Bridge Statistics for Livingston, Montana (MT)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 28Number of bridges
  • 456ft / 139mTotal length
  • $7,665,000Total costs
  • 175,503Total average daily traffic
  • 21,327Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Livingston
  • No street view available for this location

New bridges in Livingston, MT - historical statistics
  • New bridges - historical statistics
  • 31930-1939
  • 21950-1959
  • 201960-1969
  • 32010-2019
Reconstructed bridges in Livingston, MT - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 01980-1989
  • 11990-1999
  • 12000-2009
Average Bridge Daily Traffic in Livingston, MT
Average Bridge Truck Traffic in Livingston, MT
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 5.9%Very good
  • 47.1%Good
  • 29.4%Satisfactory
  • 11.8%Fair
  • 5.9%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 11.8%Very good
  • 23.5%Good
  • 52.9%Satisfactory
  • 11.8%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.9%Very good
  • 23.5%Good
  • 58.8%Satisfactory
  • 5.9%Fair
  • 5.9%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 22.2%Very good
  • 66.7%Satisfactory
  • 11.1%Fair
Find on map >>   Show street view

Structure Number: 201903819,  Location: 6M NE OF LIVINGSTON (Lat: 45.726233,  Lng: -110.462842),  Route carried "on" structure: County highway 34010,  Year Built: 2019,  Status: Open,  Structure Length: 3.23m (10.60ft),  Average Daily Traffic: 100 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 100 (year 2037),  Design Load: HL 93,  Features Intersected: SHEILDS RIVER,  Facility Carried by Structure: CONVICT GRADE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.745,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.4m (103.0ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Other
Find on map >>   Show street view

Structure Number: I00090330+09911,  Location: 1.9M W LIVINGSTON (Lat: 45.651197,  Lng: -110.612253),  Route carried "on" structure: Interstate 90,  Year Built: 1962,  Status: Open,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 14,046 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 15,099 (year 2040),  Design Load: HS 20,  Features Intersected: INT WEST LIVINGSTON
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 529.149,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: I00090330+09912,  Location: 1.9M W LIVINGSTON (Lat: 45.651364,  Lng: -110.612122),  Route carried "on" structure: Interstate 90,  Year Built: 1962,  Status: Open,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 13,640 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 14,663 (year 2040),  Design Load: HS 20,  Features Intersected: INT WEST LIVINGSTON
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 529.353,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: I00090332+09411,  Location: LIVINGSTON (Lat: 45.644311,  Lng: -110.573658),  Route carried "on" structure: Interstate 90,  Year Built: 1962,  Status: Open,  Structure Length: 7.65m (25.10ft),  Average Daily Traffic: 13,640 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 14,663 (year 2040),  Design Load: HS 20,  Features Intersected: INT S LIVINGSTON-US HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 532.287,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.70m (28.54ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $470,000,  Roadway Improvement Cost: $235,000,  Total Project Cost: $705,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: I00090332+09412,  Location: LIVINGSTON (Lat: 45.644519,  Lng: -110.573631),  Route carried "on" structure: Interstate 90,  Year Built: 1962,  Year Reconstructed: 1981,  Status: Open,  Structure Length: 7.65m (25.10ft),  Average Daily Traffic: 11,971 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 13,108 (year 2040),  Design Load: HS 20,  Features Intersected: INT S LIVINGSTON-US HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 532.479,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Satisfactory,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2018,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: I00090333+05521,  Location: LIVINGSTON (Lat: 45.644367,  Lng: -110.561144),  Route carried "on" structure: Interstate 90,  Year Built: 1962,  Status: Open,  Structure Length: 22.25m (73.00ft),  Average Daily Traffic: 11,971 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 13,108 (year 2040),  Design Load: HS 20,  Features Intersected: YELLOWSTONE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 533.262,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 1,  Length of Maximum Span: 56.4m (185.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 22.25m (73.00ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2020,  Critical Feature Inspection Date: September 2020,  Underwater Inspection Date: October 2018,  Bridge Improvement Cost: $1,380,000,  Roadway Improvement Cost: $690,000,  Total Project Cost: $2,070,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: I00090333+05522,  Location: LIVINGSTON (Lat: 45.644558,  Lng: -110.561172),  Route carried "on" structure: Interstate 90,  Year Built: 1962,  Status: Open,  Structure Length: 22.25m (73.00ft),  Average Daily Traffic: 11,971 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 13,108 (year 2040),  Design Load: HS 20,  Features Intersected: YELLOWSTONE RIVER
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 533.451,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 1,  Length of Maximum Span: 56.4m (185.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 22.39m (73.46ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2021,  Critical Feature Inspection Date: June 2021,  Underwater Inspection Date: October 2018,  Bridge Improvement Cost: $1,380,000,  Roadway Improvement Cost: $690,000,  Total Project Cost: $2,070,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: I00090336+08901,  Location: 3.7M E LIVINGSTON (Lat: 45.677175,  Lng: -110.513336),  Route carried "on" structure: Interstate 90,  Year Built: 1962,  Status: Open,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 11,971 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 13,108 (year 2040),  Design Load: HS 20,  Features Intersected: SEP S 295
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 538.671,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: I00090336+08902,  Location: 3.7M E LIVINGSTON (Lat: 45.677325,  Lng: -110.513531),  Route carried "on" structure: Interstate 90,  Year Built: 1962,  Status: Open,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 11,971 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 13,108 (year 2040),  Design Load: HS 20,  Features Intersected: SEP S 295
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 538.841,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: L34003001+07001,  Location: 2M NE LIVINGSTON (Lat: 45.701478,  Lng: -110.519742),  Route carried "on" structure: County highway 34003,  Year Built: 1938,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 627 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 658 (year 2040),  Features Intersected: FERRY CREEK 037,  Facility Carried by Structure: OLD CLYDE PARK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.106,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.9m (16.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 24.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: L34007000+03001,  Location: 8M NE LIVINGSTON (Lat: 45.761817,  Lng: -110.493806),  Route carried "on" structure: County highway 34007,  Year Built: 1938,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 100 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 100 (year 2037),  Features Intersected: SHIELDS RIVER OVERFL 022,  Facility Carried by Structure: SHIELDS RIVER RD E
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.432,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 6.8m (22.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 33.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: L34391000+01001,  Location: LIVINGSTON-S 9TH ST (Lat: 45.649936,  Lng: -110.561942),  Route carried "on" structure: County highway 34391,  Year Built: 2011,  Status: Open,  Structure Length: 6.14m (20.14ft),  Average Daily Traffic: 92 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 97 (year 2040),  Design Load: HL 93,  Features Intersected: YELLOWSTONE RIVER 070,  Facility Carried by Structure: S 9TH ST-ISLAND DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.066,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 30.7m (100.7ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 45.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 34.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.50m (21.33ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $227,000,  Roadway Improvement Cost: $114,000,  Total Project Cost: $341,000,  Deck Structure Type: Other
Find on map >>   Show street view

