  • National Bridge Inventory (NBI) Statistics
  • 27Number of bridges
  • 230ft / 70.2mTotal length
  • $82,758,000Total costs
  • 216,600Total average daily traffic
  • 6,736Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Winder
  • No street view available for this location

New bridges in Winder, GA - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 11940-1949
  • 11950-1959
  • 51960-1969
  • 31970-1979
  • 41980-1989
  • 31990-1999
  • 22000-2009
  • 12010-2019
  • 22020-2022
Reconstructed bridges in Winder, GA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 11990-1999
Average Bridge Daily Traffic in Winder, GA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 33.3%Very good
  • 66.7%Good
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 33.3%Very good
  • 66.7%Good
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 22.2%Very good
  • 55.6%Good
  • 22.2%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 28.6%Very good
  • 42.9%Good
  • 14.3%Satisfactory
  • 9.5%Fair
  • 4.8%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 85.7%Good
  • 14.3%Satisfactory
Find on map >>   Show street view

Structure Number: 130004,  Location: 5.3 MI NE OF WINDER (Lat: 34.052408,  Lng: -83.663258),  Route carried "on" structure: State highway 11,  Year Built: 1973,  Status: Open,  Structure Length: 7.68m (25.20ft),  Average Daily Traffic: 4,680 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 7,020 (year 2032),  Design Load: HS 20,  Features Intersected: MULBERRY RIVER,  Facility Carried by Structure: WINDER-JEFRSON HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.921,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.6m (34.8ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 37.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $985,000,  Roadway Improvement Cost: $98,000,  Total Project Cost: $1,477,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 130006,  Location: 3.5 MI N OF WINDER (Lat: 34.043289,  Lng: -83.715989),  Route carried "on" structure: State highway 53,  Year Built: 1935,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 7,000 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 10,500 (year 2032),  Design Load: H 15,  Features Intersected: HAWK CREEK,  Facility Carried by Structure: GAINESVILLE HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 59.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: March 2021,  Underwater Inspection Date: June 2021,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000
Find on map >>   Show street view

Structure Number: 130007,  Location: 4.3 MI N OF WINDER (Lat: 34.055039,  Lng: -83.717058),  Route carried "on" structure: State highway 53,  Year Built: 1981,  Status: Posted for load,  Structure Length: 7.68m (25.20ft),  Average Daily Traffic: 7,000 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 10,500 (year 2032),  Design Load: HS 20,  Features Intersected: MULBERRY RIVER,  Facility Carried by Structure: GAINESVILLE HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.6m (51.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 23.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 14.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: March 2021,  Underwater Inspection Date: June 2021,  Bridge Improvement Cost: $985,000,  Roadway Improvement Cost: $98,000,  Total Project Cost: $1,477,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 130008,  Location: 2.6 MI SW OF WINDER (Lat: 33.960650,  Lng: -83.747389),  Route carried "on" structure: State highway 81,  Year Built: 1968,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 12,380 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 18,570 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: MARBURY CREEK,  Facility Carried by Structure: CHARLES FLOYD RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Inventory Rating: 61.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000
Find on map >>   Show street view

Structure Number: 130009,  Location: 2.2 MI E OF WINDER (Lat: 33.992319,  Lng: -83.683097),  Route carried "on" structure: State highway 82,  Year Built: 1942,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 3,350 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,025 (year 2032),  Design Load: H 15,  Features Intersected: BEECH CREEK TRIB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $117,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $176,000
Find on map >>   Show street view

Structure Number: 130015,  Location: 2.2 MI NW OF WINDER (Lat: 34.006908,  Lng: -83.755719),  Route carried "on" structure: State highway 211,  Year Built: 1970,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 8,690 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 13,035 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: CEDAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.140,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $117,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $176,000
Find on map >>   Show street view

Structure Number: 130025,  Location: IN WINDER (Lat: 34.012008,  Lng: -83.738950),  Route carried "on" structure: County highway 5400,  Year Built: 1960,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 1,980 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,970 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: CEDAR CREEK,  Facility Carried by Structure: CITY POND ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $86,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $129,000
Find on map >>   Show street view

Structure Number: 130029,  Location: 6 MI SW OF WINDER (Lat: 33.957869,  Lng: -83.783139),  Route carried "on" structure: US 29,  Year Built: 1991,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 26,470 (year 2012),  Truck Traffic: 10%,  Average Future Daily Traffic: 39,705 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: WILLIAMSON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 11 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $163,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $245,000
Find on map >>   Show street view

