Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Norwood, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 23Number of bridges
  • 167ft / 51.5mTotal length
  • $42,292,000Total costs
  • 726,045Total average daily traffic
  • 30,952Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Norwood
  • No street view available for this location

New bridges in Norwood, MA - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 11910-1919
  • 11930-1939
  • 31950-1959
  • 131960-1969
  • 11970-1979
  • 21980-1989
  • 12010-2019
Reconstructed bridges in Norwood, MA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11920-1929
  • 01930-1939
  • 01940-1949
  • 11950-1959
  • 01960-1969
  • 01970-1979
  • 01980-1989
  • 01990-1999
  • 32000-2009
Average Bridge Daily Traffic in Norwood, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 5.9%Very good
  • 23.5%Good
  • 29.4%Satisfactory
  • 41.2%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 5.6%Very good
  • 33.3%Good
  • 33.3%Satisfactory
  • 27.8%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 16.7%Very good
  • 38.9%Good
  • 33.3%Satisfactory
  • 11.1%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 63.6%Good
  • 9.1%Satisfactory
  • 9.1%Fair
  • 9.1%Poor
  • 9.1%Serious
Find on map >>   Show street view

Structure Number: N250023JQMUNNBI,  Location: .2 MI SO OF DEAN STREET (Lat: 42.177389,  Lng: -71.200311),  Route carried "on" structure: City street ,  Year Built: 1971,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 12,672 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 26,848 (year 2032),  Design Load: H 20,  Features Intersected: WATER NEPONSET RIVER,  Facility Carried by Structure: HWY PLEASANT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.658,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Fair,  Operating Rating: 73.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 37.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $647,000,  Roadway Improvement Cost: $65,000,  Total Project Cost: $971,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: N25003AYVMUNNBI,  Location: .1 MI W OF PLEASANT ST (Lat: 42.172964,  Lng: -71.204789),  Route carried "on" structure: City street ,  Year Built: 2010,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 8,500 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 13,424 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: WATER NEPONSET RIVER,  Facility Carried by Structure: HWY MORSE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.515,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.3m (40.4ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 87.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $896,000,  Roadway Improvement Cost: $90,000,  Total Project Cost: $1,345,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: N250143PPDOTNBI,  Location: .1 MI S OF UNIVERSITY AVE (Lat: 42.209092,  Lng: -71.184678),  Route carried "on" structure: US 1,  Year Built: 1932,  Year Reconstructed: 1956,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 50,000 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 59,382 (year 2033),  Design Load: H 20,  Features Intersected: WATER PURGATORY BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 39.360,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 23 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Serious,  Culverts: Good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.20m (0.66ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: January 2022,  Underwater Inspection Date: July 2021,  Bridge Improvement Cost: $118,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $178,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: N250173JPMUNNBI,  Location: .5 MI NE OF WALPOLE (Lat: 42.173972,  Lng: -71.208100),  Route carried "on" structure: City street ,  Year Built: 1967,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 20,600 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 31,586 (year 2032),  Design Load: HS 20,  Features Intersected: WATER HAWES BROOK,  Facility Carried by Structure: HWY WASHNGTON ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb or Sidewalk Widths: Left: 2.7m (8.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 84.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 51.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $791,000,  Roadway Improvement Cost: $80,000,  Total Project Cost: $1,187,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: N250223VVDOTNBI,  Location: SOUTH BRIDGE (Lat: 42.187569,  Lng: -71.184700),  Route carried "on" structure: City street ,  Year Built: 1956,  Year Reconstructed: 2005,  Status: Open,  Structure Length: 5.06m (16.60ft),  Average Daily Traffic: 18,000 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 25,585 (year 2032),  Design Load: HS 20,  Features Intersected: US 1 PROVDNCE HWY,  Facility Carried by Structure: HWY PNDRGST C SO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 26.8m (87.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.7m (48.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.10m (16.73ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $578,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $868,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: N250233VWDOTNBI,  Location: NORTH BRIDGE (Lat: 42.188953,  Lng: -71.184394),  Route carried "on" structure: City street ,  Year Built: 1956,  Year Reconstructed: 2005,  Status: Open,  Structure Length: 4.91m (16.11ft),  Average Daily Traffic: 14,250 (year 2021),  Truck Traffic: 9%,  Average Future Daily Traffic: 25,585 (year 2032),  Design Load: HS 20,  Features Intersected: US 1 PROVDNCE HWY,  Facility Carried by Structure: HWY PNDRGST C NO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 26.8m (87.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.7m (48.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 79.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.00m (16.