Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Agawam, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 16Number of bridges
  • 400ft / 122mTotal length
  • $131,054,000Total costs
  • 598,679Total average daily traffic
  • 80,732Total average daily truck traffic
  • 607,179Total future (year 2031) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Agawam
  • No street view available for this location

New bridges in Agawam, MA - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 61950-1959
  • 21960-1969
  • 11970-1979
  • 41990-1999
  • 22000-2009
Reconstructed bridges in Agawam, MA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 01960-1969
  • 01970-1979
  • 01980-1989
  • 11990-1999
  • 12000-2009
Average Bridge Daily Traffic in Agawam, MA
Average Bridge Truck Traffic in Agawam, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 43.8%Good
  • 25.0%Satisfactory
  • 25.0%Fair
  • 6.3%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 37.5%Good
  • 43.8%Satisfactory
  • 18.8%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 25.0%Good
  • 31.3%Satisfactory
  • 43.8%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 50.0%Good
  • 25.0%Satisfactory
  • 25.0%Fair
Find on map >>   Show street view

Structure Number: A050010W6DOTNBI,  Location: SOUTH END BRIDGE (Lat: 42.081422,  Lng: -72.583153),  Route carried "on" structure: US 5,  Year Built: 1954,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 44.47m (145.90ft),  Average Daily Traffic: 54,220 (year 2015),  Truck Traffic: 10%,  Average Future Daily Traffic: 79,913 (year 2031),  Design Load: HS 20,  Features Intersected: COMB AMTRAK & CONN RIV
Minimum Vertical Clearance: 5.31m (17.42ft),  Kilometerpoint: 6.698,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 30 degrees,  Navigation Control: Yes ( Vertical Clearance: 9.7m (31.8ft), Horizontal Clearance: 83.8m (274.9ft)),  Material/Design: Steel,  Design/Construction: Truss - Deck,  Number Of Spans In Main Unit: 7,  Number Of Approach Spans: 2,  Length of Maximum Span: 91.4m (299.9ft),  Curb or Sidewalk Widths: Left: 1.0m (3.3ft),  Right: 2.2m (7.2ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 21.9m (71.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 54.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 44.50m (146.00ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: October 2020,  Critical Feature Inspection Date: October 2020,  Underwater Inspection Date: August 2019,  Bridge Improvement Cost: $38,281,000,  Roadway Improvement Cost: $3,829,000,  Total Project Cost: $57,422,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: A050010W7DOTNBI,  Location: JCT US 5 & RIVER RD. (Lat: 42.081003,  Lng: -72.585539),  Route carried "on" structure: US 5,  Year Built: 1953,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 3.89m (12.76ft),  Average Daily Traffic: 30,259 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 93,968 (year 2031),  Design Load: HS 20,  Features Intersected: HWY RIVER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.242,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 23.4m (76.8ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 21.9m (71.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.90m (12.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $3,355,000,  Roadway Improvement Cost: $336,000,  Total Project Cost: $5,033,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: A050030KXMUNNBI,  Location: BRIDGE ST AT WESTFIELD RV (Lat: 42.099381,  Lng: -72.636225),  Route carried "on" structure: City street ,  Year Built: 1970,  Status: Open,  Structure Length: 9.81m (32.19ft),  Average Daily Traffic: 14,800 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 16,745 (year 2032),  Design Load: H 20,  Features Intersected: WATER WESTFIELD RIVER,  Facility Carried by Structure: HWY BRIDGE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.579,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 48.8m (160.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.1m (52.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 56.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.90m (32.48ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: July 2021,  Underwater Inspection Date: July 2020,  Bridge Improvement Cost: $6,261,000,  Roadway Improvement Cost: $627,000,  Total Project Cost: $9,392,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: A050090U1DOTNBI,  Location: .75 MI N OF CONNECT LINE (Lat: 42.041894,  Lng: -72.616369),  Route carried "on" structure: State highway 159,  Year Built: 1911,  Year Reconstructed: 1950,  Status: Open,  Structure Length: 0.90m (2.95ft),  Average Daily Traffic: 8,664 (year 2015),  Truck Traffic: 10%,  Average Future Daily Traffic: 21,163 (year 2032),  Features Intersected: WATER WORTHINGTON BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 12.6m (41.3ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 0.0m,  Curb-To-Curb Width: 12.6m (41.3ft),  Out-to-Out Width: 18.2m (59.7ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 72.