Structure Number: 135014,  Location: IN FORT YARGO PARK (Lat: 33.977478,  Lng: -83.735450),  Route carried "on" structure: County highway 362,  Year Built: 1965,  Year Reconstructed: 1998,  Status: Posted for load,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 410 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 615 (year 2032),  Features Intersected: MARBURY CREEK,  Facility Carried by Structure: FT YARGO PARK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Park, Forest, or Reservation Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 32.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 41.48m (136.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $164,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $246,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 135015,  Location: 4.1 MI W OF BETHLEHEM (Lat: 33.929478,  Lng: -83.785789),  Route carried "on" structure: County highway 410,  Year Built: 1968,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: H 15,  Features Intersected: WILLIAMSON CREEK,  Facility Carried by Structure: TOM MILLER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Inventory Rating: 63.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000
Find on map >>   Show street view

Structure Number: 135016,  Location: 4.5 MI SE OF WINDER (Lat: 33.950528,  Lng: -83.778828),  Route carried "on" structure: County highway 92,  Year Built: 1984,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: WILLIAMSON CREEK,  Facility Carried by Structure: HAYMON MORRIS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $156,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $234,000
Find on map >>   Show street view

Structure Number: 135036,  Location: 3 MI E OF WINDER (Lat: 34.004600,  Lng: -83.671969),  Route carried "on" structure: County highway 240,  Year Built: 1977,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: BEECH CREEK TRIB,  Facility Carried by Structure: HOLSENBECK SC RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $86,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $129,000
Find on map >>   Show street view

Structure Number: 135037,  Location: 3.6 MI N OF WINDER (Lat: 34.039589,  Lng: -83.696047),  Route carried "on" structure: County highway 4,  Year Built: 1957,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: H 15,  Features Intersected: CEDAR CREEK,  Facility Carried by Structure: ROCKWELL CH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $123,000
Find on map >>   Show street view

Structure Number: 135042,  Location: 2.3 MI W OF BETHLEHEM (Lat: 33.921900,  Lng: -83.751858),  Route carried "on" structure: County highway 111,  Year Built: 1985,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: APALACHEE RIVER TRIB,  Facility Carried by Structure: J.B.OWENS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $123,000
Find on map >>   Show street view

Structure Number: 135043,  Location: 3 MI SW OF WINDER (Lat: 33.956258,  Lng: -83.750839),  Route carried "on" structure: County highway 88,  Year Built: 1990,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: MARBURY CREEK TRIB,  Facility Carried by Structure: TUCKER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $117,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $176,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 135044,  Location: 1 MI E OF WINDER (Lat: 33.987858,  Lng: -83.694808),  Route carried "on" structure: County highway 171,  Year Built: 1990,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 340 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 510 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: BEECH CREEK TRIB,  Facility Carried by Structure: LAYS DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 49.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $105,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $158,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 135053,  Location: 2.7 MI N OR WINDER (Lat: 34.029639,  Lng: -83.712508),  Route carried "on" structure: State highway 53,  Year Built: 2003,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 7,000 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 10,500 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: CEDAR CREEK,  Facility Carried by Structure: GAINESVILLE HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $219,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $328,000
Find on map >>   Show street view