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $566,000,  Roadway Improvement Cost: $57,000,  Total Project Cost: $850,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: N250263PNDOTNBI,  Location: .25 MI S OF DEAN ST (Lat: 42.176953,  Lng: -71.191994),  Route carried "on" structure: US 1,  Year Built: 1960,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 45,258 (year 2022),  Truck Traffic: 9%,  Average Future Daily Traffic: 56,223 (year 2032),  Design Load: H 20,  Features Intersected: WATER NEPONSET RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.680,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Skew: 33 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.6m (61.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 21.3m (69.9ft),  Out-to-Out Width: 25.8m (84.6ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 50.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.00m (6.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $2,027,000,  Roadway Improvement Cost: $203,000,  Total Project Cost: $3,041,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: N250283R1DOTNBI,  Location: .3 MI N OF WALPOLE T.L. (Lat: 42.153381,  Lng: -71.190225),  Route carried "on" structure: Interstate 95,  Year Built: 1963,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 53,991 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 75,806 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: HWY UNION ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.600,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 17.2m (56.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.20m (10.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $574,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $862,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: N250283R2DOTNBI,  Location: .3 MI N OF WALPOLE T.L. (Lat: 42.153722,  Lng: -71.190525),  Route carried "on" structure: Interstate 95,  Year Built: 1963,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 56,741 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 75,806 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: HWY UNION ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.600,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 17.2m (56.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.20m (10.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $2,162,000,  Roadway Improvement Cost: $217,000,  Total Project Cost: $3,244,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: N250303VTDOTNBI,  Location: .6 MI N OF SHARON T.L. (Lat: 42.170942,  Lng: -71.170828),  Route carried "on" structure: City street ,  Year Built: 1963,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 25,200 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 62,066 (year 2032),  Design Load: H 20,  Features Intersected: I 95 NB,  Facility Carried by Structure: HWY NEPONSET ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.414,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.2m (76.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 23.8m (78.1ft),  Out-to-Out Width: 26.5m (86.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 76.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $2,603,000,  Roadway Improvement Cost: $261,000,  Total Project Cost: $3,905,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: N250303VUDOTNBI,  Location: .6 MI N OF SHARON T.L. (Lat: 42.171194,  Lng: -71.171278),  Route carried "on" structure: City street ,  Year Built: 1963,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 25,200 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 34,745 (year 2032),  Design Load: H 20,  Features Intersected: I 95 SB,  Facility Carried by Structure: HWY NEPONSET ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.414,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.2m (76.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 23.8m (78.1ft),  Out-to-Out Width: 26.5m (86.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 74.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $2,603,000,  Roadway Improvement Cost: $261,000,  Total Project Cost: $3,905,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: N250313R3DOTNBI,  Location: N. OF NEPONSET ST/95 (Lat: 42.175431,  Lng: -71.166731),  Route carried "on" structure: Interstate 95,  Year Built: 1963,  Status: Open,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 61,777 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 80,228 (year 2032),  Design Load: HS 20,  Features Intersected: WATER NEPONSET RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.055,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.2m (63.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 45.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.00m (13.12ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: October 2021,  Underwater Inspection Date: August 2019,  Bridge Improvement Cost: $2,782,000,  Roadway Improvement Cost: $279,000,  Total Project Cost: $4,174,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: N250313R4DOTNBI,  Location: N. OF NEPONSET ST/95 (Lat: 42.175889,  Lng: -71.167011),  Route carried "on" structure: Interstate 95,  Year Built: 1963,  Status: Open,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 63,800 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 80,228 (year 2032),  Design Load: HS 20,  Features Intersected: WATER NEPONSET RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.055,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.2m (63.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 46.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.00m (13.12ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: October 2021,  Underwater Inspection Date: August 2019,  Bridge Improvement Cost: $2,687,000,  Roadway Improvement Cost: $269,000,  Total Project Cost: $4,031,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: N2503240MDOT634,  Location: R 128 IND PRK LEAD MP QBL (Lat: 42.199333,  Lng: -71.158864),  Route carried "on" structure: City street ,  Year Built: 1966,  Status: Open,  Structure Length: 2.29m (7.51ft),  Average Daily Traffic: 12,100 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 19,425 (year 2033),  Design Load: H 20,  Features Intersected: RR CSX SPUR QBL 2.18,  Facility Carried by Structure: HWY CANTON ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 1.9m (6.2ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 17.9m (58.7ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 58.