Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Progress, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 25Number of bridges
  • 131ft / 40.0mTotal length
  • $1,774,000Total costs
  • 754,442Total average daily traffic
  • 101,315Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Progress
  • No street view available for this location

New bridges in Progress, PA - historical statistics
  • New bridges - historical statistics
  • 101960-1969
  • 21980-1989
  • 21990-1999
  • 102010-2019
  • 12020-2022
Average Bridge Daily Traffic in Progress, PA
Average Bridge Truck Traffic in Progress, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 9.1%Excellent
  • 9.1%Very good
  • 72.7%Good
  • 9.1%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 9.1%Excellent
  • 54.5%Very good
  • 27.3%Good
  • 9.1%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 9.1%Excellent
  • 9.1%Very good
  • 27.3%Good
  • 54.5%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 33.3%Very good
  • 66.7%Fair
Find on map >>   Show street view

Structure Number: 14224,  Location: 1.5 MI.N.OF PROGRESS (Lat: 40.301417,  Lng: -76.857417),  Route carried "on" structure: Interstate 81,  Year Built: 1969,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 48,452 (year 2022),  Truck Traffic: 18%,  Average Future Daily Traffic: 57,541 (year 2032),  Design Load: HS 20,  Features Intersected: TWP RD 318; KOHN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.171,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 194.5m (638.1ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 19.4m (63.6ft),  Out-to-Out Width: 20.3m (66.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.00m (6.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 14225,  Location: 1.5 MI.N. PROGRESS (Lat: 40.301833,  Lng: -76.857417),  Route carried "on" structure: Interstate 81,  Year Built: 1969,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 45,355 (year 2022),  Truck Traffic: 18%,  Average Future Daily Traffic: 53,865 (year 2032),  Design Load: HS 20,  Features Intersected: TWP RD 318; KOHN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.150,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.3m (37.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 15.7m (51.5ft),  Out-to-Out Width: 16.9m (55.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.90m (6.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 14226,  Location: 1 MI.N.OF PROGRESS (Lat: 40.303278,  Lng: -76.850017),  Route carried "on" structure: Interstate 81,  Year Built: 1969,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 5.64m (18.50ft),  Average Daily Traffic: 54,013 (year 2022),  Truck Traffic: 18%,  Average Future Daily Traffic: 64,147 (year 2032),  Design Load: HS 20,  Features Intersected: SR 3015
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.971,  Lanes on structure: 4,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 22.3m (73.2ft),  Out-to-Out Width: 24.1m (79.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.60m (21.65ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $102,000,  Roadway Improvement Cost: $299,000,  Total Project Cost: $1,371,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 14227,  Location: 1 MI. N. PROGRESS (Lat: 40.303778,  Lng: -76.850122),  Route carried "on" structure: Interstate 81,  Year Built: 1969,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 5.64m (18.50ft),  Average Daily Traffic: 51,690 (year 2022),  Truck Traffic: 19%,  Average Future Daily Traffic: 61,389 (year 2032),  Design Load: HS 20,  Features Intersected: SR 3015
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.932,  Lanes on structure: 4,  Lanes under structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.0m (59.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 19.4m (63.6ft),  Out-to-Out Width: 20.1m (65.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.60m (21.65ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $30,000,  Roadway Improvement Cost: $88,000,  Total Project Cost: $403,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 14281,  Location: S. OF UNION DEPOSIT (Lat: 40.272442,  Lng: -76.816019),  Route carried "on" structure: Interstate 83,  Year Built: 1994,  Status: Open,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 124,398 (year 2022),  Truck Traffic: 10%,  Average Future Daily Traffic: 147,737 (year 2032),  Design Load: HS 20,  Features Intersected: TWP RD 392,PEIFFER LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.839,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 30.5m (100.1ft),  Skew: 32 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.0m (59.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 37.5m (123.0ft),  Out-to-Out Width: 39.5m (129.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 14628,  Location: WITF STUDIO PAXTON CRK (Lat: 40.289614,  Lng: -76.861406),  Route carried "on" structure: City street ,  Year Built: 1987,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 750 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 175 (year 2039),  Design Load: HS 20,  Features Intersected: TRIB TO PAXTON CREEK,  Facility Carried by Structure: STATE FARM RD T318
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 6 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 14631,  Location: .6 NW 81 &PROG.AVE PXTCRK (Lat: 40.306072,  Lng: -76.855614),  Route carried "on" structure: City street ,  Year Built: 1987,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 450 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 490 (year 2041),  Features Intersected: PAXTON CREEK,  Facility Carried by Structure: KOHN ROAD, T-431
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: May 2021,  Other Special Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 48278,  Location: 0.3 Mi Ea I-83 Slotznick (Lat: 40.282136,  Lng: -76.825908),  Route carried "on" structure: City street ,  Year Built: 2013,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 3,547 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 4,119 (year 2039),  Design Load: HL 93,  Features Intersected: Slotznick Run,  Facility Carried by Structure: Schoolhouse Lane
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Toll: Toll bridge,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 61.9 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 47.6 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021
Find on map >>   Show street view

