Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Mount Vernon, Virginia (VA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 15Number of bridges
  • 79ft / 24.4mTotal length
  • $10,637,000Total costs
  • 146,572Total average daily traffic
  • 3,875Total average daily truck traffic
  • 173,802Total future (year 2033) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Mount Vernon
  • No street view available for this location

New bridges in Mount Vernon, VA - historical statistics
  • New bridges - historical statistics
  • 21930-1939
  • 21960-1969
  • 71970-1979
  • 11980-1989
  • 11990-1999
  • 22000-2009
Average Bridge Daily Traffic in Mount Vernon, VA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 57.1%Good
  • 28.6%Satisfactory
  • 14.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 14.3%Very good
  • 28.6%Good
  • 42.9%Satisfactory
  • 14.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 42.9%Good
  • 57.1%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 60.0%Satisfactory
  • 40.0%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 25.0%Good
  • 37.5%Satisfactory
  • 37.5%Fair
Find on map >>   Show street view

Structure Number: 6218,  Location: 00.24FR3105/00.27TO235 (Lat: 38.718808,  Lng: -77.128714),  Route carried "on" structure: US 1,  Year Built: 1933,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 28,461 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 35,206 (year 2040),  Design Load: HS 20,  Features Intersected: DOGUE CREEK,  Facility Carried by Structure: JEFF DAVIS HIGHWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 297.037,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.8m (55.1ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 16.7m (54.8ft),  Out-to-Out Width: 18.9m (62.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 40.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $480,000,  Roadway Improvement Cost: $48,000,  Total Project Cost: $529,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6225,  Location: 00.03FR235 00.25TO626 (Lat: 38.739422,  Lng: -77.088525),  Route carried "on" structure: US 1,  Year Built: 1975,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 45,537 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 50,091 (year 2040),  Design Load: HS 20,  Features Intersected: LITTLE HUNTING CREEK,  Facility Carried by Structure: RICHMOND HIGHWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 301.206,  Lanes on structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 27.4m (89.9ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 27.4m (89.9ft),  Out-to-Out Width: 32.3m (106.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 81.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 62.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.14m (10.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $75,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $90,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 6226,  Location: 0.11FR624 / 0.07TO778 (Lat: 38.722133,  Lng: -77.121989),  Route carried "on" structure: US 1,  Year Built: 1979,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 28,461 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 35,206 (year 2040),  Design Load: HS 20,  Features Intersected: NORTH FORK DOGUE CREEK,  Facility Carried by Structure: RICHMOND HIGHWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 297.713,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.10m (39.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $55,000,  Roadway Improvement Cost: $99,000,  Total Project Cost: $200,000 ( Estimate for 2014)
Find on map >>   Show street view

Structure Number: 6483,  Location: 00.21 4232 / 00.13 3108 (Lat: 38.709353,  Lng: -77.108619),  Route carried "on" structure: State highway 235,  Year Built: 1960,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 10,159 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 13,504 (year 2040),  Design Load: HS 20,  Features Intersected: TRIBUTARY OF DOGUE CREEK,  Facility Carried by Structure: MOUNT VERNON HIWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.600,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $2,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $4,000
Find on map >>   Show street view

Structure Number: 6723,  Location: 00.05 3196 / 00.13 3012 (Lat: 38.731094,  Lng: -77.116994),  Route carried "on" structure: County highway 622,  Year Built: 1971,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 5,240 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 5,764 (year 2040),  Design Load: HS 20,  Features Intersected: BRANCH OF DOGUE CREEK,  Facility Carried by Structure: POLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.939,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.38m (11.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $29,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $75,000
Find on map >>   Show street view

Structure Number: 6726,  Location: 00.20 1169 / 00.38 3106 (Lat: 38.710961,  Lng: -77.124675),  Route carried "on" structure: County highway 623,  Year Built: 1974,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 1,558 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,714 (year 2040),  Design Load: HS 20,  Features Intersected: DOGUE CREEK,  Facility Carried by Structure: OLD MILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.255,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 77.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 59.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $55,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $175,000 ( Estimate for 2015),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 6727,  Location: 00.03FR1033/00.04TO1267 (Lat: 38.727083,  Lng: -77.119831),  Route carried "on" structure: County highway 624,  Year Built: 1982,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 1,107 (year 2011),  Average Future Daily Traffic: 1,268 (year 2040),  Design Load: HS 20,  Features Intersected: BRANCH OF DOGUE CREEK,  Facility Carried by Structure: HIGHLAND LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.354,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.30m (0.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $3,000 ( Estimate for 2014)
Find on map >>   Show street view

