Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Plainview, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 14Number of bridges
  • 72ft / 21.8mTotal length
  • $45,107,000Total costs
  • 609,646Total average daily traffic
  • 22,886Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Plainview
  • No street view available for this location

New bridges in Plainview, NY - historical statistics
  • New bridges - historical statistics
  • 81960-1969
  • 61990-1999
Average Bridge Daily Traffic in Plainview, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 16.7%Good
  • 83.3%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 14.3%Excellent
  • 42.9%Good
  • 42.9%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 14.3%Very good
  • 42.9%Good
  • 28.6%Satisfactory
  • 14.3%Fair
Find on map >>   Show street view

Structure Number: 1037909,  Location: 1.4 MI S JCT SH 135 & SSP (Lat: 40.761919,  Lng: -73.476767),  Route carried "on" structure: State highway 135,  Year Built: 1963,  Status: Open,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 86,041 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 102,345 (year 2040),  Design Load: H 20,  Features Intersected: HAY PATH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.247,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 29.9m (98.1ft),  Skew: 23 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.3m (56.8ft),  Curb-To-Curb Width: 29.7m (97.4ft),  Out-to-Out Width: 32.1m (105.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.92m (6.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $5,447,000,  Roadway Improvement Cost: $3,190,000,  Total Project Cost: $8,636,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 103791,  Location: .5 MI S JCT RTE 135+SSP (Lat: 40.773794,  Lng: -73.481275),  Route carried "on" structure: Other road ,  Year Built: 1962,  Status: Open,  Structure Length: 3.44m (11.29ft),  Average Daily Traffic: 22,563 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 27,409 (year 2040),  Design Load: H 20,  Features Intersected: 135 135 03011089, RTE 13,  Facility Carried by Structure: OLD COUNTRY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.883,  Lanes on structure: 4,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 16.4m (53.8ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 18.9m (62.0ft),  Out-to-Out Width: 23.1m (75.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.44m (11.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $4,573,000,  Roadway Improvement Cost: $2,678,000,  Total Project Cost: $7,251,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 103792,  Location: JCT SH 135 & SSP (Lat: 40.781728,  Lng: -73.482908),  Route carried "on" structure: Other road ,  Year Built: 1962,  Status: Open,  Structure Length: 3.44m (11.29ft),  Average Daily Traffic: 7,761 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 9,602 (year 2040),  Design Load: H 20,  Features Intersected: 135 135 03011095 SB, RTE,  Facility Carried by Structure: SOUTHERN PARKWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.547,  Lanes on structure: 3,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 16.4m (53.8ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.4m (53.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.44m (11.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $3,208,000,  Roadway Improvement Cost: $1,879,000,  Total Project Cost: $5,087,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 104925,  Location: .4 MI SE JCT NSP & I495 (Lat: 40.795539,  Lng: -73.468181),  Route carried "on" structure: City street ,  Year Built: 1996,  Status: Open,  Structure Length: 4.94m (16.21ft),  Average Daily Traffic: 7,108 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 8,634 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: 495I495I0302114, RTE I49,  Facility Carried by Structure: SUNNYSIDE BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 6,  Lanes under structure: 9,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 25.9m (85.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 21.3m (69.9ft),  Out-to-Out Width: 25.0m (82.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.93m (16.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $4,720,000,  Roadway Improvement Cost: $2,764,000,  Total Project Cost: $7,484,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1049279,  Location: 1.2 MI SE JCT NSP+RTE 495 (Lat: 40.789461,  Lng: -73.455564),  Route carried "on" structure: Interstate 495,  Year Built: 1963,  Status: Open,  Structure Length: 2.47m (8.10ft),  Average Daily Traffic: 147,224 (year 2018),  Truck Traffic: 11%,  Average Future Daily Traffic: 154,585 (year 2040),  Design Load: HS 20,  Features Intersected: WASHINGTON AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.264,  Lanes on structure: 8,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 42.4m (139.1ft),  Skew: 21 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.3m (79.7ft),  Curb-To-Curb Width: 42.3m (138.8ft),  Out-to-Out Width: 44.1m (144.7ft)

