Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for St. Marys, Georgia (GA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 20Number of bridges
  • 400ft / 122mTotal length
  • $19,575,000Total costs
  • 225,732Total average daily traffic
  • 22,628Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for St. Marys
  • No street view available for this location

New bridges in St. Marys, GA - historical statistics
  • New bridges - historical statistics
  • 21950-1959
  • 21960-1969
  • 21970-1979
  • 101980-1989
  • 11990-1999
  • 12000-2009
Reconstructed bridges in St. Marys, GA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 31990-1999
Average Bridge Daily Traffic in St. Marys, GA
Average Bridge Truck Traffic in St. Marys, GA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 18.8%Very good
  • 62.5%Good
  • 18.8%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 12.5%Very good
  • 81.3%Good
  • 6.3%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 6.3%Very good
  • 68.8%Good
  • 6.3%Satisfactory
  • 18.8%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 28.6%Very good
  • 57.1%Good
  • 14.3%Fair
Find on map >>   Show street view

Structure Number: 1GA3988,  Location: 600 M N OF DAN WEBSTER RD (Lat: 30.774222,  Lng: -81.544333),  Route carried "on" structure: Federal lands road ,  Year Built: 1981,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 2 (year 2013),  Truck Traffic: 20%,  Average Future Daily Traffic: 4 (year 2032),  Features Intersected: CREEK,  Facility Carried by Structure: FORT PETER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Navy/Marines,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft),  Curb-To-Curb Width: 4.0m (13.1ft),  Out-to-Out Width: 5.2m (17.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 55.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $4,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $13,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 390018,  Location: 1 MI W OF SAINT MARYS (Lat: 30.753750,  Lng: -81.583569),  Route carried "on" structure: State highway 40,  Year Built: 1958,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 15,590 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 23,385 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: DARK ENTRY CREEK,  Facility Carried by Structure: KINGSLAND-ST MARYS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.796,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 29.3m (96.1ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 22.6m (74.1ft),  Out-to-Out Width: 26.8m (87.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: May 2021,  Underwater Inspection Date: May 2018,  Bridge Improvement Cost: $1,066,000,  Roadway Improvement Cost: $107,000,  Total Project Cost: $1,598,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 390029,  Location: GA-FLA STATE LINE (Lat: 30.744667,  Lng: -81.654136),  Route carried "on" structure: Interstate 95,  Year Built: 1971,  Year Reconstructed: 1998,  Status: Open,  Structure Length: 37.67m (123.59ft),  Average Daily Traffic: 54,710 (year 2012),  Truck Traffic: 17%,  Average Future Daily Traffic: 82,065 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: ST MARY'S RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 10 degrees,  Navigation Control: Yes ( Vertical Clearance: 11.5m (37.7ft), Horizontal Clearance: 30.4m (99.7ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 9,  Length of Maximum Span: 46.9m (153.9ft),  Curb-To-Curb Width: 19.1m (62.7ft),  Out-to-Out Width: 20.0m (65.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: April 2021,  Underwater Inspection Date: September 2018,  Bridge Improvement Cost: $6,146,000,  Roadway Improvement Cost: $615,000,  Total Project Cost: $9,220,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 390048,  Location: 13 MI SE OF WOODBINE (Lat: 30.873469,  Lng: -81.602800),  Route carried "on" structure: County highway 1276,  Year Built: 1964,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 330 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 495 (year 2032),  Design Load: H 15,  Features Intersected: PINE BARREN SWAMP,  Facility Carried by Structure: HARRIETTS BLUFF RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.265,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000
Find on map >>   Show street view

Structure Number: 390049,  Location: 14 MI SE OF WOODBINE (Lat: 30.889097,  Lng: -81.559139),  Route carried "on" structure: County highway 1276,  Year Built: 1964,  Status: Open,  Structure Length: 4.27m (14.01ft),  Average Daily Traffic: 330 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 495 (year 2032),  Design Load: HS 20,  Features Intersected: DEEP CREEK,  Facility Carried by Structure: HARRIETTS BLUFF RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.484,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 8.5m (27.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 60.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2021,  Underwater Inspection Date: May 2018,  Bridge Improvement Cost: $547,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $821,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 390057,  Location: 4.5 MI W OF ST MARYS (Lat: 30.761322,  Lng: -81.604894),  Route carried "on" structure: City street 532,  Year Built: 1985,  Status: Open,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 9,240 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 13,860 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR40 ST MARYS-KINGSLAND,  Facility Carried by Structure: ST. MARYS RD (EBL)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 27.7m (90.9ft),  Curb-To-Curb Width: 16.4m (53.8ft),  Out-to-Out Width: 20.1m (65.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 61.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $816,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $1,223,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 390058,  Location: 4.5 MI W OF ST MARYS (Lat: 30.761428,  Lng: -81.605156),  Route carried "on" structure: City street 6052,  Year Built: 1985,  Status: Open,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 12,430 (year 2007),  Truck Traffic: 1%,  Average Future Daily Traffic: 18,645 (year 2030),  Design Load: HS 20+Mod,  Features Intersected: SR40 ST MARYS-KINGSLAND,  Facility Carried by Structure: ST. MARYS RD (WBL)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 27.7m (90.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 19.3m (63.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 59.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $816,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $1,223,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 395028,  Location: 6 MI W OF ST MARY'S (Lat: 30.756578,  Lng: -81.620128),  Route carried "on" structure: City street 532,  Year Built: 1950,  Year Reconstructed: 1985,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 11,020 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 16,530 (year 2032),  Design Load: H 15,  Features Intersected: MILLERS CREEK,  Facility Carried by Structure: ST. MARYS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 19 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $217,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $326,000
Find on map >>   Show street view