Structure Number: 6924,  Location: 00.03FR1097/00.04TO1038 (Lat: 38.724419,  Lng: -77.103139),  Route carried "on" structure: County highway 1096,  Year Built: 1964,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 638 (year 2011),  Average Future Daily Traffic: 884 (year 2040),  Design Load: HS 20,  Features Intersected: BRANCH OF DOGUE CREEK,  Facility Carried by Structure: WOODLEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.188,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.87m (9.42ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $10,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $50,000
Find on map >>   Show street view

Structure Number: 693,  Location: 00.02FR6005/00.00TO END (Lat: 38.740778,  Lng: -77.095614),  Route carried "on" structure: County highway 1202,  Year Built: 1974,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 3,490 (year 2011),  Average Future Daily Traffic: 5,514 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: LITTLE HUNTING CREEK,  Facility Carried by Structure: JANNA LEE AVE.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.499,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 88.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.14m (10.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $55,000,  Roadway Improvement Cost: $67,000,  Total Project Cost: $150,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6972,  Location: 00.06 3183 / 00.08 3722 (Lat: 38.734325,  Lng: -77.114467),  Route carried "on" structure: County highway 3191,  Year Built: 1971,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 2,930 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 3,223 (year 2040),  Design Load: HS 20,  Features Intersected: BRANCH OF DOGUE CREEK,  Facility Carried by Structure: FRYE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.837,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 0.9m (3.0ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.30m (0.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $3,000
Find on map >>   Show street view

Structure Number: 6973,  Location: 00.20FR622/00.05TO3197 (Lat: 38.733650,  Lng: -77.116847),  Route carried "on" structure: County highway 3196,  Year Built: 1971,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 1,326 (year 2016),  Average Future Daily Traffic: 1,411 (year 2040),  Design Load: HS 20,  Features Intersected: BRANCH OF DOGUE CREEK,  Facility Carried by Structure: KEELER STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 1.1m (3.6ft),  Right: 1.1m (3.6ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.02m (13.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $35,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $55,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 24316,  Location: 00.10FR915/00.05TO622 (Lat: 38.731553,  Lng: -77.113314),  Route carried "on" structure: County highway 3191,  Year Built: 1995,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 4,002 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 4,987 (year 2040),  Design Load: HS 20,  Features Intersected: TRIB. OF DOGUE CREEK,  Facility Carried by Structure: FRYE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.628,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.30m (0.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $1,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $3,000
Find on map >>   Show street view

Structure Number: 25725,  Location: 00.50FR624/00.35TO235 (Lat: 38.715961,  Lng: -77.108467),  Route carried "on" structure: County highway 624,  Year Built: 2000,  Status: Open,  Structure Length: 2.65m (8.69ft),  Average Daily Traffic: 2,105 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,316 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: NORTH FORK DOGUE CREEK,  Facility Carried by Structure: OLD MILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.430,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.8m (28.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 66.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.65m (8.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $150,000 ( Estimate for 2014),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 26428,  Location: 00.05fr6988/00.10to624 (Lat: 38.716833,  Lng: -77.120222),  Route carried "on" structure: County highway 623,  Year Built: 2000,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 1,558 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,714 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: BRANCH OF DOGUE CREEK,  Facility Carried by Structure: OLD MILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.225,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 71.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.16m (3.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $44,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $150,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 3300026P,  Location: 8.6 MILES SOUTH OF I-95/4 (Lat: 38.712811,  Lng: -77.074006),  Route carried "on" structure: Federal lands road 3,  Year Built: 1932,  Status: Open,  Structure Length: 4.40m (14.44ft),  Average Daily Traffic: 10,000 (year 2013),  Truck Traffic: 1%,  Average Future Daily Traffic: 11,000 (year 2033),  Features Intersected: LITTLE HUNTING CREEK,  Facility Carried by Structure: GEORGE WASHINGTON
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.491,  Lanes on structure: 4,  Owner: National Park Service,  Approaching Roadway Width: 13.1m (43.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 15.9m (52.2ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 21.2m (69.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: April 2021,  Underwater Inspection Date: July 2018,  Bridge Improvement Cost: $6,000,000,  Roadway Improvement Cost: $600,000,  Total Project Cost: $9,000,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Discuss Mount Vernon, Virginia (VA) on our hugely popular Virginia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.