Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Hazelwood, Missouri (MO)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 42Number of bridges
  • 486ft / 148mTotal length
  • $6,942,000Total costs
  • 1,320,023Total average daily traffic
  • 207,560Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Hazelwood
  • No street view available for this location

New bridges in Hazelwood, MO - historical statistics
  • New bridges - historical statistics
  • 11950-1959
  • 81960-1969
  • 21970-1979
  • 21980-1989
  • 31990-1999
  • 182000-2009
  • 82020-2022
Reconstructed bridges in Hazelwood, MO - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 21990-1999
Average Bridge Daily Traffic in Hazelwood, MO
Average Bridge Truck Traffic in Hazelwood, MO
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 14.3%Excellent
  • 7.1%Very good
  • 28.6%Good
  • 28.6%Satisfactory
  • 21.4%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 21.4%Excellent
  • 14.3%Very good
  • 21.4%Good
  • 7.1%Satisfactory
  • 35.7%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 21.4%Excellent
  • 14.3%Very good
  • 21.4%Good
  • 21.4%Satisfactory
  • 7.1%Fair
  • 14.3%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 28.6%Good
  • 28.6%Satisfactory
  • 42.9%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 75.0%Satisfactory
  • 25.0%Fair
Find on map >>   Show street view

Structure Number: 15533,  Location: S 36 T 47 N R 6 E (Lat: 38.779533,  Lng: -90.406942),  Route carried "on" structure: County highway ,  Year Built: 1962,  Status: Posted for load,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 1,463 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,975 (year 2040),  Design Load: HS 20,  Features Intersected: BR OF COWMIRE CR,  Facility Carried by Structure: DUNN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.770,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Fair,  Operating Rating: 35.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 22.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.17m (0.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $185,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $277,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 15538,  Location: S 24 T 46 N R 7 E (Lat: 38.800253,  Lng: -90.411478),  Route carried "on" structure: County highway ,  Year Built: 1964,  Status: Posted for load,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 8,094 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 10,927 (year 2040),  Design Load: HS 20,  Features Intersected: COWMIRE CR,  Facility Carried by Structure: AUBUCHON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 72.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.21m (0.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $180,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $270,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15561,  Location: S 5 T 46 N R 6 E (Lat: 38.759992,  Lng: -90.360778),  Route carried "on" structure: County highway ,  Year Built: 1951,  Year Reconstructed: 1989,  Status: Posted for load,  Structure Length: 3.38m (11.09ft),  Average Daily Traffic: 10,699 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 14,444 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: COLDWATER CR,  Facility Carried by Structure: JAMES S MCDONNELL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 4,  Owner: County Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.1m (43.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 15.5m (50.9ft),  Out-to-Out Width: 16.4m (53.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 56.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 31.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.43m (1.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $897,000,  Roadway Improvement Cost: $90,000,  Total Project Cost: $1,345,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 18579,  Location: S 176 T 47 N R 6 E (Lat: 38.800008,  Lng: -90.383100),  Route carried "on" structure: City street ,  Year Built: 1989,  Status: Posted for load,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 1,000 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,350 (year 2040),  Features Intersected: TESSON TRIB,  Facility Carried by Structure: RIVERWOOD PLACE DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.139,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 41.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021
Find on map >>   Show street view

