 2015),  Truck Traffic: 8%,  Average Future Daily Traffic: 276 (year 2035),  Design Load: HL 93,  Features Intersected: SHAW CREEK,  Facility Carried by Structure: CR 11
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.014,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 51.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.77m (5.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $350,000,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5930333,  Location: 0.05 MI. N. OF CR 137 (Lat: 40.528611,  Lng: -82.919439),  Route carried "on" structure: County highway C0028,  Year Built: 2015,  Status: Open,  Structure Length: 2.53m (8.30ft),  Average Daily Traffic: 410 (year 2015),  Truck Traffic: 8%,  Average Future Daily Traffic: 569 (year 2035),  Design Load: HL 93,  Features Intersected: SHAW CREEK,  Facility Carried by Structure: CR 28
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.738,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 51.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.53m (8.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $500,000,000,  Total Project Cost: $500,000,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5930368,  Location: 0.7 MILE E. OF CR 149 (Lat: 40.475061,  Lng: -82.944169),  Route carried "on" structure: County highway T0152,  Year Built: 2016,  Status: Open,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 57 (year 2015),  Truck Traffic: 9%,  Average Future Daily Traffic: 79 (year 2035),  Design Load: HL 93,  Features Intersected: WHETSTONE CREEK,  Facility Carried by Structure: TR 152
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.515,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.4m (37.4ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Satisfactory,  Operating Rating: 55.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 42.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.38m (11.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $500,000,000,  Total Project Cost: $500,000,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5930448,  Location: .10 MI.N.OF INT.OF TR136 (Lat: 40.544331,  Lng: -82.919400),  Route carried "on" structure: County highway C0028,  Year Built: 1910,  Year Reconstructed: 2000,  Status: Posted for load,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 350 (year 2015),  Truck Traffic: 7%,  Average Future Daily Traffic: 486 (year 2035),  Features Intersected: SHAW CREEK,  Facility Carried by Structure: CR28
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.526,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 4.7m (15.4ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Poor,  Superstructure: Serious,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 3.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Critical Feature Inspection Date: December 2019,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 5931053,  Location: .60 MILES N.OF INT. TR133 (Lat: 40.541669,  Lng: -82.900000),  Route carried "on" structure: County highway C0130,  Year Built: 1976,  Year Reconstructed: 2020,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 153 (year 2015),  Truck Traffic: 8%,  Average Future Daily Traffic: 212 (year 2035),  Design Load: HL 93,  Features Intersected: SHAW CREEK,  Facility Carried by Structure: CR130
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.466,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.6m (44.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Good,  Channel: Fair,  Operating Rating: 55.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 42.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 593134,  Location: 0.8 MI. N. OF TR 141 (Lat: 40.513831,  Lng: -82.940050),  Route carried "on" structure: County highway T0138,  Year Built: 2016,  Status: Open,  Structure Length: 2.26m (7.41ft),  Average Daily Traffic: 112 (year 2013),  Truck Traffic: 3%,  Average Future Daily Traffic: 137 (year 2033),  Design Load: HL 93,  Features Intersected: SHAW CREEK .23M S/SR529,  Facility Carried by Structure: TR 138
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.350,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Satisfactory,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.26m (7.41ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Critical Feature Inspection Date: December 2019,  Bridge Improvement Cost: $450,000,000,  Total Project Cost: $45,000,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5931398,  Location: .20 MI.E.OF INT. OF TR134 (Lat: 40.502950,  Lng: -82.944400),  Route carried "on" structure: County highway T0141,  Year Built: 1922,  Year Reconstructed: 1999,  Status: Posted for load,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 100 (year 2015),  Truck Traffic: 7%,  Average Future Daily Traffic: 139 (year 2035),  Features Intersected: SHAW CREEK,  Facility Carried by Structure: TR141
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.621,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.2m (63.0ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 25.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 16.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Critical Feature Inspection Date: December 2019,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 593146,  Location: .6 MI.N.INT. CR155 (Lat: 40.460150,  Lng: -82.895469),  Route carried "on" structure: County highway C0166,  Year Built: 1963,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 217 (year 2015),  Truck Traffic: 8%,  Average Future Daily Traffic: 301 (year 2035),  Design Load: HS 20,  Features Intersected: WEST BRANCH ALUM CREEK,  Facility Carried by Structure: CR166
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.704,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 5.0m (16.4ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 64.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5931509,  Location: .30 MI.E.OF INT.OF TR28 (Lat: 40.499069,  Lng: -82.914581),  Route carried "on" structure: County highway C0011,  Year Built: 1924,  Status: Posted for load,  Structure Length: 4.82m (15.81ft),  Average Daily Traffic: 1,221 (year 2015),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,695 (year 2035),  Features Intersected: WHETSTONE,  Facility Carried by Structure: CR11
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.007,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.9m (52.2ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Superstructure: Serious,  Substructure: Serious,  Channel: Poor,  Operating Rating: 9.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 6.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Designated Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5931569,  Location: 0.30 MI. N. OF TR 136 (Lat: 40.546669,  Lng: -82.913889),  Route carried "on" structure: County highway T0132,  Year Built: 2016,  Status: Open,  Structure Length: 2.53m (8.30ft),  Average Daily Traffic: 47 (year 2015),  Truck Traffic: 6%,  Average Future Daily Traffic: 65 (year 2035),  Design Load: HL 93,  Features Intersected: SHAW CREEK,  Facility Carried by Structure: TR 132
