Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Raton, New Mexico (NM)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 39Number of bridges
  • 325ft / 99.2mTotal length
  • $3,784,000Total costs
  • 131,662Total average daily traffic
  • 44,259Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Raton
  • No street view available for this location

New bridges in Raton, NM - historical statistics
  • New bridges - historical statistics
  • 21930-1939
  • 41940-1949
  • 111950-1959
  • 111960-1969
  • 21980-1989
  • 81990-1999
  • 12000-2009
Reconstructed bridges in Raton, NM - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21980-1989
  • 11990-1999
Average Bridge Daily Traffic in Raton, NM
Average Bridge Truck Traffic in Raton, NM
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 31.6%Good
  • 42.1%Satisfactory
  • 26.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 5.3%Very good
  • 21.1%Good
  • 47.4%Satisfactory
  • 21.1%Fair
  • 5.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.3%Very good
  • 26.3%Good
  • 42.1%Satisfactory
  • 21.1%Fair
  • 5.3%Critical
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 9.1%Very good
  • 54.5%Good
  • 36.4%Satisfactory
Find on map >>   Show street view

Structure Number: 5445,  Location: 0.1 MI E OF JCT LOOP-17 (Lat: 36.905567,  Lng: -104.438281),  Route carried "on" structure: City street 5656,  Year Built: 1940,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 106 (year 2020),  Average Future Daily Traffic: 176 (year 2040),  Design Load: H 15,  Features Intersected: NM-72
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.002,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.9m (48.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 16.0m (52.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 5464,  Location: 5.0 MI E OF JCT LOOP-17 (Lat: 36.919506,  Lng: -104.369417),  Route carried "on" structure: State highway 72,  Year Built: 1954,  Status: Open,  Structure Length: 3.08m (10.10ft),  Average Daily Traffic: 120 (year 2020),  Truck Traffic: 21%,  Average Future Daily Traffic: 103 (year 2040),  Design Load: HS 15,  Features Intersected: SUGARITE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.929,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 44.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.08m (10.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $111,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $167,000 ( Estimate for 2030),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6106,  Location: SOUTH INTERCHANGE/RATON (Lat: 36.864736,  Lng: -104.439158),  Route carried "on" structure: Interstate 25,  Year Built: 1959,  Year Reconstructed: 1985,  Status: Open,  Structure Length: 5.88m (19.29ft),  Average Daily Traffic: 4,071 (year 2020),  Truck Traffic: 37%,  Average Future Daily Traffic: 6,969 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: US 64/LOOP-17
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 724.366,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 14 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 50.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6107,  Location: SOUTH INTERCHANGE/RATON (Lat: 36.864944,  Lng: -104.439292),  Route carried "on" structure: Interstate 25,  Year Built: 1959,  Year Reconstructed: 1985,  Status: Open,  Structure Length: 5.88m (19.29ft),  Average Daily Traffic: 5,468 (year 2020),  Truck Traffic: 37%,  Average Future Daily Traffic: 9,360 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: US 64/LOOP-17
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 724.366,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 14 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 50.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6108,  Location: Junction I-25/US-64/87 (Lat: 36.885017,  Lng: -104.431028),  Route carried "on" structure: US 64,  Year Built: 1959,  Status: Open,  Structure Length: 7.25m (23.79ft),  Average Daily Traffic: 3,198 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 2,468 (year 2040),  Design Load: HS 20,  Features Intersected: I-25 NBL/SBL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 562.698,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Skew: 11 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.6m (70.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 43.