Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Carteret, New Jersey (NJ)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 21Number of bridges
  • 541ft / 165mTotal length
  • $15,391,000Total costs
  • 492,037Total average daily traffic
  • 42,287Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Carteret
  • No street view available for this location

New bridges in Carteret, NJ - historical statistics
  • New bridges - historical statistics
  • 61960-1969
  • 81970-1979
  • 11990-1999
  • 62000-2009
Reconstructed bridges in Carteret, NJ - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 31980-1989
  • 21990-1999
  • 12000-2009
Average Bridge Daily Traffic in Carteret, NJ
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 75.0%Good
  • 25.0%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 12.5%Very good
  • 75.0%Satisfactory
  • 12.5%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 12.5%Very good
  • 37.5%Good
  • 37.5%Satisfactory
  • 12.5%Fair
Find on map >>   Show street view

Structure Number: M0958,  Location: 0.5 MI S OF RAHWAY RIVER (Lat: 40.593333,  Lng: -74.235000),  Route carried "on" structure: County highway 602,  Year Built: 1970,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 21.18m (69.49ft),  Average Daily Traffic: 18,741 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 22,868 (year 2039),  Design Load: HS 20,  Features Intersected: NJ TPK,RAMPS SIT,SOT,CRR,  Facility Carried by Structure: ROOSEVELT AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.189,  Lanes on structure: 2,  Lanes under structure: 19,  Owner: State Toll Authority,  Approaching Roadway Width: 13.7m (44.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 41.8m (137.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 13.7m (44.9ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 22.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 17.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 21.18m (69.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $250,000 ( Estimate for 2017),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: M09589A,  Location: INTERCHANGE 12 (Lat: 40.594631,  Lng: -74.233769),  Route carried "on" structure: Ramp Interstate 95,  Year Built: 1961,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 15.39m (50.49ft),  Average Daily Traffic: 1,860 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,200 (year 2039),  Design Load: HS 20,  Features Intersected: NJ TPK SNO RWY,CRR OF NJ,  Facility Carried by Structure: NJTPK INT.12 R.SIT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 81.320,  Lanes on structure: 1,  Lanes under structure: 4,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 33.8m (110.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Critical Feature Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: M09592A,  Location: INTERCHANGE 12 (Lat: 40.595533,  Lng: -74.235325),  Route carried "on" structure: Ramp Interstate 95,  Year Built: 1961,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 24.35m (79.89ft),  Average Daily Traffic: 12,600 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 15,000 (year 2039),  Design Load: HS 20,  Features Intersected: NJ TPK RWYS & CRR OF NJ,  Facility Carried by Structure: NJTPK RAMPS TS&NT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 81.320,  Lanes on structure: 2,  Lanes under structure: 16,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 34.4m (112.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 30.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 23.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 24.35m (79.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $8,480,000,  Roadway Improvement Cost: $1,060,000,  Total Project Cost: $14,278,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: M09592B,  Location: INTERCHANGE 12 (Lat: 40.594147,  Lng: -74.233786),  Route carried "on" structure: Ramp Interstate 95,  Year Built: 1970,  Status: Open,  Structure Length: 8.02m (26.31ft),  Average Daily Traffic: 4,100 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 4,900 (year 2039),  Design Load: HS 20,  Features Intersected: CENTRAL RAILROAD OF NJ,  Facility Carried by Structure: NJTPK INT.12 R.SOT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 81.288,  Lanes on structure: 1,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 47.2m (154.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 38.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 30.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: M09595A,  Location: .1 Mi E of Int. 12 (Lat: 40.592661,  Lng: -74.228750),  Route carried "on" structure: Ramp Interstate 95,  Year Built: 2009,  Status: Open,  Structure Length: 60.08m (197.11ft),  Average Daily Traffic: 3,800 (year 2021),  Truck Traffic: 9%,  Average Future Daily Traffic: 4,560 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: Ramps TE2 & ET2,  Facility Carried by Structure: NJTPK Ramps ET1&WT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 81.417,  Lanes on structure: 1,  Lanes under structure: 9,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 9 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 22,  Length of Maximum Span: 43.3m (142.1ft),  Curb-To-Curb Width: 7.7m (25.3ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 32.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 24.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Critical Feature Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: M09595B,  Location: .7 Mi. E. of Int. 12 (Lat: 40.592669,  Lng: -74.228458),  Route carried "on" structure: Ramp Interstate 95,  Year Built: 2004,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 3,750 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 4,500 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: Creek (Culvert),  Facility Carried by Structure: NJTPKRampsWT,ET&TE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 81.417,  Lanes on structure: 5,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 38.1m (125.0ft),  Skew: 23 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 38.1m (125.0ft),  Out-to-Out Width: 48.3m (158.5ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 50.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021
Find on map >>   Show street view