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.189,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 64.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 48.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.53m (8.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $500,000,000,  Total Project Cost: $500,000,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5931615,  Location: 0.1 MILE E. OF TR 128 (Lat: 40.530561,  Lng: -82.874719),  Route carried "on" structure: County highway T0129,  Year Built: 2017,  Status: Open,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 109 (year 2014),  Truck Traffic: 8%,  Average Future Daily Traffic: 290 (year 2034),  Design Load: HL 93,  Features Intersected: WHETSTONE CREEK,  Facility Carried by Structure: TR 129
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.225,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.30m (10.83ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $500,000,000,  Total Project Cost: $500,000,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5931738,  Location: .30 MI.E.CARD.E.CORP.LINE (Lat: 40.499469,  Lng: -82.877261),  Route carried "on" structure: County highway T0124,  Year Built: 1960,  Year Reconstructed: 2019,  Status: Open,  Structure Length: 3.08m (10.10ft),  Average Daily Traffic: 283 (year 2005),  Average Future Daily Traffic: 393 (year 2025),  Design Load: HS 20,  Features Intersected: WHETSTONE CREEK,  Facility Carried by Structure: TR124
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.525,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.6m (97.1ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Excellent,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 58.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Critical Feature Inspection Date: December 2019,  Total Project Cost: $473,000,000 ( Estimate for 2019),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 593179,  Location: 0.7 MI. E. OF CR 66 (Lat: 40.528331,  Lng: -82.920561),  Route carried "on" structure: County highway C0137,  Year Built: 2016,  Status: Open,  Structure Length: 2.87m (9.42ft),  Average Daily Traffic: 117 (year 2015),  Truck Traffic: 8%,  Average Future Daily Traffic: 162 (year 2035),  Design Load: HL 93,  Features Intersected: SHAW CREEK,  Facility Carried by Structure: CR 137
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.127,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Fair,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.87m (9.42ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Critical Feature Inspection Date: December 2019,  Bridge Improvement Cost: $500,000,000,  Total Project Cost: $500,000,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 593213,  Location: .7 MI.E.INT.SR746 & TR25 (Lat: 40.470000,  Lng: -82.951669),  Route carried "on" structure: County highway T0025,  Year Built: 1991,  Status: Open,  Structure Length: 2.62m (8.60ft),  Average Daily Traffic: 323 (year 2015),  Truck Traffic: 7%,  Average Future Daily Traffic: 448 (year 2035),  Design Load: HS 20,  Features Intersected: WHETSTONE CREEK,  Facility Carried by Structure: TR25
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.249,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.6m (84.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Very good,  Channel: Good,  Operating Rating: 38.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Critical Feature Inspection Date: November 2019,  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5932297,  Location: .30 MI WEST CR166 (Lat: 40.467261,  Lng: -82.898619),  Route carried "on" structure: County highway C0025,  Year Built: 1964,  Year Reconstructed: 2009,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 993 (year 2015),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,378 (year 2035),  Design Load: HS 20,  Features Intersected: BRANCH ALUM CRK,  Facility Carried by Structure: CR25
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.705,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5934079,  Location: .10 MI N OF INT OF CR 139 (Lat: 40.536111,  Lng: -82.919439),  Route carried "on" structure: County highway C0028,  Year Built: 1998,  Status: Open,  Structure Length: 2.59m (8.50ft),  Average Daily Traffic: 42 (year 2015),  Truck Traffic: 7%,  Average Future Daily Traffic: 58 (year 2035),  Design Load: HS 20,  Features Intersected: SHAW CREEK,  Facility Carried by Structure: CR 28
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.552,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.3m (83.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 35.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Critical Feature Inspection Date: December 2019,  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5934125,  Location: .3 MI EAST INT SR 746 (Lat: 40.469719,  Lng: -82.957500),  Route carried "on" structure: County highway T0025,  Year Built: 1997,  Status: Open,  Structure Length: 2.50m (8.20ft),  Average Daily Traffic: 323 (year 2015),  Truck Traffic: 7%,  Average Future Daily Traffic: 448 (year 2035),  Design Load: HS 20,  Features Intersected: SHAW CREEK,  Facility Carried by Structure: TR 25
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.150,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 35.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Critical Feature Inspection Date: November 2019,  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5934133,  Location: .8 MI NORTH INTX. TR159 (Lat: 40.448000,  Lng: -82.905950),  Route carried "on" structure: County highway CR165,  Year Built: 1974,  Year Reconstructed: 2009,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 211 (year 2015),  Truck Traffic: 8%,  Average Future Daily Traffic: 293 (year 2035),  Design Load: HS 20,  Features Intersected: WEST BRANCH ALUM CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 58.628,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Satisfactory,  Culverts: Poor,  Operating Rating: 35.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: October 2021
Find on map >>   Show street view

Structure Number: 5935024,  Location: .2 MI.E.INT.CR165 &CR155 (Lat: 40.451669,  Lng: -82.901669),  Route carried "on" structure: County highway C0155,  Year Built: 2012,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 142 (year 2015),  Truck Traffic: 7%,  Average Future Daily Traffic: 197 (year 2035),  Design Load: HS 20+Mod,  Features Intersected: WEST BRANCH ALUM CREEK,  Facility Carried by Structure: CR155
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.233,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.4m (21.0ft)

Condition: Channel: Poor,  Culverts: Very good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021
Discuss Cardington, Ohio (OH) on our hugely popular Ohio forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.