Structure Number: 53649,  Location: 0.2 Mi N of Ex 50 (US-22) (Lat: 40.298878,  Lng: -76.826608),  Route carried "on" structure: State highway ,  Year Built: 2016,  Status: Open,  Structure Length: 5.12m (16.80ft),  Average Daily Traffic: 3,917 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 5,291 (year 2032),  Design Load: HL 93,  Features Intersected: I-83; SR 0083 NB/SB,  Facility Carried by Structure: SR3026;Elmerton Av
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.701,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 26.2m (86.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 49.2 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 37.9 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 54636,  Location: 1.5MI E OF HARRISBURG (Lat: 40.278736,  Lng: -76.818961),  Route carried "on" structure: State highway ,  Year Built: 2017,  Status: Open,  Structure Length: 4.66m (15.29ft),  Average Daily Traffic: 32,144 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 37,805 (year 2032),  Design Load: HL 93,  Features Intersected: I 83; SR 0083,  Facility Carried by Structure: SR 3020
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.199,  Lanes on structure: 6,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 29.3m (96.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 23.2m (76.1ft),  Curb or Sidewalk Widths: Left: 2.5m (8.2ft),  Right: 2.5m (8.2ft),  Curb-To-Curb Width: 29.3m (96.1ft),  Out-to-Out Width: 35.0m (114.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 42.8 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 33.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 56025,  Location: COLONIAL PARK (Lat: 40.296389,  Lng: -76.825472),  Route carried "on" structure: US 22,  Year Built: 2018,  Status: Open,  Structure Length: 4.91m (16.11ft),  Average Daily Traffic: 28,921 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 31,398 (year 2039),  Design Load: HL 93,  Features Intersected: I-83; SR 0083
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.749,  Lanes on structure: 5,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.3m (46.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 25.9m (85.0ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 14.5m (47.6ft),  Out-to-Out Width: 34.6m (113.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 47.3 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 36.6 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 67835,  Location: 1 MI.N.E. OF PROGRESS (Lat: 40.303950,  Lng: -76.830222),  Route carried "on" structure: Interstate 83,  Year Built: 2020,  Status: Open,  Structure Length: 5.91m (19.39ft),  Average Daily Traffic: 38,711 (year 2022),  Truck Traffic: 18%,  Average Future Daily Traffic: 49,799 (year 2032),  Design Load: HL 93,  Features Intersected: T-431, Valley Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.962,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.0m (82.0ft),  Skew: 13 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 42.7m (140.1ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 24.1m (79.1ft),  Out-to-Out Width: 25.1m (82.3ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 56.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 40.2 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 14224,  Location: 1.5 MI.N.OF PROGRESS (Lat: 40.301417,  Lng: -76.857417),  Route carried "under" structure: City street ,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 1 (year 2005),  Features Intersected: TWP RD 318; KOHN RD,  Facility Carried by Structure: I-81 NB; SR 0081
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 12.8m (42.0ft)

Find on map >>   Show street view

Structure Number: 14225,  Location: 1.5 MI.N. PROGRESS (Lat: 40.301833,  Lng: -76.857417),  Route carried "under" structure: City street ,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 28,443 (year 1988),  Features Intersected: TWP RD 318; KOHN RD,  Facility Carried by Structure: I-81 SB; SR 0081
Minimum Vertical Clearance: 4.50m (14.76ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 11.3m (37.1ft)

Find on map >>   Show street view

Structure Number: 14226,  Location: 1 MI.N.OF PROGRESS (Lat: 40.303278,  Lng: -76.850017),  Route carried "under" structure: State highway ,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 6,368 (year 2022),  Truck Traffic: 3%,  Features Intersected: SR 3015,  Facility Carried by Structure: I-81 NB; SR 0081
Minimum Vertical Clearance: 5.38m (17.65ft),  Kilometerpoint: 4.939,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 18.3m (60.0ft)

Find on map >>   Show street view

Structure Number: 14226,  Location: 1 MI.N.OF PROGRESS (Lat: 40.303278,  Lng: -76.850017),  Route carried "under" structure: State highway ,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 6,368 (year 2022),  Truck Traffic: 3%,  Features Intersected: SR 3015,  Facility Carried by Structure: I-81 NB; SR 0081
Minimum Vertical Clearance: 5.31m (17.42ft),  Kilometerpoint: 4.939,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 18.3m (60.0ft)

