Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Brewton, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 20Number of bridges
  • 400ft / 122mTotal length
  • $41,796,000Total costs
  • 82,577Total average daily traffic
  • 4,179Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Brewton
  • No street view available for this location

New bridges in Brewton, AL - historical statistics
  • New bridges - historical statistics
  • 11940-1949
  • 31950-1959
  • 21960-1969
  • 31970-1979
  • 21980-1989
  • 41990-1999
  • 52000-2009
Average Bridge Daily Traffic in Brewton, AL
Average Bridge Truck Traffic in Brewton, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 50.0%Good
  • 20.0%Satisfactory
  • 30.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 20.0%Very good
  • 30.0%Good
  • 40.0%Satisfactory
  • 10.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 20.0%Very good
  • 50.0%Good
  • 20.0%Satisfactory
  • 10.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 15.8%Very good
  • 21.1%Good
  • 42.1%Satisfactory
  • 21.1%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Good
  • 33.3%Satisfactory
  • 22.2%Fair
  • 11.1%Poor
Find on map >>   Show street view

Structure Number: 2835,  Location: 1.9 MI S CO RD 55 (Lat: 31.033522,  Lng: -87.049694),  Route carried "on" structure: State highway 41,  Year Built: 1945,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 2,960 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,440 (year 2039),  Design Load: H 15,  Features Intersected: COBB BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.128,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.7m (28.5ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $278,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $306,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 4541,  Location: 1.5 MI N CO RD 18 (Lat: 31.088306,  Lng: -87.096444),  Route carried "on" structure: US 31,  Year Built: 1953,  Year Reconstructed: 1967,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 10,649 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 15,974 (year 2039),  Design Load: H 15,  Features Intersected: MAYS BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 108.652,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 17.0m (55.8ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Poor,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2021,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $1,327,000,  Roadway Improvement Cost: $133,000,  Total Project Cost: $1,460,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 4542,  Location: 0.3 MI S SR 41 (Lat: 31.100936,  Lng: -87.076711),  Route carried "on" structure: US 31,  Year Built: 1953,  Status: Open,  Structure Length: 16.49m (54.10ft),  Average Daily Traffic: 8,186 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 12,279 (year 2039),  Design Load: HS 20,  Features Intersected: BURNT CORN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 111.005,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.4m (27.6ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 10,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 47.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 17.23m (56.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $4,489,000,  Roadway Improvement Cost: $449,000,  Total Project Cost: $4,938,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 508,  Location: 0.3 MI N CO RD 18 (Lat: 31.080058,  Lng: -87.114242),  Route carried "on" structure: US 31,  Year Built: 1955,  Year Reconstructed: 1967,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 10,649 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 15,974 (year 2039),  Design Load: HS 20,  Features Intersected: FRANKLIN MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 106.719,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 11 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.89m (6.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,399,000,  Roadway Improvement Cost: $140,000,  Total Project Cost: $1,539,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 9756,  Location: 1.5MI E N.BREWTON (Lat: 31.169117,  Lng: -87.098175),  Route carried "on" structure: ServiceCounty highway 77,  Year Built: 1968,  Status: Posted for load,  Structure Length: 14.75m (48.39ft),  Average Daily Traffic: 250 (year 1988),  Truck Traffic: 5%,  Average Future Daily Traffic: 363 (year 2034),  Design Load: H 15,  Features Intersected: BURNT CORN CREEK,  Facility Carried by Structure: COUNTY HIGHWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 11,  Length of Maximum Span: 16.8m (55.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 38.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 23.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 15.53m (50.95ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2020,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $2,449,000,  Roadway Improvement Cost: $245,000,  Total Project Cost: $2,694,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10072,  Location: 1.5MI W N.BREWTON (Lat: 31.163386,  Lng: -87.099867),  Route carried "on" structure: County highway 77,  Year Built: 1969,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 250 (year 1988),  Truck Traffic: 5%,  Average Future Daily Traffic: 156 (year 2034),  Design Load: H 15,  Features Intersected: SEVEN MILE CREEK RELIEF,  Facility Carried by Structure: COUNTY HIGHWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $240,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $264,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 10384,  Location: 0.2 M N OF DOUGLAS LANE (Lat: 31.141006,  Lng: -87.062000),  Route carried "on" structure: City street ,  Year Built: 1970,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 36 (year 2019),  Average Future Daily Traffic: 216 (year 2039),  Features Intersected: KING'S BRANCH,  Facility Carried by Structure: SOWELL ROAD