Structure Number: M09596A,  Location: INTERCHANGE 12 (Lat: 40.595156,  Lng: -74.233306),  Route carried "on" structure: Ramp Interstate 95,  Year Built: 1960,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 15.54m (50.98ft),  Average Daily Traffic: 3,720 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 4,460 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: NJTPK SNO RDWY & CONRAIL,  Facility Carried by Structure: NJTPK INT12 RP TNI
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 81.417,  Lanes on structure: 1,  Lanes under structure: 4,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 9 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 39.3m (128.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 35.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 26.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Critical Feature Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: M09596N,  Location: INTERCHANGE 12 (Lat: 40.595469,  Lng: -74.233008),  Route carried "on" structure: Ramp Interstate 95,  Year Built: 1995,  Status: Open,  Structure Length: 14.39m (47.21ft),  Average Daily Traffic: 3,930 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 4,720 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: CONRAIL,  Facility Carried by Structure: NJTPK INT12 RP TNO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 81.417,  Lanes on structure: 1,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 9 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 46.3m (151.9ft),  Curb-To-Curb Width: 8.9m (29.2ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 50.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: M09605A,  Location: INTERCHANGE 12 (Lat: 40.597219,  Lng: -74.233989),  Route carried "on" structure: Interstate 95,  Year Built: 1970,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 5.39m (17.68ft),  Average Daily Traffic: 52,060 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 62,470 (year 2041),  Design Load: HS 20,  Features Intersected: NJTPK INT.12 RPS.NIT&TSI,  Facility Carried by Structure: NJ TPK NSO RWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 81.562,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 22.3m (73.2ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 28.0m (91.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 22.3m (73.2ft),  Out-to-Out Width: 23.8m (78.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 57.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 43.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Total Project Cost: $863,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: M0958,  Location: 0.5 MI S OF RAHWAY RIVER (Lat: 40.593333,  Lng: -74.235000),  Route carried "under" structure: Interstate 95,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 49,694 (year 2019),  Truck Traffic: 9%,  Features Intersected: NJ TPK,RAMPS SIT,SOT,CRR,  Facility Carried by Structure: ROOSEVELT AVENUE
Minimum Vertical Clearance: 8.43m (27.66ft),  Kilometerpoint: 81.127,  Lanes on structure: 2,  Lanes under structure: 17,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.8m (137.1ft)

Find on map >>   Show street view

Structure Number: M0958,  Location: 0.5 MI S OF RAHWAY RIVER (Lat: 40.593333,  Lng: -74.235000),  Route carried "under" structure: Ramp Interstate 95,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 3,876 (year 2019),  Truck Traffic: 4%,  Features Intersected: NJ TPK,RAMPS SIT,SOT,CRR,  Facility Carried by Structure: ROOSEVELT AVENUE
Minimum Vertical Clearance: 6.27m (20.57ft),  Kilometerpoint: 81.127,  Lanes on structure: 2,  Lanes under structure: 1,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.8m (137.1ft)

Find on map >>   Show street view

Structure Number: M0958,  Location: 0.5 MI S OF RAHWAY RIVER (Lat: 40.593333,  Lng: -74.235000),  Route carried "under" structure: Ramp Interstate 95,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 3,876 (year 2019),  Truck Traffic: 9%,  Features Intersected: NJ TPK,RAMPS SIT,SOT,CRR,  Facility Carried by Structure: ROOSEVELT AVENUE
Minimum Vertical Clearance: 4.82m (15.81ft),  Kilometerpoint: 81.127,  Lanes on structure: 2,  Lanes under structure: 1,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.8m (137.1ft)

Find on map >>   Show street view

Structure Number: M09589A,  Location: INTERCHANGE 12 (Lat: 40.594631,  Lng: -74.233769),  Route carried "under" structure: Interstate 95,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 48,100 (year 2019),  Truck Traffic: 9%,  Features Intersected: NJ TPK SNO RWY,CRR OF NJ,  Facility Carried by Structure: NJTPK INT.12 R.SIT
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 81.320,  Lanes on structure: 1,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.8m (110.9ft)

