Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Dallas, Georgia (GA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 36Number of bridges
  • 361ft / 110mTotal length
  • $62,560,000Total costs
  • 252,028Total average daily traffic
  • 3,410Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Dallas
  • No street view available for this location

New bridges in Dallas, GA - historical statistics
  • New bridges - historical statistics
  • 21930-1939
  • 21940-1949
  • 31960-1969
  • 21970-1979
  • 31980-1989
  • 91990-1999
  • 32000-2009
  • 62010-2019
Average Bridge Daily Traffic in Dallas, GA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 15.8%Very good
  • 73.7%Good
  • 10.5%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 57.9%Very good
  • 26.3%Good
  • 10.5%Satisfactory
  • 5.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 15.8%Very good
  • 68.4%Good
  • 15.8%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 13.0%Excellent
  • 30.4%Very good
  • 34.8%Good
  • 13.0%Satisfactory
  • 8.7%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 63.6%Good
  • 27.3%Satisfactory
  • 9.1%Fair
Find on map >>   Show street view

Structure Number: 2230002,  Location: 2.2 MI W OF DALLAS (Lat: 33.916408,  Lng: -84.878028),  Route carried "on" structure: US 278,  Year Built: 1930,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 7.56m (24.80ft),  Average Daily Traffic: 16,910 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 25,365 (year 2031),  Design Load: H 15,  Features Intersected: PUMPKINVINE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.484,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 13 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 27.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $969,000,  Roadway Improvement Cost: $97,000,  Total Project Cost: $1,453,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2230003,  Location: IN WEST DALLAS (Lat: 33.921808,  Lng: -84.850719),  Route carried "on" structure: Business State highway 6,  Year Built: 1940,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 8,800 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 13,200 (year 2031),  Design Load: H 15,  Features Intersected: WEAVER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.22m (23.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $102,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $152,000
Find on map >>   Show street view

Structure Number: 2230004,  Location: AT S DALLAS CITY LIMT (Lat: 33.906378,  Lng: -84.825500),  Route carried "on" structure: State highway 61,  Year Built: 1936,  Status: Open,  Structure Length: 4.11m (13.48ft),  Average Daily Traffic: 13,120 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 19,680 (year 2031),  Design Load: H 15,  Features Intersected: SILVER COMET TRAIL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.093,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 8.5m (27.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 29.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.52m (34.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $527,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $791,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2230023,  Location: 1.2 MI NE OF DALLAS (Lat: 33.934589,  Lng: -84.824500),  Route carried "on" structure: County highway 2420,  Year Built: 1940,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 8,360 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 12,540 (year 2031),  Design Load: H 15,  Features Intersected: GRIFFIN CREEK,  Facility Carried by Structure: EAST MEMORIAL DRIV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $156,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $234,000
Find on map >>   Show street view

Structure Number: 2230024,  Location: 1.6 MI NE OF DALLAS (Lat: 33.939100,  Lng: -84.819028),  Route carried "on" structure: County highway 2420,  Year Built: 1993,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 8,360 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 12,540 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: LAWRENCE CREEK,  Facility Carried by Structure: EAST MEMORIAL DRIV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $113,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $170,000
Find on map >>   Show street view

Structure Number: 2230031,  Location: 4 MI NE OF DALLAS (Lat: 33.953669,  Lng: -84.779489),  Route carried "on" structure: County highway 1234,  Year Built: 1962,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 8,880 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 13,320 (year 2031),  Design Load: H 15,  Features Intersected: POSSUM CREEK,  Facility Carried by Structure: EAST PAULDING DRIV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $86,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $129,000
Find on map >>   Show street view