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.28m (23.88ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 48 months,  Inspection Date: September 2020,  Other Special Inspection Date: October 2018,  Bridge Improvement Cost: $340,000,  Roadway Improvement Cost: $94,000,  Total Project Cost: $570,000 ( Estimate for 2030),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6109,  Location: Junction I-25/US-64/87 (Lat: 36.884806,  Lng: -104.431086),  Route carried "on" structure: US 64,  Year Built: 1959,  Status: Open,  Structure Length: 7.25m (23.79ft),  Average Daily Traffic: 3,198 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 2,468 (year 2040),  Design Load: HS 20,  Features Intersected: I-25 NBL/SBL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 562.086,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 11 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.6m (70.9ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 43.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.28m (23.88ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 48 months,  Inspection Date: September 2020,  Other Special Inspection Date: October 2018,  Bridge Improvement Cost: $340,000,  Roadway Improvement Cost: $94,000,  Total Project Cost: $570,000 ( Estimate for 2030),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 611,  Location: 0.5 MI N OF S RATON INTER (Lat: 36.870456,  Lng: -104.436933),  Route carried "on" structure: City street 5650,  Year Built: 1959,  Status: Open,  Structure Length: 6.46m (21.19ft),  Average Daily Traffic: 234 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 439 (year 2040),  Design Load: HS 20,  Features Intersected: I-25 NBL/SBL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.241,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 52.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.46m (21.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $551,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $826,000 ( Estimate for 2030),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6209,  Location: 1.0 MI N OF JCT US-64/87 (Lat: 36.900328,  Lng: -104.424864),  Route carried "on" structure: State highway 72,  Year Built: 1960,  Status: Open,  Structure Length: 6.77m (22.21ft),  Average Daily Traffic: 655 (year 2020),  Truck Traffic: 21%,  Average Future Daily Traffic: 563 (year 2040),  Design Load: HS 20,  Features Intersected: I-25 NBL/SBL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.537,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 50.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.77m (22.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $351,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $527,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 621,  Location: 2.2 MI N OF JCT US-64/87 (Lat: 36.912503,  Lng: -104.430564),  Route carried "on" structure: Interstate 25,  Year Built: 1960,  Status: Open,  Structure Length: 4.27m (14.01ft),  Average Daily Traffic: 9,945 (year 2020),  Truck Traffic: 51%,  Average Future Daily Traffic: 14,250 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: LINCOLN AVENUE (RATON)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 730.159,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 6211,  Location: 2.2 MI N OF JCT US-64/87 (Lat: 36.912342,  Lng: -104.430625),  Route carried "on" structure: Interstate 25,  Year Built: 1960,  Status: Open,  Structure Length: 4.27m (14.01ft),  Average Daily Traffic: 9,945 (year 2020),  Truck Traffic: 51%,  Average Future Daily Traffic: 14,250 (year 2040),  Design Load: HS 20,  Features Intersected: LINCOLN AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 730.243,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 48.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 6212,  Location: 2.4 MI N OF JCT US-64/87 (Lat: 36.913489,  Lng: -104.434575),  Route carried "on" structure: City street 5656,  Year Built: 1960,  Status: Open,  Structure Length: 6.13m (20.11ft),  Average Daily Traffic: 1,776 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,894 (year 2040),  Design Load: HS 20,  Features Intersected: I-25 NBL/SBL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.869,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.0m (29.5ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 17.1m (56.1ft),  Curb or Sidewalk Widths: Left: 1.3m (4.3ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 51.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6346,  Location: 0.2 MI E OF JCT LOOP-17 (Lat: 36.905700,  Lng: -104.436000),  Route carried "on" structure: City street 5652,  Year Built: 1962,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 1,546 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,731 (year 2040),  Design Load: HS 20,  Features Intersected: RATON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.343,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 77.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2021
Find on map >>   Show street view

