Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Smithfield, Rhode Island (RI)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 33Number of bridges
  • 295ft / 89.5mTotal length
  • $53,252,000Total costs
  • 405,342Total average daily traffic
  • 22,489Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Smithfield
  • No street view available for this location

New bridges in Smithfield, RI - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 21920-1929
  • 21930-1939
  • 21960-1969
  • 191970-1979
  • 11980-1989
  • 22000-2009
  • 32010-2019
  • 12020-2022
Reconstructed bridges in Smithfield, RI - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11930-1939
  • 01940-1949
  • 01950-1959
  • 01960-1969
  • 01970-1979
  • 31980-1989
  • 01990-1999
  • 12000-2009
Average Bridge Daily Traffic in Smithfield, RI
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 16.0%Very good
  • 28.0%Good
  • 32.0%Satisfactory
  • 24.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 12.0%Very good
  • 20.0%Good
  • 40.0%Satisfactory
  • 28.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 4.0%Excellent
  • 8.0%Very good
  • 4.0%Good
  • 32.0%Satisfactory
  • 48.0%Fair
  • 4.0%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 14.3%Very good
  • 28.6%Good
  • 35.7%Satisfactory
  • 21.4%Fair
Find on map >>   Show street view

Structure Number: 123,  Location: 1.5 Mi W of JCT RI 136 (Lat: 41.736700,  Lng: -71.296000),  Route carried "on" structure: State highway 114,  Year Built: 2009,  Status: Open,  Structure Length: 13.14m (43.11ft),  Average Daily Traffic: 14,763 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 16,239 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: BARRINGTON RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.263,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 19.5m (64.0ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 52.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.24m (17.19ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Underwater Inspection Date: April 2021,  Bridge Improvement Cost: $4,751,000,  Roadway Improvement Cost: $475,000,  Total Project Cost: $7,127,000,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 144,  Location: 0.6 Mi N of JCT RI 116 (Lat: 41.908669,  Lng: -71.540706),  Route carried "on" structure: Alternate State highway 104,  Year Built: 2000,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 6,600 (year 2021),  Truck Traffic: 11%,  Average Future Daily Traffic: 7,260 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: WOONASQUATUCKET RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.388,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 96.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $239,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $359,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 155,  Location: 1.0 Mi W of JCT RI 116 (Lat: 41.877389,  Lng: -71.570469),  Route carried "on" structure: US 44,  Year Built: 1918,  Year Reconstructed: 1936,  Status: Posted for load-capacity,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 15,715 (year 2021),  Truck Traffic: 9%,  Average Future Daily Traffic: 17,287 (year 2041),  Design Load: H 20,  Features Intersected: MILL CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.084,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 5 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 22.2m (72.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Testing,  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load Testing,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: November 2020,  Underwater Inspection Date: September 2021,  Bridge Improvement Cost: $352,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $528,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 159,  Location: 0.1 Mi N of High St (Lat: 41.880717,  Lng: -71.502569),  Route carried "on" structure: State highway 104,  Year Built: 1939,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 4,974 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 5,471 (year 2041),  Design Load: H 20,  Features Intersected: WOONASQUATUCKET RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.897,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.0m (59.1ft),  Curb or Sidewalk Widths: Left: 1.3m (4.3ft),  Right: 1.3m (4.3ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 33.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 25.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $664,000,  Roadway Improvement Cost: $66,000,  Total Project Cost: $996,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 248,  Location: 0.5 Mi S of JCT RI 104 (Lat: 41.898875,  Lng: -71.543044),  Route carried "on" structure: State highway 116,  Year Built: 1929,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 10,415 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 11,457 (year 2041),  Design Load: H 20,  Features Intersected: STILLWATER RESERVOIR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.825,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 47.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: November 2020,  Underwater Inspection Date: November 2020,  Bridge Improvement Cost: $269,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $404,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 249,  Location: 1.1 Mi N of JCT US 44 (Lat: 41.884967,  Lng: -71.541264),  Route carried "on" structure: State highway 5,  Year Built: 1929,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 15,861 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 17,447 (year 2041),  Design Load: H 20,  Features Intersected: GREENVILLE BROOK,  Facility Carried by Structure: RI 116 PLSNT VW AV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.213,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 31.