Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Laurence Harbor, New Jersey (NJ)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 11Number of bridges
  • 95ft / 29.2mTotal length
  • $17,301,000Total costs
  • 349,127Total average daily traffic
  • 3,776Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Laurence Harbor
  • No street view available for this location

New bridges in Laurence Harbor, NJ - historical statistics
  • New bridges - historical statistics
  • 81950-1959
  • 31970-1979
Average Bridge Daily Traffic in Laurence Harbor, NJ
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 33.3%Very good
  • 16.7%Good
  • 33.3%Satisfactory
  • 16.7%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 50.0%Satisfactory
  • 50.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 33.3%Good
  • 50.0%Satisfactory
  • 16.7%Fair
Find on map >>   Show street view

Structure Number: 1262162,  Location: 0.5 MILE WEST OF NJ 35 (Lat: 40.449331,  Lng: -74.249350),  Route carried "on" structure: County highway 626,  Year Built: 1970,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 8,040 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 9,648 (year 2040),  Design Load: HS 20,  Features Intersected: NORTH JERSEY COAST LINE,  Facility Carried by Structure: LAURENCE PARKWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.543,  Lanes on structure: 2,  Owner: State Agenciy,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.6m (47.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.66m (12.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $396,000,  Roadway Improvement Cost: $79,000,  Total Project Cost: $910,000 ( Estimate for 2020),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 361210S,  Location: 2.03MI NW OF GSP&RT35 JCT (Lat: 40.433997,  Lng: -74.251197),  Route carried "on" structure: County highway 626,  Year Built: 1953,  Year Reconstructed: 2016,  Status: Open,  Structure Length: 7.41m (24.31ft),  Average Daily Traffic: 7,416 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 9,049 (year 2040),  Design Load: HS 20,  Features Intersected: GSP SBI & SBO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.917,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Toll Authority,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.8m (87.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 9.9m (32.5ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 67.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 52.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.41m (24.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $3,539,000,  Roadway Improvement Cost: $531,000,  Total Project Cost: $4,200,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 361211N,  Location: 3.54MI SE OF GSP&RT9 JCT (Lat: 40.435347,  Lng: -74.251181),  Route carried "on" structure: County highway 626,  Year Built: 1953,  Year Reconstructed: 2016,  Status: Open,  Structure Length: 9.02m (29.59ft),  Average Daily Traffic: 7,416 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 9,049 (year 2040),  Design Load: HS 20,  Features Intersected: GSP NBI & NBO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.917,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Toll Authority,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 20.7m (67.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 9.9m (32.5ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 51.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.02m (29.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $4,048,000,  Roadway Improvement Cost: $607,000,  Total Project Cost: $5,262,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 361215E,  Location: 3 MI SE OF GSP&RT9 JCT (Lat: 40.439194,  Lng: -74.259667),  Route carried "on" structure: Other road GSP,  Year Built: 1975,  Status: Open,  Structure Length: 2.59m (8.50ft),  Average Daily Traffic: 34,073 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 41,569 (year 2040),  Design Load: HS 15,  Features Intersected: CHEESEQUAKE PARK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 195.535,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 20.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.59m (8.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,354,000,  Roadway Improvement Cost: $135,000,  Total Project Cost: $1,787,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Other
Find on map >>   Show street view

Structure Number: 361215U,  Location: 3 MI SE OF GSP&RT 9 JCT (Lat: 40.438989,  Lng: -74.259544),  Route carried "on" structure: Other road GSP,  Year Built: 1953,  Status: Open,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 62,152 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 75,825 (year 2040),  Design Load: H 20,  Features Intersected: CHEESEQUAKE PARK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 195.535,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 14.3m (46.9ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 56.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 43.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 3.29m (10.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $2,072,000,  Roadway Improvement Cost: $207,000,  Total Project Cost: $2,485,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 361217O,  Location: 3 MI SE OF GSP & RT9 JCT (Lat: 40.438333,  Lng: -74.258333),  Route carried "on" structure: Other road GSP,  Year Built: 1953,  Status: Open,  Structure Length: 3.26m (10.70ft),  Average Daily Traffic: 55,369 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 67,550 (year 2040),  Design Load: H 20,  Features Intersected: CHEESEQUAKE PARK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 195.857,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 14.3m (46.9ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 57.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 44.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 3.26m (10.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $2,013,000,  Roadway Improvement Cost: $201,000,  Total Project Cost: $2,657,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Other
Find on map >>   Show street view

Structure Number: 361210S,  Location: 2.03MI NW OF GSP&RT35 JCT (Lat: 40.433997,  Lng: -74.251197),  Route carried "under" structure: Other road GSP,  Year Built: 1953,  Structure Length: 0. m,  Average Daily Traffic: 86,611 (year 2020),  Truck Traffic: 1%,  Features Intersected: GSP SBI & SBO,  Facility Carried by Structure: MATAWAN RD(CR626)
Minimum Vertical Clearance: 4.82m (15.81ft),  Kilometerpoint: 194.731,  Lanes on structure: 2,  Lanes under structure: 6,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.8m (87.9ft)

Find on map >>   Show street view

Structure Number: 361211N,  Location: 3.54MI SE OF GSP&RT9 JCT (Lat: 40.435347,  Lng: -74.251181),  Route carried "under" structure: Other road GSP,  Year Built: 1953,  Structure Length: 0. m,  Average Daily Traffic: 85,930 (year 2020),  Truck Traffic: 1%,  Features Intersected: GSP NBI & NBO,  Facility Carried by Structure: MATAWAN RD (CR626)
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 194.892,  Lanes on structure: 2,  Lanes under structure: 6,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 361215E,  Location: 3 MI SE OF GSP&RT9 JCT (Lat: 40.439194,  Lng: -74.259667),  Route carried "under" structure: City street ,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 742 (year 2020),  Features Intersected: CHEESEQUAKE PARK ROAD,  Facility Carried by Structure: GSP SBI
Minimum Vertical Clearance: 3.53m (11.58ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 361215U,  Location: 3 MI SE OF GSP&RT 9 JCT (Lat: 40.438989,  Lng: -74.259544),  Route carried "under" structure: City street ,  Year Built: 1953,  Structure Length: 0. m,  Average Daily Traffic: 689 (year 2020),  Features Intersected: CHEESEQUAKE PARK ROAD,  Facility Carried by Structure: GSP SBO
Minimum Vertical Clearance: 3.38m (11.09ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 12.2m (40.0ft)

Find on map >>   Show street view

Structure Number: 361217O,  Location: 3 MI SE OF GSP & RT9 JCT (Lat: 40.438333,  Lng: -74.258333),  Route carried "under" structure: City street ,  Year Built: 1953,  Structure Length: 0. m,  Average Daily Traffic: 689 (year 2020),  Features Intersected: CHEESEQUAKE PARK ROAD,  Facility Carried by Structure: GSP NBO
Minimum Vertical Clearance: 3.73m (12.24ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 12.8m (42.0ft)

Discuss Laurence Harbor, New Jersey (NJ) on our hugely popular New Jersey forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.