Structure Number: 6929,  Location: 3.2 Mi S Loop-17/Raton S (Lat: 36.818025,  Lng: -104.443272),  Route carried "on" structure: US 64,  Year Built: 1969,  Status: Open,  Structure Length: 9.21m (30.22ft),  Average Daily Traffic: 569 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 914 (year 2040),  Design Load: HS 20,  Features Intersected: I-25 NBL/SBL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 553.803,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 21.9m (71.9ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7546,  Location: 0.1 MI N OF SUGARITE ST (Lat: 36.907128,  Lng: -104.437183),  Route carried "on" structure: City street 5656,  Year Built: 1933,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 1,776 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,894 (year 2040),  Design Load: HS 20,  Features Intersected: RATON CREEK,  Facility Carried by Structure: First Street
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.0m,  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $38,000,  Roadway Improvement Cost: $3,000,  Total Project Cost: $58,000 ( Estimate for 2030),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7733,  Location: 1.2 MI N OF JCT NM-555 (Lat: 36.879383,  Lng: -104.468050),  Route carried "on" structure: County highway 7020,  Year Built: 1940,  Status: Posted for load,  Structure Length: 2.68m (8.79ft),  Average Daily Traffic: 109 (year 2020),  Average Future Daily Traffic: 181 (year 2040),  Features Intersected: UNNAMED WATERWAY,  Facility Carried by Structure: 07-A020
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.002,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 6.8m (22.3ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Critical,  Channel: Satisfactory,  Operating Rating: 14.5 metric tons,  Method Used To Determine Operating Rating: No rating analysis performed,  Inventory Rating: 9.1 metric tons,  Method Used To Determine Inventory Rating: No rating analysis performed,  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.68m (8.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $78,000,  Roadway Improvement Cost: $7,000,  Total Project Cost: $118,000 ( Estimate for 2020),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8479,  Location: 1.3 MI W OF JCT LOOP-17 (Lat: 36.861600,  Lng: -104.461139),  Route carried "on" structure: State highway 555,  Year Built: 1985,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 1,701 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 3,182 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: DILLON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.198,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 71.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2019
Find on map >>   Show street view

Structure Number: 8498,  Location: 0.6 MI N STEVEN ST/RATON (Lat: 36.920939,  Lng: -104.420783),  Route carried "on" structure: County highway 7047,  Year Built: 1986,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 109 (year 2020),  Average Future Daily Traffic: 181 (year 2040),  Design Load: HS 20,  Features Intersected: UNNAMED WATERWAY,  Facility Carried by Structure: 07-A047
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.002,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 47.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2019
Find on map >>   Show street view

Structure Number: 8838,  Location: 3.7 MI N RATON S INTERCHG (Lat: 36.916019,  Lng: -104.447264),  Route carried "on" structure: US 17,  Year Built: 1993,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 9.14m (29.99ft),  Average Daily Traffic: 5,318 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 4,104 (year 2040),  Design Load: HS 20,  Features Intersected: BNSF R/R, Raton Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.280,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 16,  Length of Maximum Span: 30.8m (101.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.14m (29.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $632,000,  Roadway Improvement Cost: $63,000,  Total Project Cost: $948,000 ( Estimate for 2030),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 8839,  Location: NORTH RATON INTCHANGE (Lat: 36.917742,  Lng: -104.446194),  Route carried "on" structure: Interstate 25,  Year Built: 1993,  Status: Open,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 8,839 (year 2020),  Truck Traffic: 37%,  Average Future Daily Traffic: 15,131 (year 2040),  Design Load: HS 20,  Features Intersected: LOOP-17
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 731.749,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.7m (81.0ft),  Curb-To-Curb Width: 11.8m (38.7ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 73.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 884,  Location: NORTH RATON INTERCHANGE (Lat: 36.918103,  Lng: -104.445900),  Route carried "on" structure: Interstate 25,  Year Built: 1993,  Status: Open,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 9,940 (year 2020),  Truck Traffic: 37%,  Average Future Daily Traffic: 17,017 (year 2040),  Design Load: HS 20,  Features Intersected: LOOP-17
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 731.749,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.7m (81.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 73.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 8971,  Location: 0.5 MI S OF NM-72 (Lat: 36.894181,  Lng: -104.426422),  Route carried "on" structure: City street 7000,  Year Built: 1995,  Status: Posted for load-capacity,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 106 (year 2020),  Average Future Daily Traffic: 176 (year 2040),  Design Load: HS 20,  Features Intersected: RATON CREEK,  Facility Carried by Structure: 07-Z000
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Steel,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.1m (88.9ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 71.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9352,  Location: 3.2 MI E OF i-25 AT RATON (Lat: 36.868508,  Lng: -104.379953),  Route carried "on" structure: US 64,  Year Built: 2008,  Status: Open,  Structure Length: 5.82m (19.09ft),  Average Daily Traffic: 3,198 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 2,468 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: CHICO RICO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 567.202,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 29.6m (97.1ft),  Curb-To-Curb Width: 17.6m (57.7ft),  Out-to-Out Width: 18.6m (61.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 10065,  Location: 0.4 MI S OF NM-72 (Lat: 36.899433,  Lng: -104.432281),  Route carried "on" structure: City street 5655,  Year Built: 1993,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 1,302 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,122 (year 2040),  Design Load: HS 20,  Features Intersected: RATON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.117,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.2m (0.7ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 43.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2021
Find on map >>   Show street view