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.249,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $197,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $217,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1039,  Location: 1.5MI W N.BREWTON (Lat: 31.162317,  Lng: -87.099039),  Route carried "on" structure: County highway 77,  Year Built: 1970,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 250 (year 1988),  Truck Traffic: 5%,  Average Future Daily Traffic: 390 (year 2034),  Design Load: H 15,  Features Intersected: SEVEN MILE CREEK,  Facility Carried by Structure: COUNTY HIGHWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.0m (13.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 77.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.44m (4.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $300,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $330,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11996,  Location: 0.3 MI E ST JOSEPH ST (Lat: 31.100806,  Lng: -87.068083),  Route carried "on" structure: City street ,  Year Built: 1978,  Status: Open,  Structure Length: 14.51m (47.60ft),  Average Daily Traffic: 1,538 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,025 (year 2041),  Design Load: H 15,  Features Intersected: MURDER CREEK,  Facility Carried by Structure: LEE STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.299,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.7m (25.3ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 14,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 39.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 15.29m (50.16ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Underwater Inspection Date: January 2021,  Bridge Improvement Cost: $3,251,000,  Roadway Improvement Cost: $325,000,  Total Project Cost: $3,576,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 13608,  Location: 0.4 MI S E US 31 (Lat: 31.100994,  Lng: -87.069228),  Route carried "on" structure: US 29,  Year Built: 1985,  Status: Open,  Structure Length: 15.09m (49.51ft),  Average Daily Traffic: 13,831 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 20,747 (year 2039),  Design Load: HS 20,  Features Intersected: MURDER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.435,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 9,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 19.5m (64.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Fair,  Operating Rating: 49.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 15.86m (52.03ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Underwater Inspection Date: January 2022,  Bridge Improvement Cost: $6,960,000,  Roadway Improvement Cost: $696,000,  Total Project Cost: $7,656,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13912,  Location: 1.2 MI N SR 41 (Lat: 31.085628,  Lng: -87.048094),  Route carried "on" structure: US 29,  Year Built: 1986,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 2,362 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 3,543 (year 2040),  Design Load: HS 20,  Features Intersected: MANTEL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.290,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.5m (24.6ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 56.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $541,000,  Roadway Improvement Cost: $54,000,  Total Project Cost: $595,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 15889,  Location: 2 MI N US 31 (Lat: 31.129147,  Lng: -87.087258),  Route carried "on" structure: State highway 41,  Year Built: 1994,  Status: Open,  Structure Length: 10.39m (34.09ft),  Average Daily Traffic: 2,067 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 3,101 (year 2039),  Design Load: HS 20,  Features Intersected: BURNT CORN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.060,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 3,  Length of Maximum Span: 24.7m (81.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 36.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 11.31m (37.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $3,567,000,  Roadway Improvement Cost: $357,000,  Total Project Cost: $3,924,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1589,  Location: 1.9 MI N US 31 (Lat: 31.127714,  Lng: -87.085428),  Route carried "on" structure: State highway 41,  Year Built: 1994,  Status: Open,  Structure Length: 8.23m (27.00ft),  Average Daily Traffic: 2,067 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 3,101 (year 2039),  Design Load: HS 20,  Features Intersected: BURNT CORN RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.815,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 34.