Structure Number: 193,  Location: S 33 T 47 N R 6 E (Lat: 38.778261,  Lng: -90.360061),  Route carried "on" structure: US 67,  Year Built: 1960,  Year Reconstructed: 1990,  Status: Posted for load,  Structure Length: 8.75m (28.71ft),  Average Daily Traffic: 21,799 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 30,519 (year 2041),  Design Load: HS 20,  Features Intersected: IS 270
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.632,  Lanes on structure: 3,  Lanes under structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 11.2m (36.7ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 41.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,025,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $1,537,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 194,  Location: S 33 T 47 N R 6 E (Lat: 38.778250,  Lng: -90.359939),  Route carried "on" structure: US 67,  Year Built: 1960,  Year Reconstructed: 1990,  Status: Closed,  Structure Length: 8.75m (28.71ft),  Average Daily Traffic: 9,151 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 12,811 (year 2041),  Design Load: HS 20,  Features Intersected: IS 270
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 295.446,  Lanes on structure: 3,  Lanes under structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 11.2m (36.7ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,507,000,  Roadway Improvement Cost: $151,000,  Total Project Cost: $2,261,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 28386,  Location: S 23 T 47 N R 5 E (Lat: 38.797494,  Lng: -90.418417),  Route carried "on" structure: County highway ,  Year Built: 1999,  Status: Closed,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 12,454 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 16,813 (year 2040),  Design Load: HS 20,  Features Intersected: BR OF COWMIRE CR,  Facility Carried by Structure: AUBUCHON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Channel: Fair,  Culverts: Fair,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.14m (0.46ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 29117,  Location: S 278 T 47 N R 3 E (Lat: 38.777814,  Lng: -90.389267),  Route carried "on" structure: City street ,  Year Built: 2002,  Status: Open,  Structure Length: 5.88m (19.29ft),  Average Daily Traffic: 20,940 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 29,316 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: IS 270,  Facility Carried by Structure: JAMES S MCDONNELL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.309,  Lanes on structure: 9,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 29.4m (96.5ft),  Curb-To-Curb Width: 40.4m (132.5ft),  Out-to-Out Width: 41.2m (135.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 81.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 29143,  Location: S 939 T 47 N R 6 E (Lat: 38.775456,  Lng: -90.340744),  Route carried "on" structure: Interstate 170,  Year Built: 2002,  Status: Open,  Structure Length: 47.49m (155.81ft),  Average Daily Traffic: 31,358 (year 2021),  Truck Traffic: 18%,  Average Future Daily Traffic: 39,198 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: IS 270, RP DUNN RD TO IS
Minimum Vertical Clearance: 5.31m (17.42ft),  Kilometerpoint: 17.449,  Lanes on structure: 1,  Lanes under structure: 12,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 11,  Length of Maximum Span: 55.9m (183.4ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 60.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 29167,  Location: S 939 T 47 N R 6 E (Lat: 38.775186,  Lng: -90.340411),  Route carried "on" structure: Ramp State highway ,  Year Built: 2002,  Status: Open,  Structure Length: 32.77m (107.51ft),  Average Daily Traffic: 20,232 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 25,290 (year 2041),  Design Load: HS 20,  Features Intersected: IS 270, IS 170, OR 270,,  Facility Carried by Structure: RP IS270W TO IS170
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.394,  Lanes on structure: 1,  Lanes under structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Number Of Approach Spans: 5,  Length of Maximum Span: 46.6m (152.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Excellent,  Substructure: Very good,  Operating Rating: 73.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 29201,  Location: S 939 T 47 N R 6 E (Lat: 38.774328,  Lng: -90.339894),  Route carried "on" structure: Ramp State highway ,  Year Built: 2002,  Status: Open,  Structure Length: 7.47m (24.51ft),  Average Daily Traffic: 21,728 (year 2021),  Truck Traffic: 18%,  Average Future Daily Traffic: 27,160 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: OR 270,  Facility Carried by Structure: RP IS170W TO IS270
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.024,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 57.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 29204,  Location: S 939 T 47 N R 6 E (Lat: 38.775175,  Lng: -90.338433),  Route carried "on" structure: Ramp State highway ,  Year Built: 2002,  Status: Open,  Structure Length: 7.89m (25.89ft),  Average Daily Traffic: 21,728 (year 2021),  Truck Traffic: 18%,  Average Future Daily Traffic: 27,160 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: RP IS270E TO NORTH HANLE,  Facility Carried by Structure: RP IS170W TO IS270
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.225,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 45.1m (148.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Inventory Rating: 70.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Critical Feature Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 30102,  Location: S 24 T 47 N R 5 E (Lat: 38.811111,  Lng: -90.391275),  Route carried "on" structure: County highway ,  Year Built: 2003,  Status: Posted for load,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 6,246 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 8,432 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: BR OF COWMIRE CR,  Facility Carried by Structure: CHARBONIER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.9m (16.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021
Find on map >>   Show street view

Structure Number: 3161,  Location: S 939 T 47 N R 6 E (Lat: 38.774267,  Lng: -90.341417),  Route carried "on" structure: Interstate 170,  Year Built: 1978,  Status: Open,  Structure Length: 7.64m (25.07ft),  Average Daily Traffic: 13,932 (year 2021),  Truck Traffic: 18%,  Average Future Daily Traffic: 17,415 (year 2041),  Design Load: HS 20,  Features Intersected: OR 270
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.343,  Lanes on structure: 1,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 22.8m (74.8ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 76.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.87m (2.85ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $709,000,  Roadway Improvement Cost: $71,000,  Total Project Cost: $1,064,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 36405,  Location: S 33 T 47 N R 6 W (Lat: 38.779589,  Lng: -90.359581),  Route carried "on" structure: US 67,  Year Built: 2020,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 21,212 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 29,697 (year 2041),  Features Intersected: OR 270
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 295.613,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.0m (59.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.1m (65.9ft),  Curb-To-Curb Width: 18.0m (59.1ft),  Out-to-Out Width: 18.8m (61.7ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Excellent,  Operating Rating: 90.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 36408,  Location: S 33 T 47 N R 6 E (Lat: 38.778250,  Lng: -90.359939),  Route carried "on" structure: US 67,  Year Built: 2020,  Status: Open,  Structure Length: 4.92m (16.14ft),  Average Daily Traffic: 9,151 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 12,811 (year 2041),  Features Intersected: IS 270
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 295.449,  Lanes on structure: 3,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 48.2m (158.1ft),  Curb-To-Curb Width: 13.7m (44.9ft),  Out-to-Out Width: 14.5m (47.6ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Inventory Rating: 33.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 36423,  Location: S 33 T 47 N R 6 E (Lat: 38.778261,  Lng: -90.360061),  Route carried "on" structure: US 67,  Year Built: 2020,  Status: Not yet open,  Structure Length: 4.86m (15.94ft),  Average Daily Traffic: 21,799 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 30,519 (year 2041),  Features Intersected: IS 270
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 22.655,  Lanes on structure: 4,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 47.6m (156.2ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 19.7m (64.6ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 67.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 3762,  Location: S 939 T 45 N R 5 E (Lat: 38.783267,  Lng: -90.356100),  Route carried "on" structure: US 67,  Year Built: 1989,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 43,011 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 60,215 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: COLDWATER BR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.001,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 87.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 52.2 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021
Find on map >>   Show street view

