Bridge Statistics for Alma, Georgia (GA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 12Number of bridges
  • 194ft / 59.4mTotal length
  • $81,000,000Total costs
  • 35,860Total average daily traffic
  • 1,101Total average daily truck traffic
  • 53,790Total future (year 2031) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Alma
  • No street view available for this location

New bridges in Alma, GA - historical statistics
  • New bridges - historical statistics
  • 11940-1949
  • 31950-1959
  • 11970-1979
  • 21980-1989
  • 21990-1999
  • 12000-2009
  • 12010-2019
  • 12020-2022
Average Bridge Daily Traffic in Alma, GA
Average Bridge Truck Traffic in Alma, GA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 33.3%Very good
  • 66.7%Good
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 33.3%Very good
  • 66.7%Good
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 16.7%Very good
  • 66.7%Good
  • 16.7%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 58.3%Very good
  • 41.7%Good
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 83.3%Good
  • 16.7%Satisfactory
Find on map >>   Show street view

Structure Number: 50003,  Location: N CITY LIMITS OF ALMA (Lat: 31.567919,  Lng: -82.464250),  Route carried "on" structure: US 1,  Year Built: 1945,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 9.75m (31.99ft),  Average Daily Traffic: 5,670 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 8,505 (year 2031),  Design Load: H 20,  Features Intersected: HURRICANE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.703,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.0m (68.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 25.1m (82.3ft),  Out-to-Out Width: 26.1m (85.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 36.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 16.18m (53.08ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2020,  Underwater Inspection Date: October 2018,  Bridge Improvement Cost: $2,273,000,  Roadway Improvement Cost: $227,000,  Total Project Cost: $3,410,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 50004,  Location: 0.5 MI N OF ALMA (Lat: 31.573439,  Lng: -82.461697),  Route carried "on" structure: US 1,  Year Built: 1953,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 5,670 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 8,505 (year 2031),  Design Load: H 15,  Features Intersected: HURRICANE CREEK O/F
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.703,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 25.0m (82.0ft),  Out-to-Out Width: 26.0m (85.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.92m (39.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,279,000,  Roadway Improvement Cost: $128,000,  Total Project Cost: $1,918,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 50008,  Location: 0.5 MI N OF ALMA (Lat: 31.552608,  Lng: -82.466978),  Route carried "on" structure: Alternate State highway 4,  Year Built: 1972,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 930 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,395 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: BEAR BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 58.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $176,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $264,000
Find on map >>   Show street view

Structure Number: 50021,  Location: 2.25 MI SW OF ALMA (Lat: 31.509419,  Lng: -82.503069),  Route carried "on" structure: County highway 1827,  Year Built: 1954,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 1,070 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,605 (year 2031),  Design Load: H 15,  Features Intersected: MILL BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.656,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $117,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $176,000
Find on map >>   Show street view

Structure Number: 50026,  Location: 2 MI W OF ALMA (Lat: 31.544958,  Lng: -82.544428),  Route carried "on" structure: State highway 32,  Year Built: 1987,  Status: Open,  Structure Length: 9.75m (31.99ft),  Average Daily Traffic: 4,240 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 6,360 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: LITTLE HURRICANE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,250,000,  Roadway Improvement Cost: $125,000,  Total Project Cost: $1,875,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 50028,  Location: IN ALMA CITY LIMITS (Lat: 31.552108,  Lng: -82.464778),  Route carried "on" structure: US 1,  Year Built: 1995,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 5,940 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 8,910 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: BEAR BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.093,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 95.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $227,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $341,000
Find on map >>   Show street view

Structure Number: 55006,  Location: 5.5 MI S OF ALMA (Lat: 31.499981,  Lng: -82.497469),  Route carried "on" structure: County highway 124,  Year Built: 1950,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Design Load: H 15,  Features Intersected: MILL BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.047,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $156,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $234,000
Find on map >>   Show street view

Structure Number: 55015,  Location: IN ALMA CITY LIMITS (Lat: 31.552069,  Lng: -82.477350),  Route carried "on" structure: County highway 217,  Year Built: 1982,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: BEAR BRANCH,  Facility Carried by Structure: DOUGLAS STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 70.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $90,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $135,000
Find on map >>   Show street view

Structure Number: 55016,  Location: E CTY LMTS OF ALMA (Lat: 31.538978,  Lng: -82.446458),  Route carried "on" structure: State highway 32,  Year Built: 1998,  Status: Open,  Structure Length: 12.80m (41.99ft),  Average Daily Traffic: 5,810 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 8,715 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: HURRICANE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.484,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 6,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 23.0m (75.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 48.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $2,536,000,  Roadway Improvement Cost: $254,000,  Total Project Cost: $3,804,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 55019,  Location: 6 M. N OF ALMA (Lat: 31.595639,  Lng: -82.462039),  Route carried "on" structure: US 1,  Year Built: 2000,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 4,670 (year 2011),  Truck Traffic: 17%,  Average Future Daily Traffic: 7,005 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: LITTLE HURRICANE CR TRIB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.921,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.6m (74.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 1.5m (4.9ft)

Condition: Channel: Very good,  Culverts: Good,  Inventory Rating: 64.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $163,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $245,000
Find on map >>   Show street view

Structure Number: 55024,  Location: 4 MI SW OF ALMA (Lat: 31.495658,  Lng: -82.527919),  Route carried "on" structure: County highway 1827,  Year Built: 2018,  Status: Open,  Structure Length: 10.36m (33.99ft),  Average Daily Traffic: 610 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 915 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: LITTLE HURRICANE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 10.5m (34.4ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 20,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 72.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.44m (40.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $30,192,000,  Roadway Improvement Cost: $3,019,000,  Total Project Cost: $45,288,000 ( Estimate for 2018),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 55026,  Location: 5.5 MI NW OF ALMA (Lat: 31.572128,  Lng: -82.563528),  Route carried "on" structure: County highway 159,  Year Built: 2021,  Status: Open,  Structure Length: 5.33m (17.49ft),  Average Daily Traffic: 50 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 75 (year 2041),  Design Load: HL 93,  Features Intersected: LITTLE HURRICANE CREEK,  Facility Carried by Structure: CHINA ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 86.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.40m (21.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $15,540,000,  Roadway Improvement Cost: $1,554,000,  Total Project Cost: $23,310,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric