Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Moody, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 26Number of bridges
  • 243ft / 74.2mTotal length
  • $42,666,000Total costs
  • 383,310Total average daily traffic
  • 80,388Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Moody
  • No street view available for this location

New bridges in Moody, AL - historical statistics
  • New bridges - historical statistics
  • 41920-1929
  • 51940-1949
  • 21950-1959
  • 61960-1969
  • 21980-1989
  • 21990-1999
  • 22000-2009
  • 32010-2019
Reconstructed bridges in Moody, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 11990-1999
  • 02000-2009
  • 12010-2019
Average Bridge Daily Traffic in Moody, AL
Average Bridge Truck Traffic in Moody, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 9.1%Very good
  • 27.3%Good
  • 54.5%Satisfactory
  • 9.1%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 9.1%Very good
  • 36.4%Good
  • 36.4%Satisfactory
  • 18.2%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 18.2%Good
  • 63.6%Satisfactory
  • 18.2%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 6.3%Very good
  • 50.0%Good
  • 37.5%Satisfactory
  • 6.3%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Good
  • 40.0%Satisfactory
  • 10.0%Fair
Find on map >>   Show street view

Structure Number: 171,  Location: IN MOODY (Lat: 33.559469,  Lng: -86.500261),  Route carried "on" structure: US 78,  Year Built: 1928,  Status: Open,  Structure Length: 4.51m (14.80ft),  Average Daily Traffic: 4,100 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 5,288 (year 2040),  Design Load: H 15,  Features Intersected: NORFOLK SOUTHERN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 189.998,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.50m (18.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $906,000,  Roadway Improvement Cost: $91,000,  Total Project Cost: $997,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 473,  Location: US 78 * N/S RR (Lat: 33.573300,  Lng: -86.451867),  Route carried "on" structure: US 78,  Year Built: 1928,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 3,170 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 4,088 (year 2041),  Design Load: H 15,  Features Intersected: NORFOLK SOUTHERN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 195.596,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 65.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $362,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $398,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 596,  Location: US 78 * RAM HORN BRANCH (Lat: 33.580117,  Lng: -86.410083),  Route carried "on" structure: US 78,  Year Built: 1929,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 1,270 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,638 (year 2040),  Features Intersected: RAM HORN BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 200.041,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 81.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $340,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $374,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3059,  Location: .2MI N MOODY CTY LM (Lat: 33.619400,  Lng: -86.455800),  Route carried "on" structure: US 411,  Year Built: 1947,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 11,070 (year 2021),  Truck Traffic: 11%,  Average Future Daily Traffic: 14,676 (year 2041),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 285.071,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Very good,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $453,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $498,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3291,  Location: 5 MILE EAST OF VICTORIA (Lat: 31.519342,  Lng: -85.857528),  Route carried "on" structure: County highway 147,  Year Built: 1948,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 250 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 275 (year 2040),  Design Load: H 10,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 39.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.81m (5.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $354,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $389,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 5108,  Location: US 78 * KELLY CK (Lat: 33.578439,  Lng: -86.459808),  Route carried "on" structure: US 78,  Year Built: 1963,  Status: Open,  Structure Length: 7.68m (25.20ft),  Average Daily Traffic: 3,170 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 4,088 (year 2041),  Design Load: H 15,  Features Intersected: KELLY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 194.584,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 37.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.70m (28.54ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,610,000,  Roadway Improvement Cost: $161,000,  Total Project Cost: $1,771,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 5311,  Location: 0 5 MI SE WHITES CHAPEL (Lat: 33.595867,  Lng: -86.531689),  Route carried "on" structure: ServiceCounty highway 123,  Year Built: 1955,  Status: Posted for load,  Structure Length: 7.71m (25.30ft),  Average Daily Traffic: 6,660 (year 2004),  Truck Traffic: 4%,  Average Future Daily Traffic: 10,926 (year 2029),  Design Load: H 15,  Features Intersected: BIG BLACK CREEK,  Facility Carried by Structure: ST CLAIR CO 12
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 34.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 8.73m (28.64ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $1,616,000,  Roadway Improvement Cost: $162,000,  Total Project Cost: $1,778,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 5312,  Location: 0 2 MI SE MOODYS X ROADS (Lat: 33.590339,  Lng: -86.493969),  Route carried "on" structure: ServiceCounty highway 123,  Year Built: 1955,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 6,018 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 8,942 (year 2038),  Design Load: H 15,  Features Intersected: KERR BRANCH,  Facility Carried by Structure: ST CLAIR CO 12
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 71.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $363,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $399,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7215,  Location: CO RD 10 * I20 (Lat: 33.578128,  Lng: -86.476089),  Route carried "on" structure: County highway 10,  Year Built: 1961,  Status: Open,  Structure Length: 8.63m (28.31ft),  Average Daily Traffic: 1,820 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,872 (year 2040),  Design Load: HS 20,  Features Intersected: I 20,  Facility Carried by Structure: KELLEY CRK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.8m (78.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 37.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 9.61m (31.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $2,043,000,  Roadway Improvement Cost: $204,000,  Total Project Cost: $2,247,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7216,  Location: 0.4 E CO RD 10 (Lat: 33.578333,  Lng: -86.468889),  Route carried "on" structure: Interstate 20,  Year Built: 1961,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 51,890 (year 2020),  Truck Traffic: 28%,  Average Future Daily Traffic: 62,692 (year 2040),  Design Load: HS 20,  Features Intersected: HEAD SPRINGS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 237.702,  Lanes on structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 39.0m (128.0ft),  Skew: 14 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 60.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,727,000,  Roadway Improvement Cost: $173,000,  Total Project Cost: $1,900,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8064,  Location: 1.8 MI NE BROMPTON (Lat: 33.598964,  Lng: -86.454350),  Route carried "on" structure: ServiceCounty highway 127,  Year Built: 1963,  Status: Posted for load,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 2,595 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 3,163 (year 2029),  Design Load: H 15,  Features Intersected: KELLY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 39.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 23.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2021,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $625,000,  Roadway Improvement Cost: $63,000,  Total Project Cost: $688,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8435,  Location: 0 5 MI S ACMAR P O (Lat: 33.613483,  Lng: -86.512950),  Route carried "on" structure: ServiceCounty highway 120,  Year Built: 1964,  Status: Posted for load,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 400 (year 1999),  Truck Traffic: 10%,  Average Future Daily Traffic: 645 (year 2029),  Design Load: H 15,  Features Intersected: LITTLE BLACK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 5.12m (16.80ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $842,000,  Roadway Improvement Cost: $84,000,  Total Project Cost: $926,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12615,  Location: 0.1 MI N PRESCOTT CHURCH (Lat: 33.569147,  Lng: -86.445872),  Route carried "on" structure: ServiceCounty highway 137,  Year Built: 1981,  Status: Open,  Structure Length: 1.30m (4.27ft),  Average Daily Traffic: 1,233 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,832 (year 2040),  Design Load: H 15,  Features Intersected: KELLY CREEK,  Facility Carried by Structure: ST CLAIR CO HWY13
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $549,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $604,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 12616,  Location: 0.1 MI N PRESCOTT CHU (Lat: 33.568489,  Lng: -86.445850),  Route carried "on" structure: ServiceCounty highway 137,  Year Built: 1981,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 1,233 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,832 (year 2040),  Design Load: H 15,  Features Intersected: KELLY BRANCH,  Facility Carried by Structure: ST CLAIR CO 4WY13
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 74.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.81m (5.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $584,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $642,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 14081,  Location: .8 MI. NO.I-20 (Lat: 33.570000,  Lng: -86.518767),  Route carried "on" structure: US 411,  Year Built: 1947,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 22,730 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 30,135 (year 2041),  Design Load: H 15,  Features Intersected: LITTLE CAHABA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 277.197,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 22.0m (72.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 39.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.66m (12.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $1,807,000,  Roadway Improvement Cost: $181,000,  Total Project Cost: $1,988,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 14991,  Location: 2 . 9 MI NO JEF CO LN (Lat: 33.586667,  Lng: -86.500983),  Route carried "on" structure: US 411,  Year Built: 1947,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 22,730 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 30,135 (year 2041),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 279.456,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 87.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 87.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $953,000,  Roadway Improvement Cost: $95,000,  Total Project Cost: $1,048,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 15232,  Location: 0.5 MI S COOK SPRINGS (Lat: 33.587231,  Lng: -86.396619),  Route carried "on" structure: County highway 140,  Year Built: 1990,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 250 (year 1999),  Truck Traffic: 10%,  Average Future Daily Traffic: 469 (year 2029),  Design Load: HS 20,  Features Intersected: CANE CREEK,  Facility Carried by Structure: COUNTY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 40.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $401,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $441,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 15321,  Location: I 20 / CANE CREEK (Lat: 33.595833,  Lng: -86.389167),  Route carried "on" structure: Interstate 20,  Year Built: 1991,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 5.09m (16.70ft),  Average Daily Traffic: 51,010 (year 2020),  Truck Traffic: 28%,  Average Future Daily Traffic: 61,629 (year 2040),  Design Load: HS 20,  Features Intersected: CANE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 245.520,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 35.4m (116.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 36.9m (121.1ft),  Out-to-Out Width: 36.9m (121.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 73.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.11m (20.05ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $5,070,000,  Roadway Improvement Cost: $507,000,  Total Project Cost: $5,577,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 18378,  Location: US 411 * I20 AT MOODY (Lat: 33.565744,  Lng: -86.521408),  Route carried "on" structure: US 25,  Year Built: 2003,  Status: Open,  Structure Length: 9.08m (29.79ft),  Average Daily Traffic: 19,420 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 25,747 (year 2040),  Design Load: HS 20,  Features Intersected: I-20,  Facility Carried by Structure: US 411/ASHVILLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 276.463,  Lanes on structure: 6,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 36.0m (118.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 27.7m (90.9ft),  Curb-To-Curb Width: 36.0m (118.1ft),  Out-to-Out Width: 36.8m (120.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 72.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.05m (32.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $8,270,000,  Roadway Improvement Cost: $827,000,  Total Project Cost: $9,097,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19784,  Location: I-20 OVER COOK SPRINGS RD (Lat: 33.595769,  Lng: -86.395972),  Route carried "on" structure: Interstate 20,  Year Built: 2010,  Status: Open,  Structure Length: 6.71m (22.01ft),  Average Daily Traffic: 51,890 (year 2020),  Truck Traffic: 28%,  Average Future Daily Traffic: 62,692 (year 2040),  Design Load: HS 20,  Features Intersected: COOK SPRINGS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 244.844,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 43.3m (142.1ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 43.3m (142.1ft),  Out-to-Out Width: 45.2m (148.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 83.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.74m (25.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $7,857,000,  Roadway Improvement Cost: $786,000,  Total Project Cost: $8,643,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1987,  Location: .2 MILE E COOK SPRINGS RD (Lat: 33.590717,  Lng: -86.392950),  Route carried "on" structure: US 78,  Year Built: 2014,  Status: Open,  Structure Length: 3.81m (12.50ft),  Average Daily Traffic: 1,071 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,760 (year 2040),  Design Load: HS 20,  Features Intersected: CANE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 202.135,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 5 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 12.6m (41.3ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 85.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.75m (15.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,055,000,  Roadway Improvement Cost: $206,000,  Total Project Cost: $2,261,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 475,  Location: SOU RR * US 78 (Lat: 33.591519,  Lng: -86.390172),  Route carried "under" structure: Other road 4,  Year Built: 1928,  Structure Length: 0. m,  Average Daily Traffic: 1,010 (year 2013),  Truck Traffic: 5%,  Features Intersected: US 78,  Facility Carried by Structure: SOU RR
Minimum Vertical Clearance: 5.24m (17.19ft),  Kilometerpoint: 202.295,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 14.9m (48.9ft)

