Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Harker Heights, Texas (TX)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 19Number of bridges
  • 259ft / 79.2mTotal length
  • $12,371,000Total costs
  • 354,448Total average daily traffic
  • 24,772Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Harker Heights
  • No street view available for this location

New bridges in Harker Heights, TX - historical statistics
  • New bridges - historical statistics
  • 11950-1959
  • 11960-1969
  • 121970-1979
  • 21990-1999
  • 12000-2009
  • 22010-2019
Average Bridge Daily Traffic in Harker Heights, TX
Average Bridge Truck Traffic in Harker Heights, TX
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 12.5%Very good
  • 62.5%Good
  • 25.0%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 12.5%Very good
  • 62.5%Good
  • 25.0%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 12.5%Very good
  • 87.5%Good
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 33.3%Good
  • 55.6%Satisfactory
  • 11.1%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 66.7%Good
  • 33.3%Satisfactory
Find on map >>   Show street view

Structure Number: 90140023103078,  Location: 1.9 MI E OF FM 3470 (Lat: 31.070531,  Lng: -97.669561),  Route carried "on" structure: State highway 2410,  Year Built: 1973,  Year Reconstructed: 2015,  Status: Open,  Structure Length: 12.68m (41.60ft),  Average Daily Traffic: 15,892 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 21,000 (year 2033),  Design Load: HS 20,  Features Intersected: US 190
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.143,  Lanes on structure: 6,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 37.2m (122.0ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 1.9m (6.2ft),  Curb-To-Curb Width: 27.0m (88.6ft),  Out-to-Out Width: 31.5m (103.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 15.85m (52.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,509,000,  Roadway Improvement Cost: $378,000,  Total Project Cost: $2,264,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 90140023103079,  Location: 1.0 MI W OF BU 190 (Lat: 31.076047,  Lng: -97.653897),  Route carried "on" structure: US 190,  Year Built: 1973,  Status: Open,  Structure Length: 7.96m (26.12ft),  Average Daily Traffic: 22,340 (year 2013),  Truck Traffic: 6%,  Average Future Daily Traffic: 31,270 (year 2033),  Design Load: HS 20,  Features Intersected: FM 3423 (INDIAN TRL)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.852,  Lanes on structure: 2,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 26.5m (86.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.94m (32.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $300,000,  Total Project Cost: $1,500,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9014002310308,  Location: 1.0 MI W OF BU 190 (Lat: 31.076219,  Lng: -97.654067),  Route carried "on" structure: US 190,  Year Built: 1973,  Status: Open,  Structure Length: 7.96m (26.12ft),  Average Daily Traffic: 22,340 (year 2013),  Truck Traffic: 6%,  Average Future Daily Traffic: 31,270 (year 2033),  Design Load: HS 20,  Features Intersected: FM 3423 (INDIAN TRL)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.852,  Lanes on structure: 2,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 26.5m (86.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.94m (32.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $300,000,  Total Project Cost: $1,500,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 90140023103081,  Location: 10.1 MI E OF CORYELL C/L (Lat: 31.075758,  Lng: -97.653653),  Route carried "on" structure: US 190,  Year Built: 1973,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 19,000 (year 2010),  Truck Traffic: 11%,  Average Future Daily Traffic: 31,470 (year 2030),  Design Load: HS 20,  Features Intersected: BRANCH OF S NOLAN CREEK,  Facility Carried by Structure: FM 3423/INDIAN TRL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.894,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 14.3m (46.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 25.1m (82.3ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $400,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 90140023103082,  Location: 10.2 MI E OF CORYELL C/L (Lat: 31.076917,  Lng: -97.652778),  Route carried "on" structure: US 190,  Year Built: 1973,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 17,243 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 62,550 (year 2033),  Design Load: HS 20,  Features Intersected: BRANCH OF S NOLAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.004,  Lanes on structure: 9,  Owner: State Highway Agency,  Approaching Roadway Width: 54.0m (177.2ft),  Skew: 24 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $400,000
Find on map >>   Show street view

Structure Number: 90140023103083,  Location: 10.3 MI E OF CORYELL C/L (Lat: 31.077469,  Lng: -97.651733),  Route carried "on" structure: US 190,  Year Built: 1973,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 17,243 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 62,550 (year 2033),  Design Load: HS 20,  Features Intersected: BRANCH OF S NOLAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.157,  Lanes on structure: 10,  Owner: State Highway Agency,  Approaching Roadway Width: 61.0m (200.1ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $400,000
Find on map >>   Show street view

Structure Number: 90140023103096,  Location: 0.83 MI E OF FM 3423 (Lat: 31.082586,  Lng: -97.642739),  Route carried "on" structure: State highway 190,  Year Built: 1976,  Status: Open,  Structure Length: 13.59m (44.59ft),  Average Daily Traffic: 10,690 (year 2013),  Truck Traffic: 2%,  Average Future Daily Traffic: 14,970 (year 2033),  Design Load: HS 20,  Features Intersected: US 190,  Facility Carried by Structure: OLD NOLAN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.642,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 9 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 43.3m (142.1ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 16.98m (55.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,700,000,  Roadway Improvement Cost: $500,000,  Total Project Cost: $2,500,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 90140023103388,  Location: 1.8 MI E of FM 3470 (Lat: 31.070361,  Lng: -97.669600),  Route carried "on" structure: State highway 2410,  Year Built: 2013,  Status: Open,  Structure Length: 12.86m (42.19ft),  Average Daily Traffic: 1,000 (year 2011),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,500 (year 2031),  Design Load: HL 93,  Features Intersected: US 190 ML
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.143,  Lanes on structure: 1,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 37.8m (124.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 90140203801001,  Location: 0.50 MI SW OF IH 35 (Lat: 30.910692,  Lng: -97.548228),  Route carried "on" structure: State highway 2115,  Year Built: 1955,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 533 (year 2020),  Truck Traffic: 31%,  Average Future Daily Traffic: 670 (year 2035),  Features Intersected: SALADO CREEK BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.027,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $174,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $261,000
Find on map >>   Show street view