Find on map >>   Show street view

Structure Number: M09592A,  Location: INTERCHANGE 12 (Lat: 40.595533,  Lng: -74.235325),  Route carried "under" structure: Interstate 95,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 192,000 (year 2019),  Truck Traffic: 9%,  Features Intersected: NJ TPK RWYS & CRR OF NJ,  Facility Carried by Structure: NJTPK RAMPS TS&NT
Minimum Vertical Clearance: 7.11m (23.33ft),  Kilometerpoint: 81.320,  Lanes on structure: 2,  Lanes under structure: 16,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.4m (112.9ft)

Find on map >>   Show street view

Structure Number: M09595A,  Location: .1 Mi E of Int. 12 (Lat: 40.592661,  Lng: -74.228750),  Route carried "under" structure: Ramp Interstate 95,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 3,060 (year 2021),  Truck Traffic: 5%,  Features Intersected: Ramps TE2 & ET2,  Facility Carried by Structure: NJTPK Ramps ET1&WT
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 81.417,  Lanes on structure: 1,  Lanes under structure: 1,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 43.3m (142.1ft)

Find on map >>   Show street view

Structure Number: M09595A,  Location: .1 Mi E of Int. 12 (Lat: 40.592661,  Lng: -74.228750),  Route carried "under" structure: Ramp Interstate 95,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 3,060 (year 2021),  Truck Traffic: 5%,  Features Intersected: Ramps TE2 & ET2,  Facility Carried by Structure: NJTPK Ramps ET1&WT
Minimum Vertical Clearance: 4.82m (15.81ft),  Kilometerpoint: 81.417,  Lanes on structure: 1,  Lanes under structure: 1,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 43.3m (142.1ft)

Find on map >>   Show street view

Structure Number: M09595A,  Location: .1 Mi E of Int. 12 (Lat: 40.592661,  Lng: -74.228750),  Route carried "under" structure: Ramp US 95,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 3,800 (year 2021),  Truck Traffic: 14%,  Features Intersected: Ramps TE2 & ET2,  Facility Carried by Structure: NJTPK Ramps ET1&WT
Minimum Vertical Clearance: 5.74m (18.83ft),  Kilometerpoint: 81.417,  Lanes on structure: 1,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 43.3m (142.1ft)

Find on map >>   Show street view

Structure Number: M09595A,  Location: .1 Mi E of Int. 12 (Lat: 40.592661,  Lng: -74.228750),  Route carried "under" structure: County highway 602,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 24,700 (year 2021),  Truck Traffic: 4%,  Features Intersected: Ramps TE2 & ET2,  Facility Carried by Structure: NJTPK Ramps ET1&WT
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 2.189,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 43.3m (142.1ft)

Find on map >>   Show street view

Structure Number: M09596A,  Location: INTERCHANGE 12 (Lat: 40.595156,  Lng: -74.233306),  Route carried "under" structure: Interstate 95,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 48,170 (year 2019),  Truck Traffic: 9%,  Features Intersected: NJTPK SNO RDWY & CONRAIL,  Facility Carried by Structure: NJTPK INT12 RP TNI
Minimum Vertical Clearance: 7.03m (23.06ft),  Kilometerpoint: 81.417,  Lanes on structure: 1,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.3m (128.9ft)

Find on map >>   Show street view

Structure Number: M09605A,  Location: INTERCHANGE 12 (Lat: 40.597219,  Lng: -74.233989),  Route carried "under" structure: Ramp Interstate 95,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 3,570 (year 2021),  Truck Traffic: 9%,  Features Intersected: NJTPK INT.12 RPS.NIT&TSI,  Facility Carried by Structure: NJ TPK NSO RWY
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 81.562,  Lanes on structure: 4,  Lanes under structure: 1,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.0m (91.9ft)

Find on map >>   Show street view

Structure Number: M09605A,  Location: INTERCHANGE 12 (Lat: 40.597219,  Lng: -74.233989),  Route carried "under" structure: Ramp Interstate 95,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 3,570 (year 2021),  Truck Traffic: 9%,  Features Intersected: NJTPK INT.12 RPS.NIT&TSI,  Facility Carried by Structure: NJ TPK NSO RWY
Minimum Vertical Clearance: 4.77m (15.65ft),  Kilometerpoint: 81.562,  Lanes on structure: 4,  Lanes under structure: 1,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.0m (91.9ft)

Discuss Carteret, New Jersey (NJ) on our hugely popular New Jersey forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.