Structure Number: 395029,  Location: 10 MI N OF ST MARYS (Lat: 30.844539,  Lng: -81.561250),  Route carried "on" structure: County highway 116,  Year Built: 1982,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 470 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 705 (year 2032),  Design Load: HS 20,  Features Intersected: CROOKED RIVER TRIB.,  Facility Carried by Structure: MUSH BLUFF ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 37.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $156,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $234,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 395039,  Location: CITY LIMIT OF ST MARYS (Lat: 30.739950,  Lng: -81.561158),  Route carried "on" structure: City street 426,  Year Built: 1991,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 600 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2032),  Design Load: H 15,  Features Intersected: BORRELLS CREEK,  Facility Carried by Structure: BORRELL BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.0m,  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 31.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $117,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $176,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 395041,  Location: 4.5 MI W OF ST MARY'S (Lat: 30.760189,  Lng: -81.605758),  Route carried "on" structure: City street 6052,  Year Built: 1986,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 11,020 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 16,530 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: ST. MARYS RAILROAD,  Facility Carried by Structure: ST. MARYS RD (EBL)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.8m (55.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $586,000,  Roadway Improvement Cost: $59,000,  Total Project Cost: $879,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 395042,  Location: 4.5 MI W OF ST MARY'S (Lat: 30.760289,  Lng: -81.605950),  Route carried "on" structure: City street 6052,  Year Built: 1986,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 11,020 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 16,530 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: ST. MARYS RAILROAD,  Facility Carried by Structure: ST. MARYS RD (WBL)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.8m (55.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 15.0m (49.2ft),  Out-to-Out Width: 16.0m (52.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $746,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $1,119,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 395043,  Location: ST MARYS - NE SECTION (Lat: 30.780239,  Lng: -81.583039),  Route carried "on" structure: City street 570,  Year Built: 1987,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 2,020 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,030 (year 2032),  Design Load: HS 20,  Features Intersected: DARK ENTRY CREEK TRIB.,  Facility Carried by Structure: SUGAR MILL BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb or Sidewalk Widths: Left: 2.3m (7.5ft),  Right: 2.3m (7.5ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $164,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $246,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 395044,  Location: ST MARYS - NE SECTION (Lat: 30.769158,  Lng: -81.583589),  Route carried "on" structure: City street 570,  Year Built: 1987,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 2,300 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,450 (year 2032),  Design Load: HS 20,  Features Intersected: SCHOOLHOUSE CREEK O/F,  Facility Carried by Structure: SUGAR MILL BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.7m (44.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $176,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $264,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 395045,  Location: ST MARYS - NE SECTION (Lat: 30.768978,  Lng: -81.583769),  Route carried "on" structure: City street 570,  Year Built: 1987,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 2,300 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,450 (year 2032),  Design Load: HS 20,  Features Intersected: SCHOOLHOUSE CREEK,  Facility Carried by Structure: SUGAR MILL BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.1m (56.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $219,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $328,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 395046,  Location: ST MARYS - NE SECTION (Lat: 30.774228,  Lng: -81.580769),  Route carried "on" structure: City street 574,  Year Built: 1987,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 1,610 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,415 (year 2032),  Design Load: HS 20,  Features Intersected: DARK ENTRY CREEK TRIB.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.1m (33.1ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 0.0m,  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $129,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $193,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 395051,  Location: 5 MI NE OF ST MARYS (Lat: 30.760008,  Lng: -81.525139),  Route carried "on" structure: County highway 75,  Year Built: 2002,  Status: Open,  Structure Length: 7.92m (25.98ft),  Average Daily Traffic: 2,120 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,180 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: NORTH RIVER,  Facility Carried by Structure: N RIVER CAUSWAY DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 72.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: May 2021,  Underwater Inspection Date: May 2018,  Bridge Improvement Cost: $1,016,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $1,524,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 399002,  Location: I-95 / ST. MARY'S RIVER (Lat: 30.743611,  Lng: -81.654444),  Route carried "on" structure: Interstate 95,  Year Built: 1971,  Year Reconstructed: 1998,  Status: Open,  Structure Length: 38.10m (125.00ft),  Average Daily Traffic: 61,170 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 106,130 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: ST. MARY'S RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.294,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Navigation Control: Yes ( Vertical Clearance: 0.3m (1.0ft), Horizontal Clearance: 0.3m (1.0ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 9,  Length of Maximum Span: 46.9m (153.9ft),  Curb-To-Curb Width: 18.9m (62.0ft),  Out-to-Out Width: 20.0m (65.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 23 months,  Other Special Inspection Frequency: Every 4 months,  Inspection Date: May 2020,  Underwater Inspection Date: May 2020,  Other Special Inspection Date: January 2022,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 390057,  Location: 4.5 MI W OF ST MARYS (Lat: 30.761322,  Lng: -81.604894),  Route carried "under" structure: State highway 40,  Structure Length: 0. m,  Average Daily Traffic: 17,600 (year 1998),  Truck Traffic: 1%,  Features Intersected: ST. MARYS RD (EBL),  Facility Carried by Structure: ST. MARYS RD (EBL)
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 30.578,  Lanes on structure: 3,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 390058,  Location: 4.5 MI W OF ST MARYS (Lat: 30.761428,  Lng: -81.605156),  Route carried "under" structure: State highway 40,  Structure Length: 0. m,  Average Daily Traffic: 9,850 (year 1998),  Truck Traffic: 1%,  Features Intersected: ST. MARYS RD (WBL),  Facility Carried by Structure: ST. MARYS RD (WBL)
Minimum Vertical Clearance: 5.43m (17.81ft),  Kilometerpoint: 30.578,  Lanes on structure: 3,  Length of Maximum Span: 0.0m

Discuss St. Marys, Georgia (GA) on our hugely popular Georgia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.