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $63,000,  Roadway Improvement Cost: $6,000,  Total Project Cost: $95,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 278,  Location: 0.5 Mi S of JCT RI 7 (Lat: 41.908342,  Lng: -71.536397),  Route carried "on" structure: State highway 116,  Year Built: 1932,  Year Reconstructed: 2012,  Status: Open,  Structure Length: 13.69m (44.91ft),  Average Daily Traffic: 9,419 (year 2021),  Truck Traffic: 9%,  Average Future Daily Traffic: 10,361 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: STILLWATER RESERVOIR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.653,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 12,  Length of Maximum Span: 36.3m (119.1ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 36.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 28.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.69m (44.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $5,821,000,  Roadway Improvement Cost: $582,000,  Total Project Cost: $8,732,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 741,  Location: 1.0 Mi E of JCT RI 116 (Lat: 41.869375,  Lng: -71.514969),  Route carried "on" structure: US 44,  Year Built: 1971,  Status: Open,  Structure Length: 7.68m (25.20ft),  Average Daily Traffic: 37,105 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 40,816 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: I-295 NB & SB
Minimum Vertical Clearance: 5.46m (17.91ft),  Kilometerpoint: 25.873,  Lanes on structure: 6,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 28.7m (94.2ft),  Skew: 31 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 38.1m (125.0ft),  Curb-To-Curb Width: 28.7m (94.2ft),  Out-to-Out Width: 30.3m (99.4ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 33.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 25.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.59m (24.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $4,847,000,  Roadway Improvement Cost: $485,000,  Total Project Cost: $7,270,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 742,  Location: 0.5 Mi N of JCT US 44 (Lat: 41.876697,  Lng: -71.515006),  Route carried "on" structure: Interstate 295,  Year Built: 1971,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 26,447 (year 2015),  Truck Traffic: 3%,  Average Future Daily Traffic: 31,737 (year 2036),  Design Load: HS 20+Mod,  Features Intersected: MOUNTAINDALE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.666,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.1m (65.9ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 17.5m (57.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 37.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 24.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.62m (8.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $772,000,  Roadway Improvement Cost: $77,000,  Total Project Cost: $1,158,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 7422,  Location: 0.5 Mi N Of JCT US 44 (Lat: 41.876661,  Lng: -71.515619),  Route carried "on" structure: Interstate 295,  Year Built: 1971,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 26,447 (year 2008),  Truck Traffic: 10%,  Average Future Daily Traffic: 31,737 (year 2036),  Design Load: HS 20+Mod,  Features Intersected: MOUNTAINDALE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.510,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.1m (65.9ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 17.5m (57.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.62m (8.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $955,000,  Roadway Improvement Cost: $96,000,  Total Project Cost: $1,433,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 743,  Location: 1.0 Mi S of JCT RI 5 (Lat: 41.895883,  Lng: -71.522908),  Route carried "on" structure: State highway 104,  Year Built: 1974,  Status: Open,  Structure Length: 4.59m (15.06ft),  Average Daily Traffic: 5,070 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,577 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: I-295 NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.285,  Lanes on structure: 2,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 43.9m (144.0ft),  Curb-To-Curb Width: 14.3m (46.9ft),  Out-to-Out Width: 15.3m (50.2ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 37.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.51m (14.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,446,000,  Roadway Improvement Cost: $145,000,  Total Project Cost: $2,169,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 7432,  Location: 1.0 Mi S of JCT RI 5 (Lat: 41.896403,  Lng: -71.523567),  Route carried "on" structure: State highway 104,  Year Built: 1974,  Status: Open,  Structure Length: 4.35m (14.27ft),  Average Daily Traffic: 5,070 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,577 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: I-295 SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.369,  Lanes on structure: 2,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 41.6m (136.5ft),  Curb-To-Curb Width: 14.3m (46.9ft),  Out-to-Out Width: 15.3m (50.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 41.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.30m (14.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,378,000,  Roadway Improvement Cost: $138,000,  Total Project Cost: $2,066,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 744,  Location: 0.6 Mi S of JCT RI 7 (Lat: 41.901683,  Lng: -71.520286),  Route carried "on" structure: Interstate 295,  Year Built: 1973,  Status: Open,  Structure Length: 1.14m (3.74ft),  Average Daily Traffic: 1,900 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,090 (year 2041),  Design Load: HS 20,  Features Intersected: WOONASQUATUCKET RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.599,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 30.5m (100.1ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.5m (18.0ft),  Curb-To-Curb Width: 30.5m (100.1ft),  Out-to-Out Width: 30.5m (100.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,550,000,  Roadway Improvement Cost: $155,000,  Total Project Cost: $2,326,000
Find on map >>   Show street view

