Bridge Statistics for Muscle Shoals, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 20Number of bridges
  • 131ft / 39.9mTotal length
  • $22,114,000Total costs
  • 148,528Total average daily traffic
  • 12,603Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Muscle Shoals
  • No street view available for this location

New bridges in Muscle Shoals, AL - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 11930-1939
  • 31950-1959
  • 31970-1979
  • 51980-1989
  • 11990-1999
  • 52000-2009
  • 12020-2022
Average Bridge Daily Traffic in Muscle Shoals, AL
Average Bridge Truck Traffic in Muscle Shoals, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 11.1%Very good
  • 22.2%Good
  • 33.3%Satisfactory
  • 33.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 11.1%Very good
  • 44.4%Good
  • 22.2%Satisfactory
  • 22.2%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 11.1%Very good
  • 22.2%Good
  • 55.6%Satisfactory
  • 11.1%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 7.7%Very good
  • 46.2%Good
  • 23.1%Satisfactory
  • 23.1%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 44.4%Good
  • 44.4%Satisfactory
  • 11.1%Fair
Find on map >>   Show street view

Structure Number: 1377170012,  Location: NEAR NAT. FERT. DEV. CTR. (Lat: 34.781667,  Lng: -87.650000),  Route carried "on" structure: Federal lands road ,  Year Built: 1958,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 1,929 (year 2021),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,500 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: BUS BAR TUNNEL- REMOVED,  Facility Carried by Structure: TVA RES. ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Tennessee Valley Authority,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.7m (58.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 55.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.89m (6.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $180,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $225,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 224,  Location: OLD 20 W OF GNAT POND RD (Lat: 34.699683,  Lng: -87.583233),  Route carried "on" structure: County highway 22,  Year Built: 1924,  Status: Open,  Structure Length: 1.03m (3.38ft),  Average Daily Traffic: 2,250 (year 2006),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,330 (year 2038),  Features Intersected: DRY CREEK,  Facility Carried by Structure: OLD HWY 20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.8m (15.7ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.4m (53.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $531,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $584,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1265,  Location: RICKS LN - POLK BRANCH (Lat: 34.659858,  Lng: -87.598931),  Route carried "on" structure: County highway 61,  Year Built: 1935,  Status: Temporarily open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 460 (year 2006),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,000 (year 2041),  Features Intersected: POLK BRANCH,  Facility Carried by Structure: RICKS LN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $265,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $292,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 544,  Location: 0.9 MI N JCT SR 2 & SR 13 (Lat: 34.724592,  Lng: -87.667989),  Route carried "on" structure: US 72,  Year Built: 1956,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 13,380 (year 2022),  Truck Traffic: 8%,  Average Future Daily Traffic: 16,261 (year 2033),  Design Load: HS 20,  Features Intersected: SOUTHERN RR,  Facility Carried by Structure: SR 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 43.736,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 13 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 47.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.20m (20.34ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $1,403,000,  Roadway Improvement Cost: $140,000,  Total Project Cost: $1,543,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 5441,  Location: 0.9 MI N JCT SR 2 & SR 13 (Lat: 34.724475,  Lng: -87.667800),  Route carried "on" structure: US 72,  Year Built: 1956,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 13,380 (year 2022),  Truck Traffic: 8%,  Average Future Daily Traffic: 16,261 (year 2033),  Design Load: HS 20,  Features Intersected: SOUTHERN RR,  Facility Carried by Structure: SR 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 43.736,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 13 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 47.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.20m (20.34ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $1,403,000,  Roadway Improvement Cost: $140,000,  Total Project Cost: $1,543,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1098,  Location: ARNOLD'S TRUCK STOP (Lat: 34.700814,  Lng: -87.644722),  Route carried "on" structure: County highway 59,  Year Built: 1973,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 145 (year 2010),  Truck Traffic: 34%,  Average Future Daily Traffic: 435 (year 2040),  Design Load: H 15,  Features Intersected: DRY CREEK,  Facility Carried by Structure: OLD HWY 20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 48.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $236,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $260,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 11209,  Location: 1 M E JCT SR 20 & SR157 (Lat: 34.684911,  Lng: -87.575469),  Route carried "on" structure: State highway 20,  Year Built: 1974,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 7,910 (year 2020),  Truck Traffic: 26%,  Average Future Daily Traffic: 10,654 (year 2033),  Design Load: HS 20,  Features Intersected: DRY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 53.839,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.8m (81.4ft),  Skew: 13 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 71.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.02m (6.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,933,000,  Roadway Improvement Cost: $193,000,  Total Project Cost: $2,126,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 12801,  Location: SPRING VALLEY RELIEF (Lat: 34.657042,  Lng: -87.636697),  Route carried "on" structure: County highway 52,  Year Built: 1982,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 945 (year 2006),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,500 (year 2038),  Design Load: H 20,  Features Intersected: SPRING CREEK RELIEF,  Facility Carried by Structure: SPRING VALLEY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 72.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $842,000,  Roadway Improvement Cost: $84,000,  Total Project Cost: $926,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 12802,  Location: SPRING CREEK MAIN CHANNEL (Lat: 34.656267,  Lng: -87.639478),  Route carried "on" structure: County highway 61,  Year Built: 1982,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 878 (year 1985),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,550 (year 2040),  Design Load: H 20,  Features Intersected: SPRING CREEK,  Facility Carried by Structure: SPRING VALLEY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 72.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $842,000,  Roadway Improvement Cost: $84,000,  Total Project Cost: $926,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 13033,  Location: LAGRANGE RD S GARGIS LN (Lat: 34.649567,  Lng: -87.616731),  Route carried "on" structure: County highway 57,  Year Built: 1983,  Status: Open,  Structure Length: 1.12m (3.67ft),  Average Daily Traffic: 1,590 (year 2006),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,000 (year 2040),  Design Load: H 20,  Features Intersected: POLK BRANCH,  Facility Carried by Structure: LAGRANGE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.9m (22.6ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.6m (8.5ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 69.