Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for San Pablo, California (CA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 14Number of bridges
  • 89ft / 27.0mTotal length
  • 929,492Total average daily traffic
  • 27,533Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for San Pablo
  • No street view available for this location

New bridges in San Pablo, CA - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 61950-1959
  • 11960-1969
  • 11970-1979
  • 11980-1989
  • 31990-1999
  • 12010-2019
Average Bridge Daily Traffic in San Pablo, CA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 14.3%Good
  • 14.3%Satisfactory
  • 42.9%Fair
  • 28.6%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 85.7%Good
  • 14.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 10.0%Excellent
  • 10.0%Very good
  • 40.0%Good
  • 30.0%Satisfactory
  • 10.0%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 40.0%Good
  • 60.0%Satisfactory
Find on map >>   Show street view

Structure Number: 28 0080L,  Location: 04-CC-080-2.04-RCH (Lat: 37.925183,  Lng: -122.320786),  Route carried "on" structure: Interstate 80,  Year Built: 1997,  Status: Open,  Structure Length: 7.01m (23.00ft),  Average Daily Traffic: 89,500 (year 2009),  Truck Traffic: 3%,  Average Future Daily Traffic: 115,001 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: CUTTING BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.040,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 18.7m (61.4ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 31.6m (103.7ft),  Curb-To-Curb Width: 18.7m (61.4ft),  Out-to-Out Width: 19.7m (64.6ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 28 0089,  Location: 04-CC-080-4.34-SPB (Lat: 37.955761,  Lng: -122.329981),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Open,  Structure Length: 3.94m (12.93ft),  Average Daily Traffic: 29,196 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 43,614 (year 2041),  Design Load: HS 20,  Features Intersected: INTERSTATE 80,  Facility Carried by Structure: SAN PABLO DAM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 18.9m (62.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 25.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 28 0107,  Location: 04-CC-080-4.81 (Lat: 37.962503,  Lng: -122.328639),  Route carried "on" structure: Interstate 80,  Year Built: 1954,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 179,000 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 230,004 (year 2039),  Features Intersected: SAN PABLO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.810,  Lanes on structure: 10,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 30.5m (100.1ft),  Skew: 35 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft)

Condition: Channel: Good,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021
Find on map >>   Show street view

Structure Number: 28 0175,  Location: 04-CC-080-3.99-SPB (Lat: 37.951239,  Lng: -122.327114),  Route carried "on" structure: Interstate 80,  Year Built: 1956,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 179,000 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 230,004 (year 2039),  Features Intersected: WILDCAT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.990,  Lanes on structure: 8,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 30.5m (100.1ft),  Skew: 39 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021
Find on map >>   Show street view

Structure Number: 28C005,  Location: 200 FT E OF S MAIN ST (Lat: 37.887281,  Lng: -122.055600),  Route carried "on" structure: City street ,  Year Built: 1959,  Status: Open,  Structure Length: 2.50m (8.20ft),  Average Daily Traffic: 800 (year 2013),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,627 (year 2038),  Design Load: HS 20,  Features Intersected: SAN RAMON CREEK,  Facility Carried by Structure: CREEKSIDE DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 1.3m (4.3ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 15.1m (49.5ft)

Condition: Deck: Poor,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 41.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 28C0057,  Location: AT ROAD 20 (Lat: 37.962622,  Lng: -122.345128),  Route carried "on" structure: City street ,  Year Built: 1926,  Year Reconstructed: 1970,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 20,490 (year 2013),  Truck Traffic: 5%,  Average Future Daily Traffic: 30,431 (year 2042),  Design Load: H 15,  Features Intersected: SAN PABLO CREEK,  Facility Carried by Structure: SAN PABLO AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 21.6m (70.9ft),  Skew: 9 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 2.3m (7.5ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 21.3m (69.9ft),  Out-to-Out Width: 25.9m (85.0ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 25.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 15.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 28C0322,  Location: 0.1 MI S SAN PABLO AVE (Lat: 37.957950,  Lng: -122.340767),  Route carried "on" structure: City street ,  Year Built: 1973,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 13,320 (year 2010),  Truck Traffic: 4%,  Average Future Daily Traffic: 15,653 (year 2036),  Design Load: HS 20,  Features Intersected: WILDCAT CREEK,  Facility Carried by Structure: CHURCH LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 21.4m (70.2ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 2.7m (8.9ft),  Right: 2.7m (8.9ft),  Curb-To-Curb Width: 21.4m (70.2ft),  Out-to-Out Width: 29.0m (95.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: December 2018
Find on map >>   Show street view