Structure Number: 745,  Location: 0.5 Mi S of JCT RI 7 (Lat: 41.903058,  Lng: -71.518044),  Route carried "on" structure: Interstate 295,  Year Built: 1970,  Status: Open,  Structure Length: 2.38m (7.81ft),  Average Daily Traffic: 8,922 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 9,814 (year 2041),  Design Load: HS 20,  Features Intersected: STILLWATER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.838,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.6m (54.5ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 16.6m (54.5ft),  Out-to-Out Width: 17.5m (57.4ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 59.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 46.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.38m (7.81ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: December 2020,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $868,000,  Roadway Improvement Cost: $87,000,  Total Project Cost: $1,302,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 7452,  Location: 0.5 Mi S of JCT RI 7 (Lat: 41.903311,  Lng: -71.518544),  Route carried "on" structure: Interstate 295,  Year Built: 1970,  Status: Open,  Structure Length: 2.38m (7.81ft),  Average Daily Traffic: 26,447 (year 2008),  Truck Traffic: 10%,  Average Future Daily Traffic: 31,737 (year 2036),  Design Load: HS 20,  Features Intersected: STILLWATER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.307,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.6m (54.5ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 16.6m (54.5ft),  Out-to-Out Width: 17.5m (57.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 61.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 47.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.38m (7.81ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: December 2020,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $868,000,  Roadway Improvement Cost: $87,000,  Total Project Cost: $1,302,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 746,  Location: 0.5 Mi S of JCT RI 146 (Lat: 41.908522,  Lng: -71.511844),  Route carried "on" structure: State highway 7,  Year Built: 1971,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 22,467 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 24,714 (year 2041),  Design Load: HS 20,  Features Intersected: I-295 SB
Minimum Vertical Clearance: 6.02m (19.75ft),  Kilometerpoint: 11.890,  Lanes on structure: 6,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 28.3m (92.8ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.2m (99.1ft),  Curb-To-Curb Width: 28.3m (92.8ft),  Out-to-Out Width: 30.3m (99.4ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 39.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 30.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.14m (10.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,979,000,  Roadway Improvement Cost: $198,000,  Total Project Cost: $2,969,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 7462,  Location: 0.5 Mi S of JCT RI 146 (Lat: 41.908022,  Lng: -71.511294),  Route carried "on" structure: State highway 7,  Year Built: 1971,  Status: Open,  Structure Length: 3.07m (10.07ft),  Average Daily Traffic: 22,467 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 24,714 (year 2041),  Design Load: HS 20,  Features Intersected: I-295 NB
Minimum Vertical Clearance: 6.04m (19.82ft),  Kilometerpoint: 11.957,  Lanes on structure: 6,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 28.3m (92.8ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.2m (99.1ft),  Curb-To-Curb Width: 28.3m (92.8ft),  Out-to-Out Width: 30.3m (99.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Operating Rating: 38.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 29.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.11m (10.20ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: May 2021,  Other Special Inspection Date: May 2021,  Bridge Improvement Cost: $1,960,000,  Roadway Improvement Cost: $196,000,  Total Project Cost: $2,940,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 747,  Location: 1.0 Mi W of RI 123 (Lat: 41.925028,  Lng: -71.505286),  Route carried "on" structure: State highway 116,  Year Built: 1967,  Year Reconstructed: 1987,  Status: Temporarily open,  Structure Length: 10.06m (33.01ft),  Average Daily Traffic: 13,988 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 15,387 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: I-295 NB & SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.874,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 39.3m (128.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 41.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.81m (32.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $3,103,000,  Roadway Improvement Cost: $310,000,  Total Project Cost: $4,654,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 7925,  Location: 1.0 Mi E of JCT RI 104 (Lat: 41.902778,  Lng: -71.521667),  Route carried "on" structure: City street ,  Year Built: 2017,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 1,396 (year 2021),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,536 (year 2041),  Design Load: HL 93,  Features Intersected: WOONASQUATUCKET RIVER,  Facility Carried by Structure: CAPRON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.159,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 6 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 0.0m,  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 60.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 46.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.13m (3.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $510,000,  Roadway Improvement Cost: $51,000,  Total Project Cost: $56,000 ( Estimate for 2017),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 797,  Location: 1.0 Mi S of JCT RI 116 (Lat: 41.909300,  Lng: -71.513931),  Route carried "on" structure: Ramp State highway 7,  Year Built: 1975,  Status: Open,  Structure Length: 3.87m (12.70ft),  Average Daily Traffic: 6,862 (year 2021),  Truck Traffic: 9%,  Average Future Daily Traffic: 7,548 (year 2041),  Design Load: HS 20,  Features Intersected: RAMP 5 of I-295 to RI 7
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.135,  Lanes on structure: 1,  Lanes under structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 38.1m (125.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 51.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 39.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.87m (12.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $774,000,  Roadway Improvement Cost: $77,000,  Total Project Cost: $1,161,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Membrane: Other
Find on map >>   Show street view