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $489,000,  Roadway Improvement Cost: $49,000,  Total Project Cost: $538,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1334,  Location: SOCKWELL LN S HWY 20 (Lat: 34.681944,  Lng: -87.564167),  Route carried "on" structure: County highway 63,  Year Built: 1984,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 730 (year 1984),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,550 (year 2039),  Features Intersected: DRY CREEK,  Facility Carried by Structure: SOCKWELL LN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.2m (20.3ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 71.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $427,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $470,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 15832,  Location: DENTON RD INDUSTRIAL PARK (Lat: 34.696644,  Lng: -87.652639),  Route carried "on" structure: County highway 59,  Year Built: 1993,  Status: Open,  Structure Length: 1.91m (6.27ft),  Average Daily Traffic: 410 (year 2006),  Truck Traffic: 25%,  Average Future Daily Traffic: 550 (year 2041),  Design Load: HS 20,  Features Intersected: DRY CREEK,  Facility Carried by Structure: DENTON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.4m (17.7ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.5m (14.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.63m (8.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $988,000,  Roadway Improvement Cost: $99,000,  Total Project Cost: $1,087,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 18189,  Location: 0.2 M N JCT SR133 & SR184 (Lat: 34.762611,  Lng: -87.634556),  Route carried "on" structure: State highway 133,  Year Built: 2007,  Status: Open,  Structure Length: 1.85m (6.07ft),  Average Daily Traffic: 25,510 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 33,754 (year 2033),  Design Load: HS 20,  Features Intersected: POND CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.067,  Lanes on structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 26.8m (87.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.6m (15.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 63.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.57m (8.43ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $2,274,000,  Roadway Improvement Cost: $227,000,  Total Project Cost: $2,501,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 18728,  Location: CLR S OF MT. PLEASANT RD (Lat: 34.770153,  Lng: -87.528903),  Route carried "on" structure: County highway B0004,  Year Built: 2003,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 2,975 (year 2006),  Truck Traffic: 10%,  Average Future Daily Traffic: 4,480 (year 2038),  Design Load: HS 20,  Features Intersected: MCKIERNAN CREEK,  Facility Carried by Structure: COUNTY LINE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 5 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.9m (16.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 78.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.69m (5.54ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $781,000,  Roadway Improvement Cost: $78,000,  Total Project Cost: $859,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 18761,  Location: 4.1 M N JCT SR133 & SR184 (Lat: 34.782472,  Lng: -87.634944),  Route carried "on" structure: State highway 133,  Year Built: 2001,  Status: Open,  Structure Length: 5.85m (19.19ft),  Average Daily Traffic: 16,170 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 21,396 (year 2033),  Design Load: HS 20,  Features Intersected: RESERVATION ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.313,  Lanes on structure: 6,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 29.3m (96.1ft),  Skew: 26 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.5m (64.0ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 29.3m (96.1ft),  Out-to-Out Width: 34.4m (112.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 49.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 6.89m (22.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $5,292,000,  Roadway Improvement Cost: $529,000,  Total Project Cost: $5,821,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19952,  Location: 1.2 M W JCT SR184 & SR133 (Lat: 34.758556,  Lng: -87.612444),  Route carried "on" structure: State highway 184,  Year Built: 1985,  Status: Open,  Structure Length: 0.96m (3.15ft),  Average Daily Traffic: 9,650 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 11,916 (year 2033),  Design Load: HS 20,  Features Intersected: POND CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.029,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 20.1m (65.9ft),  Out-to-Out Width: 20.5m (67.3ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 79.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.63m (5.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $631,000,  Roadway Improvement Cost: $63,000,  Total Project Cost: $694,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 20514,  Location: 0.8 M N Jct SR2 & SR184 (Lat: 34.754167,  Lng: -87.667486),  Route carried "on" structure: US 72,  Year Built: 2021,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 18,856 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 30,898 (year 2042),  Design Load: HS 20,  Features Intersected: ASHE BOULEVARD,  Facility Carried by Structure: SR 2
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 48.757,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 81.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 63.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.89m (12.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $1,254,000,  Roadway Improvement Cost: $125,000,  Total Project Cost: $1,379,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 20646,  Location: FULLER STORE RD (Lat: 34.660717,  Lng: -87.598511),  Route carried "on" structure: County highway ,  Year Built: 2001,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 60 (year 2001),  Average Future Daily Traffic: 75 (year 2038),  Design Load: HS 20,  Features Intersected: POLK BRANCH,  Facility Carried by Structure: FULLER STORE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 83.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 61.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $309,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $340,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 10794,  Location: 1 MI N JCT SR 20 (Lat: 34.713653,  Lng: -87.634828),  Route carried "under" structure: State highway 133,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 12,810 (year 2013),  Truck Traffic: 10%,  Features Intersected: SR 133,  Facility Carried by Structure: SOUTHERN RR
Minimum Vertical Clearance: 4.97m (16.31ft),  Kilometerpoint: 0.929,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.8m (55.1ft)

Find on map >>   Show street view

Structure Number: 18761,  Location: 4.1 M N JCT SR133 & SR184 (Lat: 34.782472,  Lng: -87.634944),  Route carried "under" structure: Federal lands road ,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 18,490 (year 2021),  Truck Traffic: 8%,  Features Intersected: RESERVATION ROAD,  Facility Carried by Structure: SR 133
Minimum Vertical Clearance: 4.91m (16.11ft),  Kilometerpoint: 4.329,  Lanes on structure: 6,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.5m (64.0ft)