Inspection findings | Inspection date | Type | |
---|---|---|---|
No violation noted during this evaluation. | 08/27/2015 | Risk Factor | |
No violation noted during this evaluation. | 04/23/2014 | Risk Factor | |
Counter top at the drink station has been properly repaired. No violation noted during this evaluation. | 08/29/2013 | Risk Factor | |
The counter top at the Coke beverage machine needs to be replaced for safety reasons. The crack is sharp and could cut customers. The health permit can be issued. All cold holding equipment is working correctly and hold food at proper temperatures. **The build needs to be finalized with the Building Department, Fire Marshal, and Planning and Zoning before opening for business. Verify with all departments before opening to the public.** A routine inspection will be done around 30 days from the date of opening. No violation noted during this evaluation. | 05/15/2013 | Pre-Opening | |
Facility was not ready for final. Still trying for temporary with building dept. so owner unable to occupy for training or stock food. Will meet next week for final if temporary is able to be issued. Provide "Employee Must Wash Hands" signs in bathrooms. (Done) - Provide "Hand Washing" signs at all hand sinks. (Done) - Make sure ice machines have back flow devices install on the intake water line or the machines have built-in devices for back flow. (Still working, damaged counter top) - Finish tile/grout work around the floor sink under the fryers. (Done) - Patch and fill in holes in the wall panels where tubes or wires were placed. (Done) - Provide a way for mops to hang and dry properly. (Done) - Stock all soap and towel dispensers. (Done) - The final inspection will require all small-wares in place (thermometers, food service gloves, etc...) No violation noted during this evaluation. | 05/10/2013 | Pre-Opening | |
-Provide "Employee Must Wash Hands" signs in bathrooms -Provide "Hand Washing" signs at all hand sinks - Make sure ice machines have back flow devices install on the intake water line or the machines have built-in devices for back flow - Finish tile/grout work around the floor sink under the fryers. - Patch and fill in holes in the wall panels where tubes or wires were placed. - Provide a way for mops to hang and dry properly. - Stock all soap and towel dispensers - The final inspection will require all small-wares in place (thermometers, food service gloves, etc...) No violation noted during this evaluation. | 05/06/2013 | Pre-Opening |
Name | City | Users' Rating |
---|---|---|
McDonald's Restaurant | Winchester, VA | |
Ruritan Food Stand at Fort Shenandoah | Winchester, VA | |
Subway | Winchester, VA | |
Metro Pizzeria | Winchester, VA | |
Starbucks Coffee #10417 | Winchester, VA | |
Mr. Noodle & Rice | Winchester, VA | |
Winchester Sonic, LLC | Winchester, VA | |
McDonald's 31299 | Winchester, VA | |
Burger King #1602 (01-1464) | Virginia Beach, VA | |
Hardee's #2341 | Roanoke, VA |
Name |
---|
China Garden |
The Growing Patch |
Little Caesars |
Jimmy John's |
McDonald's Restaurant |
China Dragon |
Donato's Touch of Italy |
Kentucky Fried Chicken |
Restaurant representatives - add corrected or new information about Popeye's Chicken, 117 Sunnyside Plaza Dr., Winchester, VA 22603 »