Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Snohomish, Washington (WA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 17Number of bridges
  • 354ft / 108mTotal length
  • $88,490,000Total costs
  • 212,064Total average daily traffic
  • 18,382Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Snohomish
  • No street view available for this location

New bridges in Snohomish, WA - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 11920-1929
  • 21940-1949
  • 11950-1959
  • 31960-1969
  • 61980-1989
  • 21990-1999
  • 12000-2009
Average Bridge Daily Traffic in Snohomish, WA
Average Bridge Truck Traffic in Snohomish, WA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 7.7%Very good
  • 61.5%Good
  • 23.1%Satisfactory
  • 7.7%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 7.7%Very good
  • 38.5%Good
  • 46.2%Satisfactory
  • 7.7%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 7.7%Very good
  • 53.8%Good
  • 30.8%Satisfactory
  • 7.7%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 36.4%Very good
  • 36.4%Good
  • 9.1%Satisfactory
  • 18.2%Fair
Find on map >>   Show street view

Structure Number: 5727A,  Location: 2.2 N JCT SR 96 (Lat: 47.909750,  Lng: -122.108778),  Route carried "on" structure: State highway 9,  Year Built: 1959,  Status: Open,  Structure Length: 33.86m (111.09ft),  Average Daily Traffic: 28,344 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 41,042 (year 2039),  Design Load: HS 20,  Features Intersected: SNOHOMISH RIVER
Minimum Vertical Clearance: 4.70m (15.42ft),  Kilometerpoint: 14.758,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Navigation Control: Yes ( Vertical Clearance: 6.7m (22.0ft), Horizontal Clearance: 90.2m (295.9ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 10,  Length of Maximum Span: 91.4m (299.9ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 33.86m (111.09ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2020,  Critical Feature Inspection Date: October 2020,  Underwater Inspection Date: July 2020,  Bridge Improvement Cost: $10,221,000,  Roadway Improvement Cost: $2,044,000,  Total Project Cost: $20,442,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 6347A,  Location: 1.9 N JCT SR 96 (Lat: 47.905500,  Lng: -122.109028),  Route carried "on" structure: State highway 9,  Year Built: 1960,  Status: Open,  Structure Length: 11.31m (37.11ft),  Average Daily Traffic: 28,344 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 41,042 (year 2039),  Design Load: HS 20,  Features Intersected: SNOHOMISH R OVERFLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.291,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 14,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 28.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.31m (37.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $3,413,000,  Roadway Improvement Cost: $683,000,  Total Project Cost: $6,826,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 7157B,  Location: 2.6 N JCT SR 96 (Lat: 47.915656,  Lng: -122.108578),  Route carried "on" structure: State highway 9,  Year Built: 1963,  Status: Open,  Structure Length: 6.40m (21.00ft),  Average Daily Traffic: 20,234 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 29,298 (year 2039),  Design Load: HS 20,  Features Intersected: 2ND ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.385,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.0m (82.0ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.40m (21.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $1,932,000,  Roadway Improvement Cost: $386,000,  Total Project Cost: $3,864,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 12050A,  Location: 2.1 E JCT SR 9 (Lat: 47.935000,  Lng: -122.070000),  Route carried "on" structure: County highway ,  Year Built: 1983,  Status: Open,  Structure Length: 6.68m (21.92ft),  Average Daily Traffic: 4,660 (year 2002),  Truck Traffic: 3%,  Average Future Daily Traffic: 9,492 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: US 2,  Facility Carried by Structure: THREE LAKES RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.402,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.2m (99.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 51.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 39.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.68m (21.92ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,927,000,  Roadway Improvement Cost: $385,000,  Total Project Cost: $3,854,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 12149A,  Location: 3.3 E JCT SR 9 (Lat: 47.915614,  Lng: -122.072203),  Route carried "on" structure: County highway 2,  Year Built: 1983,  Status: Open,  Structure Length: 6.19m (20.31ft),  Average Daily Traffic: 8,656 (year 2012),  Truck Traffic: 3%,  Average Future Daily Traffic: 13,642 (year 2036),  Design Load: HS 20,  Features Intersected: US 2,  Facility Carried by Structure: 88TH ST SE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.19m (20.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,705,000,  Roadway Improvement Cost: $341,000,  Total Project Cost: $3,410,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 80748,  Location: 0.5 S JCT Three Lk Rd/SR2 (Lat: 47.927989,  Lng: -122.072044),  Route carried "on" structure: County highway 46760,  Year Built: 1964,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 15 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 50 (year 2043),  Design Load: H 15,  Features Intersected: TRIB. PILCHUCK RIVER,  Facility Carried by Structure: 120TH AVE. SE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.01m (3.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $502,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,003,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 81565,  Location: 1.1 N JCT SR#9 (Lat: 47.910189,  Lng: -122.098711),  Route carried "on" structure: County highway 24140,  Year Built: 1983,  Status: Open,  Structure Length: 10.97m (35.99ft),  Average Daily Traffic: 18,119 (year 2017),  Truck Traffic: 11%,  Average Future Daily Traffic: 20,000 (year 2038),  Design Load: HS 20,  Features Intersected: SNOHOMISH R.,  Facility Carried by Structure: AIRPORT WAY
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 0.001,  Lanes on structure: 3,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 48.8m (160.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 15.1m (49.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.28m (37.01ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: April 2020,  Critical Feature Inspection Date: July 2020,  Underwater Inspection Date: July 2019,  Bridge Improvement Cost: $7,400,000,  Roadway Improvement Cost: $1,480,000,  Total Project Cost: $14,800,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 82311,  Location: 0.7 SE JCT SR 2 (Lat: 47.918714,  Lng: -122.083217),  Route carried "on" structure: County highway 46700,  Year Built: 1924,  Status: Open,  Structure Length: 6.95m (22.80ft),  Average Daily Traffic: 421 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,000 (year 2042),  Design Load: HS 15,  Features Intersected: PILCHUCK RIVER,  Facility Carried by Structure: 86TH ST SE
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 6,  Length of Maximum Span: 38.4m (126.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 5.4m (17.7ft),  Out-to-Out Width: 6.0m (19.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.25m (23.79ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Critical Feature Inspection Date: July 2020,  Bridge Improvement Cost: $3,618,000,  Roadway Improvement Cost: $724,000,  Total Project Cost: $7,235,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 82328,  Location: 0.38W INT SR-2 (Lat: 47.913306,  Lng: -122.079792),  Route carried "on" structure: County highway 46440,  Year Built: 1948,  Status: Open,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 15,682 (year 2017),  Truck Traffic: 11%,  Average Future Daily Traffic: 20,000 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: OVERFLOW CHANNEL,  Facility Carried by Structure: 92 ND ST SE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.87m (9.42ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,429,000,  Roadway Improvement Cost: $286,000,  Total Project Cost: $2,858,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 82334,  Location: 0.54 W INT SR2 (Lat: 47.913072,  Lng: -122.082850),  Route carried "on" structure: County highway 46440,  Year Built: 1948,  Status: Open,  Structure Length: 7.01m (23.00ft),  Average Daily Traffic: 13,700 (year 2019),  Truck Traffic: 19%,  Average Future Daily Traffic: 20,000 (year 2042),  Design Load: H 20,  Features Intersected: PILCHUCK R.,  Facility Carried by Structure: 92 ND ST SE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 22.6m (74.1ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.32m (24.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $3,648,000,  Roadway Improvement Cost: $730,000,  Total Project Cost: $7,296,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 85951,  Location: 1.9 N JCT SR 2 (Lat: 47.934722,  Lng: -122.073889),  Route carried "on" structure: County highway 94710,  Year Built: 1992,  Status: Open,  Structure Length: 6.46m (21.19ft),  Average Daily Traffic: 4,922 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 8,000 (year 2042),  Design Load: HS 20,  Features Intersected: PILCHUCK RIVER,  Facility Carried by Structure: THREE LAKES RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 38.1m (125.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.77m (22.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $3,374,000,  Roadway Improvement Cost: $675,000,  Total Project Cost: $6,749,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 86357,  Location: 0.1 SW INT SR2 (Lat: 47.913750,  Lng: -122.075694),  Route carried "on" structure: County highway 46440,  Year Built: 1986,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 13,397 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 20,000 (year 2043),  Features Intersected: PILCHUCK R. OVERFLOW,  Facility Carried by Structure: 92ND ST SE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $912,000,  Roadway Improvement Cost: $182,000,  Total Project Cost: $1,824,000 ( Estimate for 2014)
Find on map >>   Show street view