Structure Number: 2230032,  Location: 2.25 MI SE OF DALLAS (Lat: 33.902019,  Lng: -84.804378),  Route carried "on" structure: US 278,  Year Built: 1989,  Status: Open,  Structure Length: 5.21m (17.09ft),  Average Daily Traffic: 32,160 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 48,240 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: NS RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.531,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.4m (57.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $668,000,  Roadway Improvement Cost: $67,000,  Total Project Cost: $1,002,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2230033,  Location: 2.25 MI SE OF DALLAS (Lat: 33.902189,  Lng: -84.804469),  Route carried "on" structure: US 278,  Year Built: 1990,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 32,160 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 48,240 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: NS RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.531,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $625,000,  Roadway Improvement Cost: $63,000,  Total Project Cost: $938,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2230034,  Location: 5 MI S OF DALLAS (Lat: 33.866719,  Lng: -84.891928),  Route carried "on" structure: State highway 120,  Year Built: 1992,  Status: Open,  Structure Length: 6.58m (21.59ft),  Average Daily Traffic: 5,050 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 7,575 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: LITTLE PUMPKINVINE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.484,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 73.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $844,000,  Roadway Improvement Cost: $84,000,  Total Project Cost: $1,266,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2230037,  Location: 2.2 MI W OF DALLAS (Lat: 33.916208,  Lng: -84.877978),  Route carried "on" structure: US 278,  Year Built: 1992,  Status: Open,  Structure Length: 7.59m (24.90ft),  Average Daily Traffic: 16,910 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 25,365 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: PUMPKINVINE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.484,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 13 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.3m (83.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 62.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $973,000,  Roadway Improvement Cost: $97,000,  Total Project Cost: $1,459,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2230039,  Location: 2.7 MI N OF DALLAS (Lat: 33.962758,  Lng: -84.854519),  Route carried "on" structure: State highway 61,  Year Built: 1993,  Status: Open,  Structure Length: 10.67m (35.01ft),  Average Daily Traffic: 5,640 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 8,460 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: PUMPKINVINE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.140,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 61.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,368,000,  Roadway Improvement Cost: $137,000,  Total Project Cost: $2,051,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2235011,  Location: 1 MI NW OF DALLAS (Lat: 33.934189,  Lng: -84.864350),  Route carried "on" structure: County highway 116,  Year Built: 1969,  Status: Posted for load,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 2,202 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,303 (year 2031),  Design Load: HS 15,  Features Intersected: PUMPKINVINE CREEK,  Facility Carried by Structure: MOUNT OLIVET ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 31.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $781,000,  Roadway Improvement Cost: $78,000,  Total Project Cost: $1,172,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2235036,  Location: 3 MIILES SOUTH EAST OF DA (Lat: 33.883697,  Lng: -84.806669),  Route carried "on" structure: County highway 327,  Year Built: 1979,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 2,202 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,303 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: MILL CREEK,  Facility Carried by Structure: COCHRAN RIDGE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $102,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $152,000
Find on map >>   Show street view

Structure Number: 2235037,  Location: 3 MILES SOUTH EAST OF DAL (Lat: 33.885958,  Lng: -84.819658),  Route carried "on" structure: County highway 331,  Year Built: 1988,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 2,202 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,303 (year 2031),  Design Load: H 15,  Features Intersected: MILL CREEK,  Facility Carried by Structure: DAVIS MILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $102,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $152,000
Find on map >>   Show street view

Structure Number: 2235043,  Location: 2 MI N OF DALLAS (Lat: 33.955939,  Lng: -84.833008),  Route carried "on" structure: County highway 464,  Year Built: 1965,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 2,240 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,360 (year 2031),  Design Load: H 15,  Features Intersected: LAWRENCE CREEK,  Facility Carried by Structure: OLD CARTERSVILLE R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $145,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $217,000
Find on map >>   Show street view

Structure Number: 2235044,  Location: 2 MI N OF DALLAS (Lat: 33.958678,  Lng: -84.827639),  Route carried "on" structure: County highway 464,  Year Built: 1970,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 2,240 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,360 (year 2031),  Design Load: H 15,  Features Intersected: BONE CREEK,  Facility Carried by Structure: OLD CARTERSVILLE R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $123,000
Find on map >>   Show street view

Structure Number: 223505,  Location: 5 MI SW OF DALLAS (Lat: 33.892958,  Lng: -84.924147),  Route carried "on" structure: County highway 468,  Year Built: 1985,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: BLUFFY CREEK,  Facility Carried by Structure: HULSEY TOWN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Good,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $117,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $176,000
Find on map >>   Show street view

Structure Number: 223507,  Location: 5 MILES SOUTH WEST OF HIR (Lat: 33.845469,  Lng: -84.828419),  Route carried "on" structure: County highway 1077,  Year Built: 1994,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 2,202 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,303 (year 2031),  Design Load: H 15,  Features Intersected: DAVIS MILL CREEK,  Facility Carried by Structure: SWAN DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $113,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $170,000
Find on map >>   Show street view