Structure Number: 90140230402011,  Location: 0.25 MI W OF FM 3481 (Lat: 31.057669,  Lng: -97.658483),  Route carried "on" structure: State highway 2410,  Year Built: 2002,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 36,870 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 36,970 (year 2033),  Design Load: HS 20,  Features Intersected: SPROTT BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.052,  Lanes on structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 20.4m (66.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 2.4m (7.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021
Find on map >>   Show street view

Structure Number: 90140269601001,  Location: 0.05 Mi N of BUS 190 (Lat: 31.086700,  Lng: -97.648567),  Route carried "on" structure: State highway 3219,  Year Built: 1974,  Status: Open,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 6,252 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 7,550 (year 2033),  Design Load: HS 20,  Features Intersected: SOUTH NOLAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.147,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.23m (27.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $783,000,  Roadway Improvement Cost: $195,000,  Total Project Cost: $1,175,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 90140340901002,  Location: 0.40 MI S OF INT FM 2410 (Lat: 31.051561,  Lng: -97.655672),  Route carried "on" structure: State highway 3481,  Year Built: 1997,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 15,187 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 12,960 (year 2033),  Design Load: HS 20,  Features Intersected: TRIB TRIMMIER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.542,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.74m (8.99ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $261,000,  Roadway Improvement Cost: $65,000,  Total Project Cost: $392,000
Find on map >>   Show street view

Structure Number: 90140AA0572001,  Location: 0.50 MI W OF FM 3481 (Lat: 31.035117,  Lng: -97.664828),  Route carried "on" structure: County highway ,  Year Built: 1968,  Status: Open,  Structure Length: 3.75m (12.30ft),  Average Daily Traffic: 4,577 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,600 (year 2033),  Features Intersected: TRIMMIER CRK #5,  Facility Carried by Structure: CHAPARRAL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.656,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 4.57m (14.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $419,000,  Roadway Improvement Cost: $104,000,  Total Project Cost: $523,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 90140E00466001,  Location: 0.45 MI N OF US 190 BU (Lat: 31.098992,  Lng: -97.671667),  Route carried "on" structure: City street ,  Year Built: 1993,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 7,221 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 3,500 (year 2033),  Design Load: HS 20,  Features Intersected: S NOLAN CRK #1 HRK,  Facility Carried by Structure: ROY REYNOLDS DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.724,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 15.6m (51.2ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.24m (30.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $845,000,  Roadway Improvement Cost: $211,000,  Total Project Cost: $1,056,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 90140023103078,  Location: 1.9 MI E OF FM 3470 (Lat: 31.070531,  Lng: -97.669561),  Route carried "under" structure: US 190,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 38,720 (year 2013),  Truck Traffic: 6%,  Features Intersected: US 190,  Facility Carried by Structure: FM 2410
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 16.238,  Lanes on structure: 5,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.2m (122.0ft)

Find on map >>   Show street view

Structure Number: 90140023103079,  Location: 1.0 MI W OF BU 190 (Lat: 31.076047,  Lng: -97.653897),  Route carried "under" structure: State highway 3423,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 15,060 (year 2013),  Truck Traffic: 1%,  Features Intersected: FM 3423 (INDIAN TRL),  Facility Carried by Structure: US 190 EB ML
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 17.852,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.5m (86.9ft)

Find on map >>   Show street view

Structure Number: 9014002310308,  Location: 1.0 MI W OF BU 190 (Lat: 31.076219,  Lng: -97.654067),  Route carried "under" structure: State highway 3423,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 15,060 (year 2013),  Truck Traffic: 1%,  Features Intersected: FM 3423 (INDIAN TRL),  Facility Carried by Structure: US 190 WB ML
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 0.003,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.5m (86.9ft)

Find on map >>   Show street view

Structure Number: 90140023103096,  Location: 0.83 MI E OF FM 3423 (Lat: 31.082586,  Lng: -97.642739),  Route carried "under" structure: US 190,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 52,280 (year 2013),  Truck Traffic: 6%,  Features Intersected: US 190,  Facility Carried by Structure: OLD NOLAN RD
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 19.183,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 43.3m (142.1ft)

Find on map >>   Show street view

Structure Number: 90140023103388,  Location: 1.8 MI E of FM 3470 (Lat: 31.070361,  Lng: -97.669600),  Route carried "under" structure: US 190,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 36,940 (year 2010),  Truck Traffic: 8%,  Features Intersected: US 190 ML,  Facility Carried by Structure: FM 2410 TA
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 16.174,  Lanes on structure: 1,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.8m (124.0ft)

Discuss Harker Heights, Texas (TX) on our hugely popular Texas forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.