Find on map >>   Show street view

Structure Number: 2797,  Location: 0 1 N COOK SPRINGS (Lat: 33.593333,  Lng: -86.398333),  Route carried "under" structure: ServiceOther road 140,  Year Built: 1944,  Structure Length: 0. m,  Average Daily Traffic: 200 (year 1985),  Truck Traffic: 1%,  Features Intersected: SEABOARD RAILROAD,  Facility Carried by Structure: SEABOARD RAILROAD
Minimum Vertical Clearance: 4.80m (15.75ft),  Kilometerpoint: 0.010,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Arch - Thru,  Length of Maximum Span: 4.9m (16.1ft)

Find on map >>   Show street view

Structure Number: 7215,  Location: CO RD 10 * I20 (Lat: 33.578128,  Lng: -86.476089),  Route carried "under" structure: Interstate 20,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 51,890 (year 2020),  Truck Traffic: 28%,  Features Intersected: I 20,  Facility Carried by Structure: KELLEY CRK RD
Minimum Vertical Clearance: 5.55m (18.21ft),  Kilometerpoint: 237.058,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 23.8m (78.1ft)

Find on map >>   Show street view

Structure Number: 18378,  Location: US 411 * I20 AT MOODY (Lat: 33.565744,  Lng: -86.521408),  Route carried "under" structure: Interstate 20,  Year Built: 2003,  Structure Length: 0. m,  Average Daily Traffic: 65,150 (year 2020),  Truck Traffic: 24%,  Features Intersected: I-20,  Facility Carried by Structure: US 411/ASHVILLE RD
Minimum Vertical Clearance: 5.43m (17.81ft),  Kilometerpoint: 232.590,  Lanes on structure: 6,  Lanes under structure: 8,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.7m (90.9ft)

Find on map >>   Show street view

Structure Number: 19784,  Location: I-20 OVER COOK SPRINGS RD (Lat: 33.595769,  Lng: -86.395972),  Route carried "under" structure: County highway ,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 1,080 (year 2020),  Truck Traffic: 1%,  Features Intersected: COOK SPRINGS ROAD,  Facility Carried by Structure: I-20 EBL
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.4m (89.9ft)

Discuss Moody, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.