Structure Number: 798,  Location: 0.5 Mi E of JCT RI 116 (Lat: 41.907544,  Lng: -71.514214),  Route carried "on" structure: Ramp State highway 7,  Year Built: 1976,  Status: Open,  Structure Length: 3.23m (10.60ft),  Average Daily Traffic: 3,400 (year 2008),  Truck Traffic: 10%,  Average Future Daily Traffic: 4,080 (year 2036),  Design Load: HS 20,  Features Intersected: RAMP 5 of I-295 to RI 7
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.328,  Lanes on structure: 1,  Lanes under structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.7m (104.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 51.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 39.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 3.26m (10.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $977,000,  Roadway Improvement Cost: $98,000,  Total Project Cost: $1,466,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 947,  Location: 0.1 Mi E of JCT RI 104 (Lat: 41.886844,  Lng: -71.505256),  Route carried "on" structure: City street ,  Year Built: 1980,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 2,125 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,338 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: WOONASQUATUCKET RIVER,  Facility Carried by Structure: WHIPPLE AV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.433,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 81.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $366,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $549,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 948,  Location: 0.1 Mi S of JCT RI 104 (Lat: 41.878400,  Lng: -71.501547),  Route carried "on" structure: City street ,  Year Built: 1979,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 7,850 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 8,635 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: WOONASQUATUCKET RIVER,  Facility Carried by Structure: ESMOND ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.207,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 69.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 53.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.46m (4.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $120,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $180,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 11365,  Location: 400ft sw Sergueville rd (Lat: 41.886108,  Lng: -71.536383),  Route carried "on" structure: City street ,  Year Built: 2017,  Status: Open,  Structure Length: 0.92m (3.02ft),  Average Daily Traffic: 579 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 637 (year 2041),  Design Load: HL 93,  Features Intersected: Reaper Brook,  Facility Carried by Structure: Mountaindale Rd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.799,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.7m (25.3ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 51.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Other
Find on map >>   Show street view

