Bridge Statistics for Shrewsbury, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 19Number of bridges
  • 469ft / 143mTotal length
  • $76,353,000Total costs
  • 545,810Total average daily traffic
  • 42,290Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Shrewsbury
  • No street view available for this location

New bridges in Shrewsbury, MA - historical statistics
  • New bridges - historical statistics
  • 21930-1939
  • 121960-1969
  • 11990-1999
  • 22000-2009
  • 22010-2019
Average Bridge Daily Traffic in Shrewsbury, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 7.1%Very good
  • 35.7%Good
  • 42.9%Satisfactory
  • 14.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 17.6%Very good
  • 35.3%Good
  • 35.3%Satisfactory
  • 5.9%Fair
  • 5.9%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 11.8%Very good
  • 35.3%Good
  • 17.6%Satisfactory
  • 35.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 87.5%Good
  • 12.5%Satisfactory
Find on map >>   Show street view

Structure Number: S14001BEWDOTNBI,  Location: 100 F.T. E. OF LAKE AVE. (Lat: 42.274372,  Lng: -71.755153),  Route carried "on" structure: State highway 9,  Year Built: 2016,  Status: Open,  Structure Length: 26.91m (88.29ft),  Average Daily Traffic: 29,900 (year 2016),  Truck Traffic: 4%,  Design Load: HL 93,  Features Intersected: WATER LAKE QUINSIGAMOND
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 159.723,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Steel continuous,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 73.2m (240.2ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 18.0m (59.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 48.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: March 2020,  Critical Feature Inspection Date: March 2020,  Underwater Inspection Date: June 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: S14001BL6DOTNBI,  Location: 100 F.T. E. OF LAKE AVE. (Lat: 42.274294,  Lng: -71.755153),  Route carried "on" structure: State highway 9,  Year Built: 2015,  Status: Open,  Structure Length: 26.51m (86.98ft),  Average Daily Traffic: 27,700 (year 2016),  Truck Traffic: 1%,  Design Load: HL 93,  Features Intersected: WATER LAKE QUINSIGAMOND
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 159.723,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Steel continuous,  Design/Construction: Arch - Deck,  Length of Maximum Span: 73.2m (240.2ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 19.2m (63.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 51.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: March 2020,  Critical Feature Inspection Date: March 2020,  Underwater Inspection Date: June 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: S140071M0DOTNBI,  Location: ST 9/ST 140 (Lat: 42.276847,  Lng: -71.710558),  Route carried "on" structure: State highway 9,  Year Built: 1932,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 50,103 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 71,384 (year 2031),  Design Load: H 20,  Features Intersected: ST140 GRAFTON ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 163.634,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 21.3m (69.9ft),  Out-to-Out Width: 22.6m (74.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 49.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,155,000,  Roadway Improvement Cost: $116,000,  Total Project Cost: $1,733,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: S14008AGMDOTNBI,  Location: 1.5 MI. E. OF ST-122 (Lat: 42.246956,  Lng: -71.729925),  Route carried "on" structure: US 20,  Year Built: 2001,  Status: Open,  Structure Length: 2.97m (9.74ft),  Average Daily Traffic: 30,537 (year 2018),  Truck Traffic: 15%,  Average Future Daily Traffic: 63,172 (year 2032),  Design Load: HS 20,  Features Intersected: WATER FLINT POND
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 186.647,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.2m (92.5ft),  Curb or Sidewalk Widths: Left: 2.7m (8.9ft),  Right: 2.7m (8.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 19.7m (64.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 61.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: S14009B74MUNNBI,  Location: .45 MI S OF US-20 (Lat: 42.256569,  Lng: -71.690294),  Route carried "on" structure: City street ,  Year Built: 2004,  Status: Open,  Structure Length: 1.15m (3.77ft),  Average Daily Traffic: 4,647 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 790 (year 2032),  Design Load: HS 20,  Features Intersected: WATER PRATTS POND INLET,  Facility Carried by Structure: HWY CENTECH BLVD
Minimum Vertical Clearance: 99.00m (324.80ft),  Kilometerpoint: 0.250,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 10.9m (35.8ft),  Material/Design: Steel,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 11.5m (37.7ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 10.9m (35.8ft),  Out-to-Out Width: 21.9m (71.9ft)