Structure Number: 101,  Location: 1.0 MI E OF LOOP-17/RATON (Lat: 36.899689,  Lng: -104.407342),  Route carried "on" structure: State highway 72,  Year Built: 1995,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 655 (year 2020),  Truck Traffic: 21%,  Average Future Daily Traffic: 563 (year 2040),  Design Load: HS 20,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.606,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 58.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2021
Find on map >>   Show street view

Structure Number: 5445,  Location: 0.1 MI E OF JCT LOOP-17 (Lat: 36.905567,  Lng: -104.438281),  Route carried "under" structure: City street 5652,  Year Built: 1940,  Structure Length: 0. m,  Average Daily Traffic: 1,546 (year 2020),  Truck Traffic: 7%,  Features Intersected: NM-72,  Facility Carried by Structure: FL-5656
Minimum Vertical Clearance: 4.32m (14.17ft),  Kilometerpoint: 0.122,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.9m (48.9ft)

Find on map >>   Show street view

Structure Number: 5492,  Location: 1.7 MI N OF JCT I-25 (Lat: 36.891406,  Lng: -104.441311),  Route carried "under" structure: US 17,  Year Built: 1934,  Structure Length: 0. m,  Average Daily Traffic: 8,452 (year 2020),  Truck Traffic: 7%,  Features Intersected: Loop-17,  Facility Carried by Structure: RAILROAD
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 3.312,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 12.5m (41.0ft)

Find on map >>   Show street view

Structure Number: 6106,  Location: SOUTH INTERCHANGE/RATON (Lat: 36.864736,  Lng: -104.439158),  Route carried "under" structure: US 17,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 816 (year 2020),  Truck Traffic: 16%,  Features Intersected: US 64/LOOP-17,  Facility Carried by Structure: I-25 NBL
Minimum Vertical Clearance: 5.46m (17.91ft),  Kilometerpoint: 0.080,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.3m (73.2ft)

Find on map >>   Show street view

Structure Number: 6107,  Location: SOUTH INTERCHANGE/RATON (Lat: 36.864944,  Lng: -104.439292),  Route carried "under" structure: US 17,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 816 (year 2020),  Truck Traffic: 16%,  Features Intersected: US 64/LOOP-17,  Facility Carried by Structure: I-25 SBL
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 0.080,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.3m (73.2ft)

Find on map >>   Show street view

Structure Number: 6108,  Location: Junction I-25/US-64/87 (Lat: 36.885017,  Lng: -104.431028),  Route carried "under" structure: Interstate 25,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 4,436 (year 2020),  Truck Traffic: 51%,  Features Intersected: I-25 NBL/SBL,  Facility Carried by Structure: US-64 WBL
Minimum Vertical Clearance: 4.94m (16.21ft),  Kilometerpoint: 726.886,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.6m (70.9ft)

Find on map >>   Show street view

Structure Number: 6109,  Location: Junction I-25/US-64/87 (Lat: 36.884806,  Lng: -104.431086),  Route carried "under" structure: Interstate 25,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 4,436 (year 2020),  Truck Traffic: 51%,  Features Intersected: I-25 NBL/SBL,  Facility Carried by Structure: US-64 EBL
Minimum Vertical Clearance: 5.09m (16.70ft),  Kilometerpoint: 726.886,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.6m (70.9ft)