Structure Number: 135054,  Location: 2.3 MI S OF WINDER (Lat: 33.958647,  Lng: -83.720119),  Route carried "on" structure: US 29,  Year Built: 2006,  Status: Open,  Structure Length: 3.51m (11.52ft),  Average Daily Traffic: 8,490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 12,735 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: MARBURY CREEK,  Facility Carried by Structure: WINDER-MONORE HWY-
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 35.1m (115.2ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.5m (47.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.55m (34.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $449,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $674,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 135061,  Location: 3.5 MILES SOUTH OF WINDER (Lat: 33.946031,  Lng: -83.754231),  Route carried "on" structure: State highway 81,  Year Built: 2020,  Status: Open,  Structure Length: 7.27m (23.85ft),  Average Daily Traffic: 12,380 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 18,570 (year 2032),  Design Load: HL 93,  Features Intersected: SR316
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 36.3m (119.1ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 23.2m (76.1ft),  Out-to-Out Width: 23.2m (76.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.75m (28.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $21,238,000,  Roadway Improvement Cost: $2,124,000,  Total Project Cost: $31,857,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 135063,  Location: 3.3M WEST OF WINDER (Lat: 33.992253,  Lng: -83.778164),  Route carried "on" structure: Bypass County highway 93,  Year Built: 2020,  Status: Open,  Structure Length: 22.19m (72.80ft),  Average Daily Traffic: 15,400 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 17,080 (year 2040),  Design Load: HL 93,  Features Intersected: SR 8 AND BANKHEAD HWY,  Facility Carried by Structure: WEST WINDER BYPASS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.299,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.0m (82.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 44.8m (147.0ft),  Curb-To-Curb Width: 25.0m (82.0ft),  Out-to-Out Width: 26.2m (86.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.36m (17.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $13,024,000,  Roadway Improvement Cost: $1,302,000,  Total Project Cost: $19,536,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1575028,  Location: 4 MI SE OF HOSCHTON (Lat: 34.060439,  Lng: -83.709058),  Route carried "on" structure: County highway 167,  Year Built: 1985,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: INDIAN CREEK,  Facility Carried by Structure: TAPP WOOD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $172,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $258,000
Find on map >>   Show street view

Structure Number: 1575057,  Location: 5 MI SE OF HOSCHTON (Lat: 34.066269,  Lng: -83.686069),  Route carried "on" structure: County highway 361,  Year Built: 1963,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Design Load: H 15,  Features Intersected: MULBERRY RIVER TRIB,  Facility Carried by Structure: JACKSON TRAIL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $94,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $141,000
Find on map >>   Show street view

Structure Number: 2975098,  Location: 1.5 MI NE OF BOLD SPRINGS (Lat: 33.915939,  Lng: -83.781519),  Route carried "on" structure: State highway 81,  Year Built: 2015,  Status: Open,  Structure Length: 5.61m (18.41ft),  Average Daily Traffic: 15,600 (year 2015),  Truck Traffic: 6%,  Average Future Daily Traffic: 25,600 (year 2035),  Design Load: HS 20+Mod,  Features Intersected: APALACHEE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.796,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 34.1m (111.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 73.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.74m (22.11ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2021,  Underwater Inspection Date: April 2020,  Bridge Improvement Cost: $16,354,000,  Roadway Improvement Cost: $1,635,000,  Total Project Cost: $24,531,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 130026,  Location: IN WINDER (Lat: 33.992408,  Lng: -83.724139),  Route carried "under" structure: City street 5406,  Structure Length: 0. m,  Average Daily Traffic: 2,890 (year 2012),  Truck Traffic: 1%,  Features Intersected: M-5406 CENTER STREET,  Facility Carried by Structure: CSX RAILROAD
Minimum Vertical Clearance: 4.16m (13.65ft),  Kilometerpoint: 0.000,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 135061,  Location: 3.5 MILES SOUTH OF WINDER (Lat: 33.946031,  Lng: -83.754231),  Route carried "under" structure: State highway 316,  Structure Length: 0. m,  Average Daily Traffic: 53,600 (year 2017),  Truck Traffic: 1%,  Features Intersected: SR81,  Facility Carried by Structure: SR 81
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 5.665,  Lanes on structure: 4,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 135063,  Location: 3.3M WEST OF WINDER (Lat: 33.992253,  Lng: -83.778164),  Route carried "under" structure: US 29,  Structure Length: 0. m,  Average Daily Traffic: 12,400 (year 2010),  Truck Traffic: 3%,  Features Intersected: WEST WINDER BYPASS,  Facility Carried by Structure: WEST WINDER BYPASS
Minimum Vertical Clearance: 7.49m (24.57ft),  Kilometerpoint: 35.711,  Lanes on structure: 4,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 135063,  Location: 3.3M WEST OF WINDER (Lat: 33.992253,  Lng: -83.778164),  Route carried "under" structure: County highway 28,  Structure Length: 0. m,  Average Daily Traffic: 12,400 (year 2012),  Truck Traffic: 3%,  Features Intersected: WEST WINDER BYPASS,  Facility Carried by Structure: WEST WINDER BYPASS
Minimum Vertical Clearance: 10.10m (33.14ft),  Kilometerpoint: 3.396,  Lanes on structure: 4,  Length of Maximum Span: 0.0m