Condition: Superstructure: Poor,  Substructure: Very good,  Channel: Good,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Other Special Inspection Date: July 2021,  Bridge Improvement Cost: $1,033,000,  Roadway Improvement Cost: $104,000,  Total Project Cost: $1,550,000 ( Estimate for 2022),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: S140121D7MUNNBI,  Location: .2 MI. N. OF I-290 (Lat: 42.297856,  Lng: -71.754106),  Route carried "on" structure: City street ,  Year Built: 1939,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 21,580 (year 2014),  Truck Traffic: 6%,  Average Future Daily Traffic: 34,081 (year 2031),  Design Load: HS 20,  Features Intersected: WATER LAKE QUINSIGAMOND,  Facility Carried by Structure: HWY W MAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.435,  Lanes on structure: 4,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 19.8m (65.0ft)

Condition: Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Inventory Rating: 70.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: May 2020,  Underwater Inspection Date: May 2020,  Bridge Improvement Cost: $340,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $511,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: S140151YGDOTNBI,  Location: 1 MI S OF ST-9 (Lat: 42.250206,  Lng: -71.711536),  Route carried "on" structure: State highway 140,  Year Built: 1966,  Status: Open,  Structure Length: 3.57m (11.71ft),  Average Daily Traffic: 10,958 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 15,793 (year 2032),  Design Load: H 20,  Features Intersected: US 20 HARTFORD TNPK
Minimum Vertical Clearance: 6.10m (20.01ft),  Kilometerpoint: 114.086,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 52.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.60m (11.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,334,000,  Roadway Improvement Cost: $234,000,  Total Project Cost: $3,502,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: S140171RGDOTNBI,  Location: I-290 MM 11.9 (Lat: 42.311528,  Lng: -71.730367),  Route carried "on" structure: Interstate 290,  Year Built: 1967,  Status: Open,  Structure Length: 2.62m (8.60ft),  Average Daily Traffic: 40,500 (year 2018),  Truck Traffic: 15%,  Average Future Daily Traffic: 58,861 (year 2033),  Design Load: HS 20+Mod,  Features Intersected: HWY GULF ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.154,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.7m (81.0ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 63.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.70m (8.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $815,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $1,223,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: S140171RHDOTNBI,  Location: 1 MI W OF ST-140 (Lat: 42.312147,  Lng: -71.731086),  Route carried "on" structure: Interstate 290,  Year Built: 1967,  Status: Open,  Structure Length: 2.53m (8.30ft),  Average Daily Traffic: 43,286 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 58,861 (year 2033),  Design Load: HS 20+Mod,  Features Intersected: HWY GULF ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.154,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.8m (78.1ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 63.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.60m (8.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $785,000,  Roadway Improvement Cost: $79,000,  Total Project Cost: $1,178,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: S140181YHDOTNBI,  Location: 1.8 MI. N. OF MAIN ST. (Lat: 42.321492,  Lng: -71.719178),  Route carried "on" structure: State highway 140,  Year Built: 1967,  Year Reconstructed: 2021,  Status: Open,  Structure Length: 7.95m (26.08ft),  Average Daily Traffic: 13,205 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 23,690 (year 2033),  Design Load: HL 93,  Features Intersected: I 290
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 122.130,  Lanes on structure: 4,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 21 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 38.8m (127.3ft),  Curb or Sidewalk Widths: Left: 2.9m (9.5ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 9.9m (32.5ft),  Out-to-Out Width: 26.9m (88.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 45.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: S140211RADOTNBI,  Location: I-290 MM 10 (Lat: 42.293667,  Lng: -71.757183),  Route carried "on" structure: Interstate 290,  Year Built: 1968,  Status: Open,  Structure Length: 25.76m (84.51ft),  Average Daily Traffic: 37,700 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 66,331 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: COMB LK QUINSIG&LK AV N
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.864,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 1,  Length of Maximum Span: 104.2m (341.9ft),  Curb-To-Curb Width: 15.5m (50.9ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 60.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 25.80m (84.65ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: August 2020,  Underwater Inspection Date: September 2020,  Bridge Improvement Cost: $17,330,000,  Roadway Improvement Cost: $1,734,000,  Total Project Cost: $25,996,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: S140211RBDOTNBI,  Location: .1 MI W OF W MAIN ST (Lat: 42.293847,  Lng: -71.757406),  Route carried "on" structure: Interstate 290,  Year Built: 1969,  Status: Open,  Structure Length: 25.76m (84.51ft),  Average Daily Traffic: 41,273 (year 2019),  Truck Traffic: 15%,  Average Future Daily Traffic: 66,331 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: COMB LK QUINSIG&LK AV N