Structure Number: 123,  Location: 0.2 mi W of Limerock Rd (Lat: 41.898942,  Lng: -71.509889),  Route carried "on" structure: City street ,  Year Built: 2015,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 1,486 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,635 (year 2041),  Design Load: HL 93,  Features Intersected: Harris Brook,  Facility Carried by Structure: STILLWATER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.398,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.7m (38.4ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 57.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 44.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 12445,  Location: 0.1M West of RI104 (Lat: 41.873639,  Lng: -71.497092),  Route carried "on" structure: City street ,  Year Built: 2021,  Status: Open,  Structure Length: 1.44m (4.72ft),  Average Daily Traffic: 500 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 610 (year 2038),  Design Load: Greater than HL93,  Features Intersected: Woonasquatucket River,  Facility Carried by Structure: Esmond Mill Dr
Minimum Vertical Clearance: 30.45m (99.90ft),  Kilometerpoint: 0.103,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.2m (43.3ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 64.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 40.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.04m (3.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $2,000,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $2,010,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 741,  Location: 1.0 Mi E of JCT RI 116 (Lat: 41.869375,  Lng: -71.514969),  Route carried "under" structure: Interstate 295,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 37,105 (year 2021),  Truck Traffic: 2%,  Features Intersected: I-295 NB & SB,  Facility Carried by Structure: US 44 PUTNAM PIKE
Minimum Vertical Clearance: 4.97m (16.31ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 8,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.1m (125.0ft)

Find on map >>   Show street view

Structure Number: 743,  Location: 1.0 Mi S of JCT RI 5 (Lat: 41.895883,  Lng: -71.522908),  Route carried "under" structure: Interstate 295,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 5,070 (year 2021),  Truck Traffic: 6%,  Features Intersected: I-295 NB,  Facility Carried by Structure: RI 104 FARNUM PIKE
Minimum Vertical Clearance: 5.75m (18.86ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 43.9m (144.0ft)

Find on map >>   Show street view

Structure Number: 7432,  Location: 1.0 Mi S of JCT RI 5 (Lat: 41.896403,  Lng: -71.523567),  Route carried "under" structure: Interstate 295,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 5,070 (year 2021),  Truck Traffic: 6%,  Features Intersected: I-295 SB,  Facility Carried by Structure: RI 104 FARNUM PIKE
Minimum Vertical Clearance: 7.52m (24.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.6m (136.5ft)

Find on map >>   Show street view

Structure Number: 746,  Location: 0.5 Mi S of JCT RI 146 (Lat: 41.908522,  Lng: -71.511844),  Route carried "under" structure: Interstate 295,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 22,467 (year 2021),  Truck Traffic: 4%,  Features Intersected: I-295 SB,  Facility Carried by Structure: RI 7 DOUGLAS PIKE
Minimum Vertical Clearance: 4.97m (16.31ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 7462,  Location: 0.5 Mi S of JCT RI 146 (Lat: 41.908022,  Lng: -71.511294),  Route carried "under" structure: Interstate 295,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 22,467 (year 2021),  Truck Traffic: 4%,  Features Intersected: I-295 NB,  Facility Carried by Structure: RI 7 DOUGLAS PIKE
Minimum Vertical Clearance: 4.97m (16.31ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 747,  Location: 1.0 Mi W of RI 123 (Lat: 41.925028,  Lng: -71.505286),  Route carried "under" structure: Interstate 295,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 13,988 (year 2021),  Truck Traffic: 8%,  Features Intersected: I-295 NB & SB,  Facility Carried by Structure: RI 116 G WASH HWY
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.3m (128.9ft)

Find on map >>   Show street view

Structure Number: 798,  Location: 0.5 Mi E of JCT RI 116 (Lat: 41.907544,  Lng: -71.514214),  Route carried "under" structure: Ramp Interstate 295,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 900 (year 2008),  Truck Traffic: 10%,  Features Intersected: RAMP 5 of I-295 to RI 7
Minimum Vertical Clearance: 7.12m (23.36ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.7m (104.0ft)

Discuss Smithfield, Rhode Island (RI) on our hugely popular Rhode Island forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.