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $715,000,  Roadway Improvement Cost: $72,000,  Total Project Cost: $1,073,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: A050110WADOTNBI,  Location: US 5 AT WESTFIELD RIVER (Lat: 42.083678,  Lng: -72.591517),  Route carried "on" structure: US 5,  Year Built: 1953,  Status: Open,  Structure Length: 17.81m (58.43ft),  Average Daily Traffic: 30,366 (year 2017),  Truck Traffic: 3%,  Average Future Daily Traffic: 47,537 (year 2031),  Design Load: H 20,  Features Intersected: WATER WESTFIELD RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.950,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 85.3m (279.9ft),  Curb or Sidewalk Widths: Left: 1.0m (3.3ft),  Right: 1.0m (3.3ft),  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 25.3m (83.0ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 40.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 36.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 17.90m (58.73ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2020,  Critical Feature Inspection Date: October 2020,  Underwater Inspection Date: May 2019,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $17,789,000,  Roadway Improvement Cost: $1,779,000,  Total Project Cost: $26,684,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: A050130W9DOTNBI,  Location: .1 MI SE OF WESTFIELD RIV (Lat: 42.081367,  Lng: -72.590600),  Route carried "on" structure: US 5,  Year Built: 1953,  Status: Open,  Structure Length: 4.02m (13.19ft),  Average Daily Traffic: 36,983 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 28,743 (year 2032),  Design Load: HS 20,  Features Intersected: ST 57 W TRAFFIC CIR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.725,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.6m (67.6ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 20.3m (66.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 44.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.10m (13.45ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $3,270,000,  Roadway Improvement Cost: $328,000,  Total Project Cost: $4,906,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: A050140W8DOTNBI,  Location: .25 MI SE OF WESTFIELD RV (Lat: 42.080608,  Lng: -72.588875),  Route carried "on" structure: US 5,  Year Built: 1953,  Status: Open,  Structure Length: 4.11m (13.48ft),  Average Daily Traffic: 36,983 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 38,851 (year 2032),  Design Load: HS 20,  Features Intersected: ST 57 E TRAFFIC CIR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.564,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.4m (66.9ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 20.3m (66.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 46.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.20m (13.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $3,350,000,  Roadway Improvement Cost: $336,000,  Total Project Cost: $5,026,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: A050150WBDOTNBI,  Location: .09 MI S OF W SPRINGFIELD (Lat: 42.091286,  Lng: -72.592192),  Route carried "on" structure: US 5,  Year Built: 1953,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 289,666 (year 2016),  Truck Traffic: 20%,  Average Future Daily Traffic: 48,958 (year 2032),  Design Load: H 20,  Features Intersected: HWY ACCESS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.851,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 23.2m (76.1ft),  Out-to-Out Width: 24.7m (81.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 45.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $971,000,  Roadway Improvement Cost: $98,000,  Total Project Cost: $1,457,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: A05017AJUDOTNBI,  Location: 4.75 MI E OF SOUTHWICK (Lat: 42.075800,  Lng: -72.614589),  Route carried "on" structure: State highway 57,  Year Built: 2002,  Status: Open,  Structure Length: 5.12m (16.80ft),  Average Daily Traffic: 16,427 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 65,857 (year 2031),  Design Load: HS 20,  Features Intersected: ST159 MAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 67.912,  Lanes on structure: 3,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 13.6m (44.6ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 25.5m (83.7ft),  Curb-To-Curb Width: 13.6m (44.6ft),  Out-to-Out Width: 14.7m (48.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 72.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.20m (17.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,354,000,  Roadway Improvement Cost: $236,000,  Total Project Cost: $3,532,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: A05017AKDDOTNBI,  Location: 4.75 MI E OF SOUTHWICK (Lat: 42.075569,  Lng: -72.614583),  Route carried "on" structure: State highway 57,  Year Built: 2002,  Status: Open,  Structure Length: 5.12m (16.80ft),  Average Daily Traffic: 13,707 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 65,857 (year 2031),  Design Load: HS 20,  Features Intersected: ST159 MAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 67.912,  Lanes on structure: 3,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 13.6m (44.6ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 25.5m (83.7ft),  Curb-To-Curb Width: 13.6m (44.6ft),  Out-to-Out Width: 14.7m (48.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 72.