Structure Number: 2235071,  Location: 5 MI SW OF DALLAS (Lat: 33.863758,  Lng: -84.887319),  Route carried "on" structure: County highway 255,  Year Built: 1995,  Status: Open,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 2,202 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,303 (year 2031),  Features Intersected: LITTLE PUMPKINVINE CREEK,  Facility Carried by Structure: PAUL HARRIS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.6m (61.0ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $238,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $358,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2235072,  Location: 5.8 MI SW OF DALLAS (Lat: 33.851758,  Lng: -84.891097),  Route carried "on" structure: County highway 255,  Year Built: 1995,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Features Intersected: LITTLE PUMPKINVINE CREEK,  Facility Carried by Structure: PAUL HARRIS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.4m (57.1ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $223,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $334,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2235077,  Location: IN SOUTH EAST DALLAS (Lat: 33.914228,  Lng: -84.827669),  Route carried "on" structure: State highway 61,  Year Built: 1998,  Status: Open,  Structure Length: 11.58m (37.99ft),  Average Daily Traffic: 12,540 (year 2011),  Truck Traffic: 8%,  Average Future Daily Traffic: 18,810 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: HARDEE ST./ NS RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.703,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,485,000,  Roadway Improvement Cost: $148,000,  Total Project Cost: $2,227,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 223508,  Location: IN SOUTH HIRAM (Lat: 33.870839,  Lng: -84.764628),  Route carried "on" structure: State highway 92,  Year Built: 2000,  Status: Open,  Structure Length: 7.19m (23.59ft),  Average Daily Traffic: 22,050 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 33,075 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: GRAYS MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.656,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 35.4m (116.1ft),  Skew: 23 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 25.2m (82.7ft),  Out-to-Out Width: 31.0m (101.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,677,000,  Roadway Improvement Cost: $168,000,  Total Project Cost: $2,515,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2235083,  Location: 2.3 MI. SW OF DALLAS (Lat: 33.906008,  Lng: -84.873900),  Route carried "on" structure: State highway 120,  Year Built: 2002,  Status: Open,  Structure Length: 6.04m (19.82ft),  Average Daily Traffic: 5,380 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 8,070 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: LANE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.312,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.1m (65.9ft),  Curb-To-Curb Width: 13.2m (43.3ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Excellent,  Operating Rating: 69.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $774,000,  Roadway Improvement Cost: $77,000,  Total Project Cost: $1,160,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2235087,  Location: 2 MI SE OF DALLAS (Lat: 33.906039,  Lng: -84.808639),  Route carried "on" structure: County highway 842,  Year Built: 2006,  Status: Open,  Structure Length: 5.12m (16.80ft),  Average Daily Traffic: 2,202 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,303 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: NS RR,  Facility Carried by Structure: OLD HARRIS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 14,  Length of Maximum Span: 17.1m (56.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $656,000,  Roadway Improvement Cost: $66,000,  Total Project Cost: $985,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2235093,  Location: 4 MILES S. E. OF DALLAS (Lat: 33.901578,  Lng: -84.812197),  Route carried "on" structure: County highway 842,  Year Built: 2010,  Status: Open,  Structure Length: 4.63m (15.19ft),  Average Daily Traffic: 3,500 (year 2010),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,000 (year 2030),  Design Load: HS 20+Mod,  Features Intersected: SILVER COMET TRAIL,  Facility Carried by Structure: OLD HARRIS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 46.3m (151.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $594,000,  Roadway Improvement Cost: $59,000,  Total Project Cost: $891,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2235095,  Location: 2 MI NE OF DALLAS (Lat: 33.915397,  Lng: -84.840247),  Route carried "on" structure: County highway 2000,  Year Built: 2011,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 1,900 (year 2008),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,850 (year 2030),  Design Load: H 15,  Features Intersected: GRIFFIN CREEK,  Facility Carried by Structure: SEABOARD DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.0m (13.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $113,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $170,000
Find on map >>   Show street view

