Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Bowman, Georgia (GA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 20Number of bridges
  • 115ft / 35.2mTotal length
  • $13,643,000Total costs
  • 10,665Total average daily traffic
  • 433Total average daily truck traffic
  • 16,010Total future (year 2031) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Bowman
  • No street view available for this location

New bridges in Bowman, GA - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 61950-1959
  • 21960-1969
  • 11970-1979
  • 31980-1989
  • 41990-1999
  • 22000-2009
  • 12020-2022
Reconstructed bridges in Bowman, GA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 41990-1999
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 16.7%Very good
  • 66.7%Good
  • 16.7%Failed
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 8.3%Very good
  • 58.3%Good
  • 16.7%Satisfactory
  • 16.7%Failed
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 66.7%Good
  • 16.7%Satisfactory
  • 16.7%Failed
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 5.0%Very good
  • 15.0%Good
  • 55.0%Satisfactory
  • 20.0%Fair
  • 5.0%Failed
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 87.5%Good
  • 12.5%Satisfactory
Find on map >>   Show street view

Structure Number: 1050015,  Location: IN NE BOWMAN (Lat: 34.215558,  Lng: -83.019519),  Route carried "on" structure: State highway 172,  Year Built: 1950,  Status: Open,  Structure Length: 4.51m (14.80ft),  Average Daily Traffic: 2,790 (year 2011),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,185 (year 2031),  Design Load: H 15,  Features Intersected: SOUTH BEAVERDAM CREEK,  Facility Carried by Structure: N BROAD STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.656,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 11.3m (37.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 19.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 44.74m (146.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $578,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $867,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1050025,  Location: 3.5 MI SW OF BOWMAN (Lat: 34.176689,  Lng: -83.077539),  Route carried "on" structure: State highway 172,  Year Built: 1992,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 2,150 (year 2011),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,225 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: MILL SHOAL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $180,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $270,000
Find on map >>   Show street view

Structure Number: 1055025,  Location: 4 MI SW OF BOWMAN (Lat: 34.159319,  Lng: -83.065778),  Route carried "on" structure: County highway 93,  Year Built: 1952,  Year Reconstructed: 2004,  Status: Posted for load,  Structure Length: 2.68m (8.79ft),  Average Daily Traffic: 20 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 30 (year 2031),  Features Intersected: BUTLER CREEK,  Facility Carried by Structure: KING HALL MILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 3.4m (11.2ft),  Out-to-Out Width: 3.8m (12.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 10.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 6.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 42.92m (140.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $250,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $375,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 1055026,  Location: 3.3 MI SW OF BOWMAN (Lat: 34.169058,  Lng: -83.068639),  Route carried "on" structure: County highway 96,  Year Built: 1993,  Year Reconstructed: 1999,  Status: Closed,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 110 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 165 (year 2031),  Features Intersected: MILL SHOAL CREEK,  Facility Carried by Structure: BROWNS BRIDGE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.430,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 4.1m (13.5ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Failed,  Superstructure: Failed,  Substructure: Failed,  Channel: Satisfactory,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 161.91m (531.20ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: October 2020,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $80,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $119,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1055027,  Location: 4.8 MI S OF BOWMAN (Lat: 34.138639,  Lng: -83.020878),  Route carried "on" structure: County highway 100,  Year Built: 1956,  Year Reconstructed: 1999,  Status: Closed,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 10 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 15 (year 2031),  Features Intersected: FORK CREEK,  Facility Carried by Structure: ROY TURMAN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.3m (37.1ft),  Curb-To-Curb Width: 4.1m (13.5ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Failed,  Superstructure: Failed,  Substructure: Failed,  Channel: Failed,  Deck Geometry: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 162.03m (531.59ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: October 2020,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $105,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $158,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1055028,  Location: 4.5 MI SE OF BOWMAN (Lat: 34.144197,  Lng: -83.007308),  Route carried "on" structure: County highway 102,  Year Built: 1950,  Year Reconstructed: 1998,  Status: Posted for load,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 20 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 30 (year 2031),  Features Intersected: DEEP CREEK,  Facility Carried by Structure: HUGHES ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 4.1m (13.5ft),  Out-to-Out Width: 4.4m (14.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 36.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 41.15m (135.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $124,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 105503,  Location: 1.5 MI W OF BOWMAN (Lat: 34.203239,  Lng: -83.054739),  Route carried "on" structure: County highway 143,  Year Built: 1960,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Design Load: H 15,  Features Intersected: BUTLER CREEK TRIB,  Facility Carried by Structure: HENDRICK STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $123,000
Find on map >>   Show street view

Structure Number: 1055031,  Location: 1.3 MI N OF BOWMAN (Lat: 34.223558,  Lng: -83.032769),  Route carried "on" structure: County highway 154,  Year Built: 1921,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 4.30m (14.11ft),  Average Daily Traffic: 60 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 90 (year 2031),  Design Load: H 15,  Features Intersected: SOUTH BEAVERDAM CREEK,  Facility Carried by Structure: WINNS MILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 4.4m (14.4ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $401,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $601,000,  Deck Structure Type: Open Grating
Find on map >>   Show street view