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.20m (17.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,354,000,  Roadway Improvement Cost: $236,000,  Total Project Cost: $3,532,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: A0502111TDOTNBI,  Location: MM 43.0 ON ST 57 WB (Lat: 42.074028,  Lng: -72.630586),  Route carried "on" structure: State highway 57,  Year Built: 1961,  Status: Open,  Structure Length: 5.03m (16.50ft),  Average Daily Traffic: 16,422 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 17,214 (year 2032),  Design Load: H 20,  Features Intersected: ST 75 SUFFIELD ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 66.625,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 28.7m (94.2ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.7m (48.2ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 17.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.10m (16.73ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,945,000,  Roadway Improvement Cost: $295,000,  Total Project Cost: $4,418,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: A0502111UDOTNBI,  Location: MM 43.0 ON ST 57 EB (Lat: 42.073806,  Lng: -72.630617),  Route carried "on" structure: State highway 57,  Year Built: 1961,  Status: Open,  Structure Length: 5.03m (16.50ft),  Average Daily Traffic: 13,707 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 34,981 (year 2032),  Design Load: H 20,  Features Intersected: ST 75 SUFFIELD ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 66.625,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 28.7m (94.2ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.7m (48.2ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 39.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 17.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.10m (16.73ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,945,000,  Roadway Improvement Cost: $295,000,  Total Project Cost: $4,418,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: A05022AD5DOTNBI,  Location: MM 42.5 ON ST 57 (Lat: 42.070889,  Lng: -72.640833),  Route carried "on" structure: City street ,  Year Built: 1991,  Status: Open,  Structure Length: 5.57m (18.27ft),  Average Daily Traffic: 8,147 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 8,576 (year 2033),  Design Load: HS 20,  Features Intersected: ST 57,  Facility Carried by Structure: HWY MILL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.893,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 27.2m (89.2ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 62.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.60m (18.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $1,268,000,  Roadway Improvement Cost: $127,000,  Total Project Cost: $1,903,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: A05023ABDDOTNBI,  Location: .4 M SE POPLAR ST (Lat: 42.063000,  Lng: -72.657506),  Route carried "on" structure: City street ,  Year Built: 1991,  Status: Open,  Structure Length: 5.17m (16.96ft),  Average Daily Traffic: 6,078 (year 2016),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,677 (year 2032),  Design Load: HS 20,  Features Intersected: ST 57,  Facility Carried by Structure: HWY GARDEN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.603,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 25.1m (82.3ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 61.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.20m (17.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,177,000,  Roadway Improvement Cost: $118,000,  Total Project Cost: $1,766,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: A05024AD4DOTNBI,  Location: MM 40.9 ON ST 57 EB (Lat: 42.057408,  Lng: -72.665969),  Route carried "on" structure: State highway 57,  Year Built: 1991,  Status: Open,  Structure Length: 2.38m (7.81ft),  Average Daily Traffic: 13,800 (year 2006),  Truck Traffic: 6%,  Average Future Daily Traffic: 21,794 (year 2033),  Design Load: HS 20,  Features Intersected: HWY SHOEMAKER LN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 64.261,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.2m (76.1ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 60.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $261,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $392,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: A05024AD6DOTNBI,  Location: .5 MI E. JCT. 57 & ST 187 (Lat: 42.057572,  Lng: -72.666111),  Route carried "on" structure: State highway 57,  Year Built: 1991,  Status: Open,  Structure Length: 2.38m (7.81ft),  Average Daily Traffic: 8,450 (year 2004),  Truck Traffic: 6%,  Average Future Daily Traffic: 13,345 (year 2033),  Design Load: HS 20,  Features Intersected: HWY SHOEMAKER LN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 64.261,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.2m (76.1ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 60.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $66,000,  Roadway Improvement Cost: $7,000,  Total Project Cost: $100,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Discuss Agawam, Massachusetts (MA) on our hugely popular Massachusetts forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.