Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Barnstable Town, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 125ft / 38.4mTotal length
  • $23,726,000Total costs
  • 188,595Total average daily traffic
  • 14,079Total average daily truck traffic
  • 495,585Total future (year 2031) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Barnstable Town
  • No street view available for this location

New bridges in Barnstable Town, MA - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 61950-1959
  • 41960-1969
  • 22000-2009
Average Bridge Daily Traffic in Barnstable Town, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 9.1%Very good
  • 72.7%Good
  • 18.2%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 15.4%Very good
  • 61.5%Good
  • 23.1%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 7.7%Very good
  • 69.2%Good
  • 23.1%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 33.3%Very good
  • 66.7%Satisfactory
Find on map >>   Show street view

Structure Number: B01002AEDMUNNBI,  Location: AT CENTERVILLE RIVER (Lat: 41.639278,  Lng: -70.344481),  Route carried "on" structure: City street ,  Year Built: 2002,  Status: Open,  Structure Length: 2.33m (7.64ft),  Average Daily Traffic: 6,500 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 28,427 (year 2031),  Design Load: HS 20,  Features Intersected: WATER CENTERVILLE RIVER,  Facility Carried by Structure: HWY BEACH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.547,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.3m (30.5ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.1m (72.5ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 15.3m (50.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 97.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $928,000,  Roadway Improvement Cost: $93,000,  Total Project Cost: $1,393,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Internally Sealed
Find on map >>   Show street view