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.864,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Skew: 11 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 1,  Length of Maximum Span: 104.2m (341.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 15.5m (50.9ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 60.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 25.80m (84.65ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: August 2020,  Underwater Inspection Date: September 2020,  Bridge Improvement Cost: $17,330,000,  Roadway Improvement Cost: $1,734,000,  Total Project Cost: $25,996,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: S140221RCDOTNBI,  Location: 1.5 MI.NTH.OF ST.9 (Lat: 42.294244,  Lng: -71.753736),  Route carried "on" structure: Interstate 290,  Year Built: 1968,  Status: Open,  Structure Length: 2.71m (8.89ft),  Average Daily Traffic: 34,146 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 134,240 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: HWY N QUINSIGAMOND AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.093,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.6m (84.0ft),  Curb-To-Curb Width: 16.3m (53.5ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 54.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,881,000,  Roadway Improvement Cost: $189,000,  Total Project Cost: $2,822,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: S140221RDDOTNBI,  Location: 1.5 MI.NTH.OF ST.9 (Lat: 42.294542,  Lng: -71.753769),  Route carried "on" structure: Interstate 290,  Year Built: 1968,  Status: Open,  Structure Length: 2.71m (8.89ft),  Average Daily Traffic: 40,864 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 134,240 (year 2032),  Design Load: H 20,  Features Intersected: HWY N QUINSIGAMOND AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.7m (51.5ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.6m (84.0ft),  Curb-To-Curb Width: 15.7m (51.5ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $713,000,  Roadway Improvement Cost: $72,000,  Total Project Cost: $1,070,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: S140231REDOTNBI,  Location: 0.4 MI E OF WORC TL (Lat: 42.294844,  Lng: -71.750797),  Route carried "on" structure: Interstate 290,  Year Built: 1968,  Status: Open,  Structure Length: 4.53m (14.86ft),  Average Daily Traffic: 30,050 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 55,276 (year 2033),  Design Load: HS 20+Mod,  Features Intersected: HWY W MAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.3m (53.5ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 22.7m (74.5ft),  Curb-To-Curb Width: 16.3m (53.5ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 57.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.60m (15.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2022,  Bridge Improvement Cost: $3,199,000,  Roadway Improvement Cost: $320,000,  Total Project Cost: $4,799,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: S140231RFDOTNBI,  Location: .4 MI. EAST OF WORC T.L. (Lat: 42.295142,  Lng: -71.751028),  Route carried "on" structure: Interstate 290,  Year Built: 1968,  Status: Open,  Structure Length: 4.53m (14.86ft),  Average Daily Traffic: 35,161 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 55,276 (year 2033),  Design Load: HS 20+Mod,  Features Intersected: HWY W MAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.544,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.3m (53.5ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 22.7m (74.5ft),  Curb-To-Curb Width: 16.3m (53.5ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 55.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.60m (15.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2022,  Bridge Improvement Cost: $3,204,000,  Roadway Improvement Cost: $321,000,  Total Project Cost: $4,807,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: S14025AEXMUNNBI,  Location: 500 FT N OF RESERVOIR ST (Lat: 42.325281,  Lng: -71.697825),  Route carried "on" structure: City street ,  Year Built: 1990,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 200 (year 2016),  Truck Traffic: 1%,  Average Future Daily Traffic: 316 (year 2033),  Features Intersected: WATER RAWSON HILL BROOK,  Facility Carried by Structure: HWY BOWDOIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 50.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $777,000,  Roadway Improvement Cost: $78,000,  Total Project Cost: $1,166,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: S140181YHDOTNBI,  Location: ST 140/I 290 (Lat: 42.316667,  Lng: -71.716667),  Route carried "under" structure: Interstate 290,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 27,000 (year 0000),  Features Intersected: I 290 EB,  Facility Carried by Structure: ST140
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.0m (128.0ft)

Find on map >>   Show street view

Structure Number: S140181YHDOTNBI,  Location: ST 140/I 290 (Lat: 42.316667,  Lng: -71.716667),  Route carried "under" structure: Interstate 290,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 27,000 (year 0000),  Features Intersected: I 290 WB,  Facility Carried by Structure: ST140
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.0m (128.0ft)