Structure Number: 28C0323,  Location: 0.1 MI S EL PORTAL (Lat: 37.961986,  Lng: -122.336367),  Route carried "on" structure: City street ,  Year Built: 1955,  Status: Open,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 12,540 (year 2010),  Truck Traffic: 2%,  Average Future Daily Traffic: 20,855 (year 2042),  Design Load: H 20,  Features Intersected: SAN PABLO CREEK,  Facility Carried by Structure: CHURCH LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.3m (46.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.9m (25.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Poor,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 61.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 28C0324,  Location: 0.1 MI S OF BROOKSIDE DR. (Lat: 37.961875,  Lng: -122.355767),  Route carried "on" structure: City street ,  Year Built: 1994,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 25,106 (year 2010),  Truck Traffic: 1%,  Average Future Daily Traffic: 28,755 (year 2038),  Features Intersected: WILDCAT CREEK,  Facility Carried by Structure: 13TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 23.5m (77.1ft),  Skew: 22 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.7m (15.4ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 19.8m (65.0ft),  Out-to-Out Width: 23.3m (76.4ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: December 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 28C0326,  Location: AT PARR BLVD (Lat: 37.966578,  Lng: -122.356342),  Route carried "on" structure: City street ,  Year Built: 1981,  Status: Open,  Structure Length: 2.89m (9.48ft),  Average Daily Traffic: 5,000 (year 2006),  Truck Traffic: 1%,  Average Future Daily Traffic: 8,326 (year 2042),  Features Intersected: SAN PABLO CREEK,  Facility Carried by Structure: GIANT HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.8m (48.6ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Excellent,  Operating Rating: 52.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 28C0327,  Location: 0.1 MI S STANTON AVE (Lat: 37.977175,  Lng: -122.353486),  Route carried "on" structure: City street ,  Year Built: 1993,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 4,220 (year 2010),  Truck Traffic: 10%,  Average Future Daily Traffic: 8,125 (year 2038),  Features Intersected: RHEAM CREEK,  Facility Carried by Structure: GIANT HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.4m (47.2ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: December 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 28C0492,  Location: 0.1 MI S SAN PABLO AVE (Lat: 37.959197,  Lng: -122.343697),  Route carried "on" structure: City street ,  Year Built: 1960,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 13,320 (year 2010),  Truck Traffic: 4%,  Average Future Daily Traffic: 15,758 (year 2038),  Features Intersected: WILDCAT CREEK,  Facility Carried by Structure: VAN NESS STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.2m (33.5ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 34.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 20.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 28 0089,  Location: 04-CC-080-4.34-SPB (Lat: 37.955761,  Lng: -122.329981),  Route carried "under" structure: Interstate 80,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 179,000 (year 2019),  Truck Traffic: 3%,  Features Intersected: INTERSTATE 80,  Facility Carried by Structure: SAN PABLO DAM ROAD
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 4.340,  Lanes on structure: 4,  Lanes under structure: 8,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 18.3m (60.0ft)

Find on map >>   Show street view

Structure Number: 28 0405,  Location: 04-CC-080-4.06-SPB (Lat: 37.953194,  Lng: -122.328806),  Route carried "under" structure: Interstate 80,  Year Built: 2016,  Structure Length: 0. m,  Average Daily Traffic: 179,000 (year 2019),  Truck Traffic: 3%,  Features Intersected: INTERSTATE 80,  Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 5.82m (19.09ft),  Kilometerpoint: 4.060,  Lanes under structure: 9,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.2m (158.1ft)

Discuss San Pablo, California (CA) on our hugely popular California forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.