Structure Number: M34074000+00101,  Location: LIVINGSTON-SACAGAWEA PARK (Lat: 45.655053,  Lng: -110.558669),  Route carried "on" structure: City street 34074,  Year Built: 1939,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 100 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 100 (year 2037),  Features Intersected: FLESHMAN CREEK 071,  Facility Carried by Structure: S YELLOWSTONE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.210,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.9m (25.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021
Find on map >>   Show street view

Structure Number: P00011055+09401,  Location: NE LIVINGSTON (Lat: 45.674811,  Lng: -110.536967),  Route carried "on" structure: US 89,  Year Built: 2013,  Status: Open,  Structure Length: 19.56m (64.17ft),  Average Daily Traffic: 4,522 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 4,748 (year 2040),  Design Load: HL 93,  Features Intersected: YELLOWSTONE RIVER,  Facility Carried by Structure: BUSINESS RTE 90
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 89.813,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 54.3m (178.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.6m (54.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: May 2021,  Underwater Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: P00011057+09501,  Location: 2M NE LIVNGSTON (Lat: 45.688106,  Lng: -110.500358),  Route carried "on" structure: US 89,  Year Built: 1962,  Status: Open,  Structure Length: 8.50m (27.89ft),  Average Daily Traffic: 2,506 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,631 (year 2040),  Design Load: H 20,  Features Intersected: INT EAST LIVINGSTON I 90
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 93.060,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.6m (77.4ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 9.50m (31.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $525,000,  Roadway Improvement Cost: $263,000,  Total Project Cost: $788,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Bituminous
Find on map >>   Show street view

Structure Number: P00059000+00001,  Location: 5M NE LIVINGSTON (Lat: 45.706750,  Lng: -110.455256),  Route carried "on" structure: US 89,  Year Built: 1962,  Status: Open,  Structure Length: 6.43m (21.10ft),  Average Daily Traffic: 2,006 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,156 (year 2040),  Design Load: HS 20,  Features Intersected: INT MISSION I 90
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Bituminous
Find on map >>   Show street view