Condition: Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 90.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.46m (8.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $7,056,000,  Roadway Improvement Cost: $4,132,000,  Total Project Cost: $11,188,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Other
Find on map >>   Show street view

Structure Number: 105724,  Location: 1.2 MI E JCT NSP & I495 (Lat: 40.789792,  Lng: -73.455469),  Route carried "on" structure: ServiceState highway 906B,  Year Built: 1997,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 4,957 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 5,719 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: WASHINGTON AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.965,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Satisfactory,  Superstructure: Excellent,  Substructure: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.83m (9.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,744,000,  Roadway Improvement Cost: $1,021,000,  Total Project Cost: $2,766,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 105725,  Location: 1.2 MI SE JCT NSP & I495 (Lat: 40.788764,  Lng: -73.455889),  Route carried "on" structure: ServiceState highway 906A,  Year Built: 1997,  Status: Open,  Structure Length: 2.77m (9.09ft),  Average Daily Traffic: 8,028 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 9,262 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: WASHINGTON AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.264,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.8m (87.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 72.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.77m (9.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,700,000,  Roadway Improvement Cost: $995,000,  Total Project Cost: $2,695,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1037909,  Location: 1.4 MI S JCT SH 135 & SSP (Lat: 40.761919,  Lng: -73.476767),  Route carried "under" structure: Other road ,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 7,800 (year 2021),  Features Intersected: HAY PATH ROAD,  Facility Carried by Structure: RTE 135
Minimum Vertical Clearance: 4.55m (14.93ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.3m (56.8ft)

Find on map >>   Show street view

Structure Number: 103791,  Location: .5 MI S JCT RTE 135+SSP (Lat: 40.773794,  Lng: -73.481275),  Route carried "under" structure: State highway 135,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 93,032 (year 2002),  Features Intersected: 135 135 03011089, RTE 13,  Facility Carried by Structure: OLD COUNTRY ROAD
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 12.969,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.4m (53.8ft)

Find on map >>   Show street view

Structure Number: 103792,  Location: JCT SH 135 & SSP (Lat: 40.781728,  Lng: -73.482908),  Route carried "under" structure: State highway 135,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 93,032 (year 2002),  Features Intersected: 135 135 03011095 SB, RTE,  Facility Carried by Structure: SOUTHERN PARKWAY
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 13.837,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.4m (53.8ft)

Find on map >>   Show street view

Structure Number: 104925,  Location: .4 MI SE JCT NSP & I495 (Lat: 40.795539,  Lng: -73.468181),  Route carried "under" structure: Interstate 495,  Year Built: 1996,  Structure Length: 0. m,  Average Daily Traffic: 120,100 (year 2021),  Features Intersected: 495I495I0302114, RTE I49,  Facility Carried by Structure: SUNNYSIDE BLVD
Minimum Vertical Clearance: 4.75m (15.58ft),  Kilometerpoint: 22.960,  Lanes on structure: 6,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>   Show street view

Structure Number: 1049279,  Location: 1.2 MI SE JCT NSP+RTE 495 (Lat: 40.789461,  Lng: -73.455564),  Route carried "under" structure: Other road ,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 4,000 (year 1976),  Features Intersected: WASHINGTON AVENUE,  Facility Carried by Structure: RTE I495
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 24.3m (79.7ft)

Find on map >>   Show street view

Structure Number: 105724,  Location: 1.2 MI E JCT NSP & I495 (Lat: 40.789792,  Lng: -73.455469),  Route carried "under" structure: Other road ,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 4,000 (year 2021),  Features Intersected: WASHINGTON AVENUE,  Facility Carried by Structure: RTE 906B
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: 105725,  Location: 1.2 MI SE JCT NSP & I495 (Lat: 40.788764,  Lng: -73.455889),  Route carried "under" structure: Other road ,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 4,000 (year 1990),  Features Intersected: WASHINGTON AVENUE,  Facility Carried by Structure: RTE 906A
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 26.8m (87.9ft)

Discuss Plainview, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.