Find on map >>   Show street view

Structure Number: 611,  Location: 0.5 MI N OF S RATON INTER (Lat: 36.870456,  Lng: -104.436933),  Route carried "under" structure: Interstate 25,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 4,071 (year 2020),  Truck Traffic: 37%,  Features Intersected: I-25 NBL/SBL,  Facility Carried by Structure: FL-5650
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 725.067,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.8m (55.1ft)

Find on map >>   Show street view

Structure Number: 6209,  Location: 1.0 MI N OF JCT US-64/87 (Lat: 36.900328,  Lng: -104.424864),  Route carried "under" structure: Interstate 25,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 8,643 (year 2020),  Truck Traffic: 51%,  Features Intersected: I-25 NBL/SBL,  Facility Carried by Structure: NM-72
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 728.590,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.7m (58.1ft)

Find on map >>   Show street view

Structure Number: 621,  Location: 2.2 MI N OF JCT US-64/87 (Lat: 36.912503,  Lng: -104.430564),  Route carried "under" structure: City street 5667,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 106 (year 2020),  Features Intersected: LINCOLN AVENUE (RATON),  Facility Carried by Structure: I-25 NBL
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 0.396,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.5m (54.1ft)

Find on map >>   Show street view

Structure Number: 6211,  Location: 2.2 MI N OF JCT US-64/87 (Lat: 36.912342,  Lng: -104.430625),  Route carried "under" structure: City street 5667,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 106 (year 2020),  Features Intersected: LINCOLN AVENUE,  Facility Carried by Structure: I-25 SBL
Minimum Vertical Clearance: 5.82m (19.09ft),  Kilometerpoint: 0.386,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.5m (54.1ft)

Find on map >>   Show street view

Structure Number: 6212,  Location: 2.4 MI N OF JCT US-64/87 (Lat: 36.913489,  Lng: -104.434575),  Route carried "under" structure: Interstate 25,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 9,945 (year 2020),  Truck Traffic: 51%,  Features Intersected: I-25 NBL/SBL,  Facility Carried by Structure: FL-5656
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 732.091,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.1m (56.1ft)

Find on map >>   Show street view

Structure Number: 6929,  Location: 3.2 Mi S Loop-17/Raton S (Lat: 36.818025,  Lng: -104.443272),  Route carried "under" structure: Interstate 25,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 7,052 (year 2020),  Truck Traffic: 37%,  Features Intersected: I-25 NBL/SBL,  Facility Carried by Structure: US-64
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 719.180,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 7663,  Location: 0.1 MI E OF JCT LOOP-17 (Lat: 36.905722,  Lng: -104.438067),  Route carried "under" structure: State highway 72,  Year Built: 1947,  Structure Length: 0. m,  Average Daily Traffic: 1,546 (year 2020),  Truck Traffic: 7%,  Features Intersected: NM-72,  Facility Carried by Structure: RAILROAD
Minimum Vertical Clearance: 4.34m (14.24ft),  Kilometerpoint: 0.061,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 11.6m (38.1ft)

Find on map >>   Show street view

Structure Number: 8839,  Location: NORTH RATON INTCHANGE (Lat: 36.917742,  Lng: -104.446194),  Route carried "under" structure: US 17,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 5,318 (year 2020),  Truck Traffic: 16%,  Features Intersected: LOOP-17,  Facility Carried by Structure: I-25 SBL
Minimum Vertical Clearance: 5.24m (17.19ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.7m (81.0ft)

Find on map >>   Show street view

Structure Number: 884,  Location: NORTH RATON INTERCHANGE (Lat: 36.918103,  Lng: -104.445900),  Route carried "under" structure: US 17,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 489 (year 2020),  Truck Traffic: 16%,  Features Intersected: LOOP-17,  Facility Carried by Structure: I-25 NBL
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 6.598,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.7m (81.0ft)

Discuss Raton, New Mexico (NM) on our hugely popular New Mexico forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.