  • 11Number of bridges
  • 72ft / 21.7mTotal length
  • $16,205,000Total costs
  • 27,390Total average daily traffic
  • 2,198Total average daily truck traffic
  • 61,060Total future (year 2031) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Barre
  • No street view available for this location

New bridges in Barre, MA - historical statistics
  • New bridges - historical statistics
  • 91930-1939
  • 11950-1959
  • 12010-2019
Reconstructed bridges in Barre, MA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 11990-1999
  • 12000-2009
Average Bridge Daily Traffic in Barre, MA
Average Bridge Truck Traffic in Barre, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 9.1%Very good
  • 27.3%Good
  • 45.5%Fair
  • 18.2%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 9.1%Very good
  • 18.2%Good
  • 18.2%Satisfactory
  • 18.2%Fair
  • 36.4%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 9.1%Very good
  • 18.2%Good
  • 54.5%Satisfactory
  • 18.2%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 9.1%Very good
  • 63.6%Good
  • 27.3%Satisfactory
Find on map >>   Show street view

Structure Number: B0200316KMUNNBI,  Location: 0.5M W JCT RTS32/122&RT62 (Lat: 42.420078,  Lng: -72.094925),  Route carried "on" structure: City street ,  Year Built: 1938,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 3,100 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 4,422 (year 2032),  Features Intersected: WATER PRINCE RIVER,  Facility Carried by Structure: HWY VALLEY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.628,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.8m (45.3ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 65.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2021,  Other Special Inspection Date: August 2021,  Bridge Improvement Cost: $642,000,  Roadway Improvement Cost: $65,000,  Total Project Cost: $964,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: B0200416LMUNNBI,  Location: 300' E OF VALLEY RD (Lat: 42.414342,  Lng: -72.094994),  Route carried "on" structure: City street ,  Year Built: 1938,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 259 (year 2019),  Average Future Daily Traffic: 2,653 (year 2032),  Features Intersected: WATER PRINCE RIVER,  Facility Carried by Structure: HWY OLD COLDBRK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 55.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Other Special Inspection Date: July 2021,  Bridge Improvement Cost: $523,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $785,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: B0200619YDOTNBI,  Location: 0.7 MI S OF ST 122 (Lat: 42.399525,  Lng: -72.101322),  Route carried "on" structure: State highway 32,  Year Built: 1938,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 4,010 (year 2014),  Truck Traffic: 9%,  Average Future Daily Traffic: 6,949 (year 2033),  Design Load: H 20,  Features Intersected: WATER PRINCE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 53.443,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $999,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,499,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: B0200719XDOTNBI,  Location: 300' N OF JCT MAIN ST (Lat: 42.385889,  Lng: -72.097631),  Route carried "on" structure: State highway 32,  Year Built: 1937,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 2.72m (8.92ft),  Average Daily Traffic: 3,584 (year 2005),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,660 (year 2031),  Design Load: HS 25 or greater,  Features Intersected: WATER WARE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 51.868,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.2m (30.2ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.9m (85.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Inventory Rating: 53.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,109,000,  Roadway Improvement Cost: $111,000,  Total Project Cost: $1,664,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: B0200819WDOTNBI,  Location: 0.6 MI N OF JCT 67 (Lat: 42.383986,  Lng: -72.099592),  Route carried "on" structure: State highway 32,  Year Built: 1934,  Status: Posted for load,  Structure Length: 0.86m (2.82ft),  Average Daily Traffic: 3,750 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 10,581 (year 2033),  Features Intersected: WATER WARE CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 51.659,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.7m (25.3ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 7.7m (25.3ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 33.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2022,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $358,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $538,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: B0200915JMUNNBI,  Location: 1500' N OF INT PEACH ST (Lat: 42.381667,  Lng: -72.104917),  Route carried "on" structure: State highway 32,  Year Built: 1938,  Status: Posted for load,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 2,960 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 9,002 (year 2032),  Features Intersected: WATER CANAL OVERFLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.025,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 41.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: December 2021,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $1,203,000,  Roadway Improvement Cost: $121,000,  Total Project Cost: $1,805,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: B0201019VDOTNBI,  Location: JCT OF ADAMS ROAD (Lat: 42.380311,  Lng: -72.114119),  Route carried "on" structure: State highway 32,  Year Built: 1938,  Year Reconstructed: 1998,  Status: Open,  Structure Length: 2.76m (9.06ft),  Average Daily Traffic: 2,455 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,268 (year 2031),  Design Load: HS 20,  Features Intersected: WATER WARE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 50.049,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 13.1m (43.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 81.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: August 2020,  Underwater Inspection Date: July 2019,  Bridge Improvement Cost: $1,136,000,  Roadway Improvement Cost: $114,000,  Total Project Cost: $1,705,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: B020129CNMUNNBI,  Location: INT. OF RTE 122/ VERNON (Lat: 42.390300,  Lng: -72.080053),  Route carried "on" structure: City street ,  Year Built: 2010,  Status: Open,  Structure Length: 4.83m (15.85ft),  Average Daily Traffic: 2,069 (year 2016),  Truck Traffic: 20%,  Average Future Daily Traffic: 4,580 (year 2033),  Design Load: HS 25 or greater,  Features Intersected: WATER WARE RIVER,  Facility Carried by Structure: HWY VERNON AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 10.0m (32.8ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.5m (77.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Inventory Rating: 63.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.90m (16.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $1,571,000,  Roadway Improvement Cost: $158,000,  Total Project Cost: $2,357,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: B0201418XDOTNBI,  Location: BARRE-OAKHAM TOWN LINE (Lat: 42.393833,  Lng: -72.051750),  Route carried "on" structure: State highway 122,  Year Built: 1954,  Status: Open,  Structure Length: 2.18m (7.15ft),  Average Daily Traffic: 2,069 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 5,922 (year 2033),  Design Load: H 20,  Features Intersected: WATER WARE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 70.389,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.1m (65.9ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 33.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: January 2022,  Underwater Inspection Date: June 2020,  Bridge Improvement Cost: $1,184,000,  Roadway Improvement Cost: $119,000,  Total Project Cost: $1,777,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: B0201715FMUNNBI,  Location: 3.0 MI W OF RT 68 (Lat: 42.437428,  Lng: -72.040119),  Route carried "on" structure: State highway 62,  Year Built: 1933,  Status: Posted for load,  Structure Length: 1.06m (3.48ft),  Average Daily Traffic: 1,201 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,370 (year 2032),  Features Intersected: WATER CANESTO BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.961,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 56.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 36 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Underwater Inspection Date: October 2020,  Other Special Inspection Date: July 2021,  Bridge Improvement Cost: $1,302,000,  Roadway Improvement Cost: $131,000,  Total Project Cost: $1,954,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: B0201815GMUNNBI,  Location: 1 M W OF HUBBARDSTON (Lat: 42.436306,  Lng: -72.052639),  Route carried "on" structure: State highway 62,  Year Built: 1938,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 1,933 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,653 (year 2032),  Design Load: HS 20,  Features Intersected: WATER BURNSHIRT RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.747,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.6m (57.7ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 67.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.90m (6.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $771,000,  Roadway Improvement Cost: $78,000,  Total Project Cost: $1,157,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Discuss Barre, Massachusetts (MA) on our hugely popular Massachusetts forum.