Structure Number: P00059000+00611,  Location: 5M NE LIVINGSTON (Lat: 45.707603,  Lng: -110.455919),  Route carried "on" structure: US 89,  Year Built: 1955,  Status: Open,  Structure Length: 3.93m (12.89ft),  Average Daily Traffic: 2,006 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,156 (year 2040),  Design Load: HS 15,  Features Intersected: RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.127,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.2m (46.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 29.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: P00059001+05131,  Location: 6M NE LIVINGSTON (Lat: 45.717961,  Lng: -110.467503),  Route carried "on" structure: US 89,  Year Built: 1955,  Year Reconstructed: 2011,  Status: Open,  Structure Length: 12.01m (39.40ft),  Average Daily Traffic: 2,006 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,156 (year 2040),  Design Load: HS 15,  Features Intersected: YELLOWSTONE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.588,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 32.9m (107.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.90m (42.32ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: May 2021,  Underwater Inspection Date: August 2020,  Bridge Improvement Cost: $1,127,000,  Roadway Improvement Cost: $564,000,  Total Project Cost: $1,691,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: I00090330+09911,  Location: 19M W LIVINGSTON (Lat: 45.651197,  Lng: -110.612253),  Route carried "under" structure: ServiceCounty highway 34372,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 4,234 (year 2020),  Truck Traffic: 1%,  Features Intersected: INT WEST LIVINGSTON,  Facility Carried by Structure: I 90
Minimum Vertical Clearance: 4.39m (14.40ft),  Kilometerpoint: 3.761,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 12.2m (40.0ft)

Find on map >>   Show street view

Structure Number: I00090330+09912,  Location: 19M W LIVINGSTON (Lat: 45.651364,  Lng: -110.612122),  Route carried "under" structure: ServiceCounty highway 7408,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 4,234 (year 2020),  Truck Traffic: 1%,  Features Intersected: INT WEST LIVINGSTON,  Facility Carried by Structure: I 90
Minimum Vertical Clearance: 4.39m (14.40ft),  Kilometerpoint: 3.739,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 12.2m (40.0ft)

Find on map >>   Show street view

Structure Number: I00090332+09411,  Location: LIVINGSTON (Lat: 45.644311,  Lng: -110.573658),  Route carried "under" structure: US 89,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 13,634 (year 2020),  Truck Traffic: 1%,  Features Intersected: INT S LIVINGSTON-US HWY,  Facility Carried by Structure: I 90
Minimum Vertical Clearance: 5.48m (17.98ft),  Kilometerpoint: 85.138,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.2m (49.9ft)

Find on map >>   Show street view

Structure Number: I00090332+09412,  Location: LIVINGSTON (Lat: 45.644519,  Lng: -110.573631),  Route carried "under" structure: US 89,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 11,779 (year 2020),  Truck Traffic: 1%,  Features Intersected: INT S LIVINGSTON-US HWY,  Facility Carried by Structure: I 90
Minimum Vertical Clearance: 5.48m (17.98ft),  Kilometerpoint: 85.161,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.8m (51.8ft)

Find on map >>   Show street view

Structure Number: I00090333+05521,  Location: LIVINGSTON (Lat: 45.644367,  Lng: -110.561144),  Route carried "under" structure: County highway 34757,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 92 (year 2020),  Truck Traffic: 3%,  Features Intersected: YELLOWSTONE RIVER,  Facility Carried by Structure: I 90
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 0.744,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 56.4m (185.0ft)

Find on map >>   Show street view

Structure Number: I00090333+05522,  Location: LIVINGSTON (Lat: 45.644558,  Lng: -110.561172),  Route carried "under" structure: City street 34757,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 92 (year 2020),  Truck Traffic: 3%,  Features Intersected: YELLOWSTONE RIVER,  Facility Carried by Structure: I 90
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 0.725,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 56.4m (185.0ft)

Find on map >>   Show street view

Structure Number: I00090336+08901,  Location: 37M E LIVINGSTON (Lat: 45.677175,  Lng: -110.513336),  Route carried "under" structure: State highway 295,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 883 (year 2020),  Truck Traffic: 7%,  Features Intersected: SEP S 295,  Facility Carried by Structure: I 90
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.708,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.2m (49.9ft)

Find on map >>   Show street view

Structure Number: I00090336+08902,  Location: 37M E LIVINGSTON (Lat: 45.677325,  Lng: -110.513531),  Route carried "under" structure: State highway 295,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 883 (year 2020),  Truck Traffic: 7%,  Features Intersected: SEP S 295,  Facility Carried by Structure: I 90
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.685,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.2m (49.9ft)

Find on map >>   Show street view

Structure Number: P00011057+09501,  Location: 2M NE LIVNGSTON (Lat: 45.688106,  Lng: -110.500358),  Route carried "under" structure: Interstate 90,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 11,971 (year 2020),  Truck Traffic: 16%,  Features Intersected: INT EAST LIVINGSTON I 90,  Facility Carried by Structure: US 89
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 540.256,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.6m (77.4ft)

Find on map >>   Show street view

Structure Number: P00059000+00001,  Location: 5M NE LIVINGSTON (Lat: 45.706750,  Lng: -110.455256),  Route carried "under" structure: Interstate 90,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 12,455 (year 2020),  Truck Traffic: 17%,  Features Intersected: INT MISSION I 90,  Facility Carried by Structure: US 89
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 544.328,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.3m (60.0ft)