Structure Number: 22351,  Location: 4 MI W OF DALLAS (Lat: 33.934100,  Lng: -84.910897),  Route carried "on" structure: County highway 121,  Year Built: 2014,  Status: Open,  Structure Length: 3.41m (11.19ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 5%,  Average Future Daily Traffic: 930 (year 2033),  Design Load: HS 20,  Features Intersected: SILVER COMET TRAIL,  Facility Carried by Structure: WILLOW SPRINGS ROA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 34.1m (111.9ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 85.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.10m (13.45ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $9,945,000,  Roadway Improvement Cost: $994,000,  Total Project Cost: $14,918,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2235101,  Location: 5 MI NW OF DALLAS (Lat: 33.997219,  Lng: -84.895239),  Route carried "on" structure: County highway 105,  Year Built: 2019,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: RACCOON CREEK,  Facility Carried by Structure: HIGH SHOALS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Excellent,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.92m (6.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $4,662,000,  Roadway Improvement Cost: $466,000,  Total Project Cost: $6,993,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: 2235102,  Location: 0.6 MI NE OF DALLAS (Lat: 33.916750,  Lng: -84.842414),  Route carried "on" structure: County highway 65603,  Year Built: 2016,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 1,900 (year 2008),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,850 (year 2030),  Design Load: HS 20+Mod,  Features Intersected: WEAVER CREEK,  Facility Carried by Structure: S MAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Excellent,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.16m (3.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,812,000,  Roadway Improvement Cost: $281,000,  Total Project Cost: $4,218,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: 2235103,  Location: 4.7 MILES NORTH EAST OF D (Lat: 33.971119,  Lng: -84.781308),  Route carried "on" structure: County highway 2420,  Year Built: 2018,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 10,420 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 15,630 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: POSSUM CREEK,  Facility Carried by Structure: DALLAS-ACWORTH HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 36.6m (120.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 19.8m (65.0ft),  Out-to-Out Width: 24.4m (80.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 84.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.39m (14.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $10,656,000,  Roadway Improvement Cost: $1,066,000,  Total Project Cost: $15,984,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2230029,  Location: IN WEST DALLAS (Lat: 33.922417,  Lng: -84.850136),  Route carried "under" structure: Business State highway 6,  Structure Length: 0. m,  Average Daily Traffic: 8,800 (year 2011),  Truck Traffic: 1%,  Features Intersected: STATE ROUTE 6 BUSINESS,  Facility Carried by Structure: NS RR (719802R)
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 1.609,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 2235054,  Location: 3 MI W OF DALLAS (Lat: 33.928639,  Lng: -84.895108),  Route carried "under" structure: County highway 116,  Structure Length: 0. m,  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Features Intersected: CR 116 MT. OLIVET ROAD,  Facility Carried by Structure: NS RR (719798D)
Minimum Vertical Clearance: 3.93m (12.89ft),  Kilometerpoint: 1.609,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 2235056,  Location: @ SW DALLAS CTY LMTS (Lat: 33.913428,  Lng: -84.850878),  Route carried "under" structure: County highway 242,  Structure Length: 0. m,  Average Daily Traffic: 2,202 (year 2011),  Truck Traffic: 1%,  Features Intersected: WEST AVENUE,  Facility Carried by Structure: SILVER COMET TRAIL
Minimum Vertical Clearance: 7.08m (23.23ft),  Kilometerpoint: 1.609,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 2235057,  Location: IN SOUTH DALLAS (Lat: 33.906342,  Lng: -84.832175),  Route carried "under" structure: County highway 243,  Structure Length: 0. m,  Average Daily Traffic: 2,202 (year 2011),  Truck Traffic: 1%,  Features Intersected: CR 243 ACADEMY DRIVE,  Facility Carried by Structure: SILVER COMET TRAIL
Minimum Vertical Clearance: 6.42m (21.06ft),  Kilometerpoint: 0.000,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 2235077,  Location: IN SOUTH EAST DALLAS (Lat: 33.914228,  Lng: -84.827669),  Route carried "under" structure: City street 2885,  Structure Length: 0. m,  Average Daily Traffic: 2,000 (year 1998),  Truck Traffic: 1%,  Features Intersected: SR 61,  Facility Carried by Structure: STATE ROUTE 61
Minimum Vertical Clearance: 8.50m (27.89ft),  Kilometerpoint: 14.484,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 2235084,  Location: IN DALLAS CITY LIMITS (Lat: 33.911428,  Lng: -84.841167),  Route carried "under" structure: City street 2000,  Structure Length: 0. m,  Average Daily Traffic: 2,202 (year 2011),  Truck Traffic: 1%,  Features Intersected: SEABOARD DR.,  Facility Carried by Structure: SILVER COMET TRAIL
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 1.609,  Length of Maximum Span: 0.0m

Discuss Dallas, Georgia (GA) on our hugely popular Georgia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.