Find on map >>   Show street view

Structure Number: 14227,  Location: 1 MI. N. PROGRESS (Lat: 40.303778,  Lng: -76.850122),  Route carried "under" structure: State highway ,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 6,368 (year 2022),  Truck Traffic: 3%,  Features Intersected: SR 3015,  Facility Carried by Structure: I-81 SB; SR 0081
Minimum Vertical Clearance: 5.46m (17.91ft),  Kilometerpoint: 4.939,  Lanes on structure: 4,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 18.0m (59.1ft)

Find on map >>   Show street view

Structure Number: 14227,  Location: 1 MI. N. PROGRESS (Lat: 40.303778,  Lng: -76.850122),  Route carried "under" structure: State highway ,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 6,368 (year 2022),  Truck Traffic: 3%,  Features Intersected: SR 3015,  Facility Carried by Structure: I-81 SB; SR 0081
Minimum Vertical Clearance: 5.39m (17.68ft),  Kilometerpoint: 4.939,  Lanes on structure: 4,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 18.0m (59.1ft)

Find on map >>   Show street view

Structure Number: 14281,  Location: S. OF UNION DEPOSIT (Lat: 40.272442,  Lng: -76.816019),  Route carried "under" structure: City street ,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 1 (year 2005),  Features Intersected: TWP RD 392,PEIFFER LANE,  Facility Carried by Structure: I-83; SR 0083
Minimum Vertical Clearance: 4.45m (14.60ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 18.0m (59.1ft)

Find on map >>   Show street view

Structure Number: 53649,  Location: 0.2 Mi N of Ex 50 (US-22) (Lat: 40.298878,  Lng: -76.826608),  Route carried "under" structure: Interstate 83,  Year Built: 2016,  Structure Length: 0. m,  Average Daily Traffic: 38,711 (year 2022),  Truck Traffic: 18%,  Features Intersected: I-83; SR 0083 NB/SB,  Facility Carried by Structure: SR3026;Elmerton Av
Minimum Vertical Clearance: 5.52m (18.11ft),  Kilometerpoint: 11.141,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 26.2m (86.0ft)

Find on map >>   Show street view

Structure Number: 53649,  Location: 0.2 Mi N of Ex 50 (US-22) (Lat: 40.298878,  Lng: -76.826608),  Route carried "under" structure: Interstate 83,  Year Built: 2016,  Structure Length: 0. m,  Average Daily Traffic: 47,691 (year 2022),  Truck Traffic: 16%,  Features Intersected: I-83; SR 0083 NB/SB,  Facility Carried by Structure: SR3026;Elmerton Av
Minimum Vertical Clearance: 5.52m (18.11ft),  Kilometerpoint: 11.188,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 26.2m (86.0ft)

Find on map >>   Show street view

Structure Number: 54636,  Location: 1.5MI E OF HARRISBURG (Lat: 40.278736,  Lng: -76.818961),  Route carried "under" structure: Interstate 83,  Year Built: 2017,  Structure Length: 0. m,  Average Daily Traffic: 49,958 (year 2022),  Truck Traffic: 14%,  Features Intersected: I 83; SR 0083,  Facility Carried by Structure: SR 3020
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 8.795,  Lanes on structure: 6,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.2m (76.1ft)

Find on map >>   Show street view

Structure Number: 54636,  Location: 1.5MI E OF HARRISBURG (Lat: 40.278736,  Lng: -76.818961),  Route carried "under" structure: Interstate 83,  Year Built: 2017,  Structure Length: 0. m,  Average Daily Traffic: 45,415 (year 2022),  Truck Traffic: 15%,  Features Intersected: I 83; SR 0083,  Facility Carried by Structure: SR 3020
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 8.839,  Lanes on structure: 6,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.2m (76.1ft)

Find on map >>   Show street view

Structure Number: 56025,  Location: COLONIAL PARK (Lat: 40.296389,  Lng: -76.825472),  Route carried "under" structure: Interstate 83,  Year Built: 2018,  Structure Length: 0. m,  Average Daily Traffic: 47,691 (year 2022),  Truck Traffic: 16%,  Features Intersected: I-83; SR 0083,  Facility Carried by Structure: US 22; SR 0022
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 11.188,  Lanes on structure: 5,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>   Show street view

Structure Number: 56025,  Location: COLONIAL PARK (Lat: 40.296389,  Lng: -76.825472),  Route carried "under" structure: Interstate 83,  Year Built: 2018,  Structure Length: 0. m,  Average Daily Traffic: 38,711 (year 2022),  Truck Traffic: 18%,  Features Intersected: I-83; SR 0083,  Facility Carried by Structure: US 22; SR 0022
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 11.141,  Lanes on structure: 5,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.9m (85.0ft)

Discuss Progress, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.