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.30m (7.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $777,000,  Roadway Improvement Cost: $78,000,  Total Project Cost: $1,166,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: W03010415DOT634,  Location: .2 MI SW OF ST 1A (Lat: 42.167144,  Lng: -71.225683),  Route carried "on" structure: City street ,  Year Built: 1985,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 6,000 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 22,110 (year 2033),  Design Load: HS 20,  Features Intersected: RR MBTA/CSX,  Facility Carried by Structure: HWY MYLOD ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.193,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 65.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $811,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $1,217,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W030223KBMUNNBI,  Location: .4 MI S OF NORWOOD (Lat: 42.162636,  Lng: -71.215353),  Route carried "on" structure: City street ,  Year Built: 1875,  Year Reconstructed: 1926,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 16,785 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 27,638 (year 2031),  Features Intersected: WATER NEPONSET RIVER,  Facility Carried by Structure: HWY WASHNGTON ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.435,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 1 degrees,  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.9m (16.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: August 2021,  Underwater Inspection Date: August 2020,  Bridge Improvement Cost: $665,000,  Roadway Improvement Cost: $67,000,  Total Project Cost: $998,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: W030313KGMUNNBI,  Location: .5 MI WEST OF RTE 1 (Lat: 42.157586,  Lng: -71.208906),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 5,500 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 12,634 (year 2032),  Design Load: H 20,  Features Intersected: WATER TRAPHOLE BROOK,  Facility Carried by Structure: HWY CONEY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.225,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Inventory Rating: 73.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $408,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $613,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W030333WLDOTNBI,  Location: .5 MI SE OF US 1 (Lat: 42.148156,  Lng: -71.200706),  Route carried "on" structure: City street ,  Year Built: 1963,  Status: Posted for load,  Structure Length: 8.63m (28.31ft),  Average Daily Traffic: 14,500 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 34,745 (year 2032),  Design Load: H 20,  Features Intersected: I 95,  Facility Carried by Structure: HWY CONEY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 23.8m (78.1ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 1.9m (6.2ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 17.2m (56.4ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 39.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 20.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.70m (28.54ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $5,878,000,  Roadway Improvement Cost: $588,000,  Total Project Cost: $8,818,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W030373KCMUNNBI,  Location: JCT W OF RTE 1A (Lat: 42.180394,  Lng: -71.232989),  Route carried "on" structure: City street ,  Year Built: 1911,  Year Reconstructed: 2007,  Status: Posted for load,  Structure Length: 1.05m (3.44ft),  Average Daily Traffic: 7,371 (year 2022),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,738 (year 2033),  Design Load: HS 20,  Features Intersected: WATER WILLETT POND OTLT,  Facility Carried by Structure: HWY BULLARD ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.432,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.2m (23.6ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 86.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $612,000,  Roadway Improvement Cost: $62,000,  Total Project Cost: $919,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: W030413PUDOTNBI,  Location: .2 MI S OF CONEY ST (Lat: 42.151858,  Lng: -71.209114),  Route carried "on" structure: US 1,  Year Built: 1984,  Status: Open,  Structure Length: 0.77m (2.53ft),  Average Daily Traffic: 47,900 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 60,013 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: WATER TRAPHOLE BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.129,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 33 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Poor,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021
Find on map >>   Show street view

Structure Number: N250303VTDOTNBI,  Location: 000063 STATUTORY (Lat: 42.166667,  Lng: -71.166667),  Route carried "under" structure: Interstate 95,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 59,450 (year 0000),  Features Intersected: I 95 NB,  Facility Carried by Structure: HWY NEPONSET ST
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.2m (76.1ft)

Find on map >>   Show street view

Structure Number: N250303VUDOTNBI,  Location: 000063 STATUTORY (Lat: 42.166667,  Lng: -71.166667),  Route carried "under" structure: Interstate 95,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 59,450 (year 0000),  Features Intersected: I 95 SB,  Facility Carried by Structure: HWY NEPONSET ST
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.2m (76.1ft)

Find on map >>   Show street view

Structure Number: W030333WLDOTNBI,  Location: 000063 STATUTORY (Lat: 42.150000,  Lng: -71.200000),  Route carried "under" structure: Interstate 95,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 41,000 (year 0000),  Features Intersected: I 95 NB,  Facility Carried by Structure: HWY CONEY ST
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.9m (62.0ft)

Discuss Norwood, Massachusetts (MA) on our hugely popular Massachusetts forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.