Structure Number: 86404,  Location: 0.8 S JCT SR 2 (Lat: 47.901589,  Lng: -122.087192),  Route carried "on" structure: County highway 92665,  Year Built: 1999,  Status: Open,  Structure Length: 4.21m (13.81ft),  Average Daily Traffic: 4,211 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 7,500 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: PILCHUCK RIVER,  Facility Carried by Structure: SNOHOMISH MNRO RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 94.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.51m (14.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,250,000,  Roadway Improvement Cost: $450,000,  Total Project Cost: $4,499,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 86518,  Location: 1.8 S JCT SR2 (Lat: 47.889703,  Lng: -122.073981),  Route carried "on" structure: County highway 92665,  Year Built: 2000,  Status: Open,  Structure Length: 3.54m (11.61ft),  Average Daily Traffic: 4,129 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 7,000 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: FRENCH CREEK,  Facility Carried by Structure: SNOHOMISH-MONRO RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 33.8m (110.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 93.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.84m (12.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,915,000,  Roadway Improvement Cost: $383,000,  Total Project Cost: $3,830,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 12050A,  Location: 2.1 E JCT SR 9 (Lat: 47.935000,  Lng: -122.070000),  Route carried "under" structure: US 2,  Year Built: 1983,  Structure Length: 0. m,  Average Daily Traffic: 23,231 (year 2019),  Truck Traffic: 7%,  Features Intersected: US 2,  Facility Carried by Structure: THREE LAKES RD
Minimum Vertical Clearance: 7.57m (24.84ft),  Kilometerpoint: 11.442,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 12149A,  Location: 3.3 E JCT SR 9 (Lat: 47.915614,  Lng: -122.072203),  Route carried "under" structure: US 2,  Year Built: 1983,  Structure Length: 0. m,  Average Daily Traffic: 19,788 (year 2019),  Truck Traffic: 7%,  Features Intersected: US 2,  Facility Carried by Structure: 88TH ST SE
Minimum Vertical Clearance: 7.44m (24.41ft),  Kilometerpoint: 13.696,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 82486,  Location: 0.6 S JCT SR 2 (Lat: 47.903422,  Lng: -122.087414),  Route carried "under" structure: County highway 92665,  Year Built: 1910,  Structure Length: 0. m,  Average Daily Traffic: 4,211 (year 2019),  Truck Traffic: 9%,  Features Intersected: LINCOLN AVE.,  Facility Carried by Structure: BNSF RR
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 0.001,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 9.4m (30.8ft)

Discuss Snohomish, Washington (WA) on our hugely popular Washington forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.