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.23m (30.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $2,911,000,  Roadway Improvement Cost: $291,000,  Total Project Cost: $3,202,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16008,  Location: 0.3 MI S SR 41 (Lat: 31.100667,  Lng: -87.077111),  Route carried "on" structure: US 31,  Year Built: 1997,  Status: Open,  Structure Length: 16.49m (54.10ft),  Average Daily Traffic: 8,186 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 12,279 (year 2039),  Design Load: HS 20,  Features Intersected: BURNT CORN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 111.005,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 10,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 54.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 17.23m (56.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $4,961,000,  Roadway Improvement Cost: $496,000,  Total Project Cost: $5,457,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16723,  Location: 500FT N DACUS ST (Lat: 31.126667,  Lng: -87.051667),  Route carried "on" structure: City street ,  Year Built: 1998,  Status: Open,  Structure Length: 1.20m (3.94ft),  Average Daily Traffic: 2,325 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,134 (year 2039),  Design Load: HS 20,  Features Intersected: KINGS BRANCH,  Facility Carried by Structure: DR M.L.K. DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.149,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.9m (12.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 76.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.88m (6.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $433,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $476,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 18661,  Location: .5 MI NE KIRKLAND (Lat: 31.191908,  Lng: -87.026331),  Route carried "on" structure: County highway ,  Year Built: 2004,  Status: Open,  Structure Length: 8.84m (29.00ft),  Average Daily Traffic: 179 (year 2004),  Truck Traffic: 29%,  Average Future Daily Traffic: 271 (year 2034),  Design Load: HS 20,  Features Intersected: MURDER CREEK,  Facility Carried by Structure: MURDER CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 61.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 9.82m (32.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $2,019,000,  Roadway Improvement Cost: $202,000,  Total Project Cost: $2,221,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 18669,  Location: .75 MI WEST OF BREWTON (Lat: 31.161919,  Lng: -87.084986),  Route carried "on" structure: County highway 49,  Year Built: 2003,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 2,650 (year 2003),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,980 (year 2034),  Design Load: HS 20,  Features Intersected: LITTLE JUNIPER CREEK,  Facility Carried by Structure: COUNTY HIGHWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 71.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $815,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $897,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 18981,  Location: 2040' N EAST STREET (Lat: 31.106667,  Lng: -87.060000),  Route carried "on" structure: City street ,  Year Built: 2003,  Status: Open,  Structure Length: 0.81m (2.66ft),  Average Daily Traffic: 36 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 216 (year 2039),  Design Load: HS 20,  Features Intersected: BRANCH OFF MURDER CRK,  Facility Carried by Structure: ST JOSEPH Avenue
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.040,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.47m (4.82ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $365,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $402,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 19514,  Location: APPLETON ROAD (Lat: 31.178847,  Lng: -87.100408),  Route carried "on" structure: County highway 49,  Year Built: 2006,  Status: Open,  Structure Length: 6.22m (20.41ft),  Average Daily Traffic: 2,796 (year 2006),  Truck Traffic: 4%,  Average Future Daily Traffic: 4,155 (year 2034),  Design Load: HS 20,  Features Intersected: BIG JUNIPER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 71.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.26m (23.82ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,493,000,  Roadway Improvement Cost: $149,000,  Total Project Cost: $1,642,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 19923,  Location: 1.2 MI. WEST OF SR 59 (Lat: 31.105833,  Lng: -87.075500),  Route carried "under" structure: State highway 182,  Year Built: 2006,  Structure Length: 0. m,  Average Daily Traffic: 11,310 (year 2013),  Truck Traffic: 2%,  Features Intersected: SR 182,  Facility Carried by Structure: PEDESTRIAN BRIDGE
Minimum Vertical Clearance: 5.76m (18.90ft),  Kilometerpoint: 8.336,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Truss - Deck,  Length of Maximum Span: 31.9m (104.7ft)

Discuss Brewton, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.