Structure Number: B01004434MUNNBI,  Location: 0.1MI S OF COMMERCE RD (Lat: 41.706394,  Lng: -70.298500),  Route carried "on" structure: City street ,  Year Built: 1936,  Year Reconstructed: 1996,  Status: Posted for load,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 2,785 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 8,212 (year 2031),  Design Load: HS 20,  Features Intersected: WATER MARASPIN CREEK,  Facility Carried by Structure: HWY MILLWAY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.724,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 64.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $446,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $670,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: B01006AECMUNNBI,  Location: AT MASHPEE TOWNLINE (Lat: 41.616744,  Lng: -70.450447),  Route carried "on" structure: City street ,  Year Built: 2001,  Status: Posted for load,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 5,300 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 9,318 (year 2031),  Design Load: HS 20,  Features Intersected: WATER SANTUIT RIVER,  Facility Carried by Structure: HWY SCHOOL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.3m (27.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.3m (53.5ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 45.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.90m (6.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $968,000,  Roadway Improvement Cost: $97,000,  Total Project Cost: $1,453,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: B0101149TDOTNBI,  Location: 1.75 M E OF SANDWICH TL (Lat: 41.696694,  Lng: -70.384333),  Route carried "on" structure: State highway 149,  Year Built: 1950,  Status: Open,  Structure Length: 1.87m (6.14ft),  Average Daily Traffic: 5,600 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 47,379 (year 2031),  Design Load: H 20,  Features Intersected: US 6 WB/MID CAPE HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.001,  Lanes on structure: 2,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 9.5m (31.2ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Superstructure: Good,  Substructure: Good,  Operating Rating: 81.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.90m (6.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $764,000,  Roadway Improvement Cost: $77,000,  Total Project Cost: $1,147,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: B010124APDOTNBI,  Location: ADJCENT TO JCT SERVICE RD (Lat: 41.684517,  Lng: -70.353514),  Route carried "on" structure: City street ,  Year Built: 1950,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 3,934 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 8,844 (year 2032),  Design Load: H 20,  Features Intersected: US 6 WB/MID CAPE HWY,  Facility Carried by Structure: HWY OAK ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.3m (46.9ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 50.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $768,000,  Roadway Improvement Cost: $77,000,  Total Project Cost: $1,153,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: B010144ANDOTNBI,  Location: AT JCT SERVICE ROAD (Lat: 41.684033,  Lng: -70.353825),  Route carried "on" structure: City street ,  Year Built: 1950,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 3,934 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 12,950 (year 2032),  Design Load: H 20,  Features Intersected: US 6 EB/MID CAPE HWY,  Facility Carried by Structure: HWY OAK ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.3m (46.9ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Inventory Rating: 75.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $690,000,  Roadway Improvement Cost: $70,000,  Total Project Cost: $1,036,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: B0101546JDOTNBI,  Location: 1.5 M E OF RTE 132 (Lat: 41.688172,  Lng: -70.306861),  Route carried "on" structure: US 6,  Year Built: 1966,  Status: Open,  Structure Length: 4.05m (13.29ft),  Average Daily Traffic: 23,357 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 50,696 (year 2031),  Design Load: H 20,  Features Intersected: HWY PHINNEYS LN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 111.219,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.2m (53.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 35.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.10m (13.45ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $464,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $697,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: B0101546KDOTNBI,  Location: 2.5 M E OF OAK ST (Lat: 41.688600,  Lng: -70.306681),  Route carried "on" structure: US 6,  Year Built: 1953,  Status: Open,  Structure Length: 4.02m (13.19ft),  Average Daily Traffic: 25,714 (year 2018),  Truck Traffic: 11%,  Average Future Daily Traffic: 50,696 (year 2031),  Design Load: H 20,  Features Intersected: HWY PHINNEYS LN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 111.219,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.2m (53.1ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 44.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.10m (13.45ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $2,207,000,  Roadway Improvement Cost: $221,000,  Total Project Cost: $3,311,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: B0101649RDOTNBI,  Location: 1.75 M E OF SNDWCH TL (Lat: 41.696231,  Lng: -70.384625),  Route carried "on" structure: State highway 149,  Year Built: 1953,  Status: Open,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 5,600 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 47,379 (year 2031),  Design Load: H 20,  Features Intersected: US 6 EB/MID CAPE HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.051,  Lanes on structure: 2,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 9.5m (31.2ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Superstructure: Good,  Substructure: Good,  Operating Rating: 91.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of replacement,  Length Of Structure Improvement: 2.90m (9.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,382,000,  Roadway Improvement Cost: $239,000,  Total Project Cost: $3,574,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: B0101846LDOTNBI,  Location: 1.25 M W OF WILLOW ST (Lat: 41.687919,  Lng: -70.281050),  Route carried "on" structure: US 6,  Year Built: 1953,  Status: Open,  Structure Length: 4.02m (13.19ft),  Average Daily Traffic: 26,000 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 39,325 (year 2031),  Design Load: H 20,  Features Intersected: HWY MARY DUNN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 114.035,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.2m (53.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 41.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.10m (13.45ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,207,000,  Roadway Improvement Cost: $221,000,  Total Project Cost: $3,311,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: B0101846MDOTNBI,  Location: 1.25 M W OF WILLOW ST (Lat: 41.687436,  Lng: -70.281050),  Route carried "on" structure: US 6,  Year Built: 1966,  Status: Open,  Structure Length: 4.05m (13.29ft),  Average Daily Traffic: 27,200 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 39,325 (year 2031),  Design Load: H 20,  Features Intersected: HWY MARY DUNN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 114.035,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.2m (53.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 57.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 36.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.10m (13.45ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $464,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $697,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: B0101946GDOTNBI,  Location: 1. MI E OF OAK ST (Lat: 41.687939,  Lng: -70.336186),  Route carried "on" structure: US 6,  Year Built: 1966,  Status: Open,  Structure Length: 4.96m (16.27ft),  Average Daily Traffic: 25,400 (year 2006),  Truck Traffic: 10%,  Average Future Daily Traffic: 83,703 (year 2032),  Design Load: H 20,  Features Intersected: ST132 IYANNOUGH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 107.207,  Lanes on structure: 3,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 24.3m (79.7ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 55.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.00m (16.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $2,923,000,  Roadway Improvement Cost: $293,000,  Total Project Cost: $4,385,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: B0101946HDOTNBI,  Location: 1 M E OF OAK ST (Lat: 41.687692,  Lng: -70.335769),  Route carried "on" structure: US 6,  Year Built: 1966,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 27,271 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 69,331 (year 2032),  Design Load: H 20,  Features Intersected: ST132 IYANNOUGH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 109.320,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.5m (37.7ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 26.6m (87.3ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 57.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.20m (17.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $599,000,  Roadway Improvement Cost: $60,000,  Total Project Cost: $899,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Membrane: Built-up
Discuss Barnstable Town, Massachusetts (MA) on our hugely popular Massachusetts forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.