Structure Number: 1055058,  Location: 3.5 MI S OF BOWMAN (Lat: 34.158650,  Lng: -83.019647),  Route carried "on" structure: County highway 309,  Year Built: 1975,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 520 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 780 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: FORK CREEK,  Facility Carried by Structure: DEEP CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $102,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $152,000
Find on map >>   Show street view

Structure Number: 1055059,  Location: 3.5 MI SE OF BOWMAN (Lat: 34.157469,  Lng: -83.004719),  Route carried "on" structure: County highway 309,  Year Built: 1950,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 520 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 780 (year 2031),  Design Load: H 15,  Features Intersected: DEEP CREEK,  Facility Carried by Structure: MATCH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.047,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000
Find on map >>   Show street view

Structure Number: 1055065,  Location: 2.5 MI SE OF BOWMAN (Lat: 34.174139,  Lng: -83.010239),  Route carried "on" structure: County highway 130,  Year Built: 1994,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: FORK CREEK,  Facility Carried by Structure: STANLEY MAXWELL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $86,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $129,000
Find on map >>   Show street view

Structure Number: 1055083,  Location: 2.3 MI E OF BOWMAN (Lat: 34.201508,  Lng: -82.992139),  Route carried "on" structure: County highway 161,  Year Built: 2001,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 70 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 105 (year 2031),  Features Intersected: SOUTH BEAVERDAM CREEK,  Facility Carried by Structure: BRICKYARD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 4.2m (13.8ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: High priority of replacement,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $124,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1055085,  Location: 3.6 MI S OF BOWMAN (Lat: 34.146450,  Lng: -83.026897),  Route carried "on" structure: County highway 100,  Year Built: 2002,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 50 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 75 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: FORK CREEK,  Facility Carried by Structure: DUNN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $123,000
Find on map >>   Show street view

Structure Number: 1055092,  Location: 4.5 MI S OF BOWMAN (Lat: 34.142000,  Lng: -83.008600),  Route carried "on" structure: County highway 313,  Year Built: 2020,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 25 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 50 (year 2041),  Design Load: HL 93,  Features Intersected: DEEP CREEK,  Facility Carried by Structure: FORK CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.19m (7.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $5,328,000,  Roadway Improvement Cost: $533,000,  Total Project Cost: $7,992,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1470014,  Location: 7 MI SE OF ROYSTON (Lat: 34.236319,  Lng: -82.998658),  Route carried "on" structure: State highway 172,  Year Built: 1964,  Status: Open,  Structure Length: 4.39m (14.40ft),  Average Daily Traffic: 2,080 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,120 (year 2031),  Design Load: HS 20,  Features Intersected: LITTLE BEAVERDAM CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 32.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 165.32m (542.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $563,000,  Roadway Improvement Cost: $56,000,  Total Project Cost: $844,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 147002,  Location: 1.4 MI NE OF VANNA (Lat: 34.248158,  Lng: -83.048589),  Route carried "on" structure: County highway 508,  Year Built: 1958,  Status: Posted for load,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 410 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 615 (year 2031),  Design Load: H 15,  Features Intersected: BEAVERDAM CREEK,  Facility Carried by Structure: VANNA ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 29.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 43.34m (142.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $399,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $598,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1475022,  Location: 5 MI E OF VANNA (Lat: 34.225258,  Lng: -82.985239),  Route carried "on" structure: County highway 94,  Year Built: 1983,  Status: Open,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 90 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 135 (year 2031),  Features Intersected: LITTLE BEAVERDAM CREEK,  Facility Carried by Structure: MAXWELL MILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.4m (66.9ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $262,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $393,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1475023,  Location: 5 MI E OF VANNA (Lat: 34.221400,  Lng: -82.983008),  Route carried "on" structure: County highway 95,  Year Built: 1983,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 20 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 30 (year 2031),  Features Intersected: LITTLE BEAVERDAM CREEK,  Facility Carried by Structure: SAM TODD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 82.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $199,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $299,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1475072,  Location: 8.75 MI S OF HARTWELL (Lat: 34.236192,  Lng: -83.000553),  Route carried "on" structure: County highway 97,  Year Built: 1998,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 30 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 45 (year 2032),  Design Load: H 15,  Features Intersected: LITTLE BEAVERDAM CR TRIB,  Facility Carried by Structure: BEAVERDAM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: January 2021,  Underwater Inspection Date: October 2021,  Bridge Improvement Cost: $109,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $164,000
Find on map >>   Show street view

Structure Number: 1955001,  Location: 9 MI N OF COMER (Lat: 34.195939,  Lng: -83.101578),  Route carried "on" structure: County highway 6,  Year Built: 1984,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: MILL SHOAL CREEK,  Facility Carried by Structure: PARHAM-DUDLEY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021