Structure Number: 193,  Location: S 33 T 47 N R 6 E (Lat: 38.778261,  Lng: -90.360061),  Route carried "under" structure: Interstate 270,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 67,096 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 270,  Facility Carried by Structure: US 67 S
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 16.493,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 193,  Location: S 33 T 47 N R 6 E (Lat: 38.778261,  Lng: -90.360061),  Route carried "under" structure: Interstate 270,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 67,789 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 270,  Facility Carried by Structure: US 67 S
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 41.061,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 194,  Location: S 33 T 47 N R 6 E (Lat: 38.778250,  Lng: -90.359939),  Route carried "under" structure: Interstate 270,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 61,641 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 270,  Facility Carried by Structure: US 67 N
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 16.398,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 194,  Location: S 33 T 47 N R 6 E (Lat: 38.778250,  Lng: -90.359939),  Route carried "under" structure: Interstate 270,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 59,283 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 270,  Facility Carried by Structure: US 67 N
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 41.154,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 29117,  Location: S 278 T 47 N R 3 E (Lat: 38.777814,  Lng: -90.389267),  Route carried "under" structure: Interstate 270,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 67,096 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 270,  Facility Carried by Structure: JAMES S MCDONNELL
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 19.214,  Lanes on structure: 9,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.4m (96.5ft)

Find on map >>   Show street view

Structure Number: 29117,  Location: S 278 T 47 N R 3 E (Lat: 38.777814,  Lng: -90.389267),  Route carried "under" structure: Interstate 270,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 64,151 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 270,  Facility Carried by Structure: JAMES S MCDONNELL
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 38.354,  Lanes on structure: 9,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.4m (96.5ft)

Find on map >>   Show street view

Structure Number: 29143,  Location: S 939 T 47 N R 6 E (Lat: 38.775456,  Lng: -90.340744),  Route carried "under" structure: Ramp State highway ,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 4,408 (year 2021),  Truck Traffic: 4%,  Features Intersected: RP DUNN RD TO IS270W,  Facility Carried by Structure: IS 170 W
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 0.154,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 55.9m (183.4ft)

Find on map >>   Show street view

Structure Number: 29143,  Location: S 939 T 47 N R 6 E (Lat: 38.775456,  Lng: -90.340744),  Route carried "under" structure: Interstate 270,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 52,951 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 270,  Facility Carried by Structure: IS 170 W
Minimum Vertical Clearance: 5.51m (18.08ft),  Kilometerpoint: 14.849,  Lanes on structure: 1,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 55.9m (183.4ft)

Find on map >>   Show street view

Structure Number: 29143,  Location: S 939 T 47 N R 6 E (Lat: 38.775456,  Lng: -90.340744),  Route carried "under" structure: ServiceState highway 270,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 4,716 (year 2021),  Truck Traffic: 5%,  Features Intersected: OR 270,  Facility Carried by Structure: IS 170 W
Minimum Vertical Clearance: 5.97m (19.59ft),  Kilometerpoint: 2.158,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 55.9m (183.4ft)

Find on map >>   Show street view

Structure Number: 29143,  Location: S 939 T 47 N R 6 E (Lat: 38.775456,  Lng: -90.340744),  Route carried "under" structure: Interstate 270,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 57,151 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 270,  Facility Carried by Structure: IS 170 W
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 42.730,  Lanes on structure: 1,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 55.9m (183.4ft)

Find on map >>   Show street view

Structure Number: 29167,  Location: S 939 T 47 N R 6 E (Lat: 38.775186,  Lng: -90.340411),  Route carried "under" structure: Interstate 270,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 57,151 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 270
Minimum Vertical Clearance: 10.72m (35.17ft),  Kilometerpoint: 42.839,  Lanes on structure: 1,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 46.6m (152.9ft)

Find on map >>   Show street view

Structure Number: 29167,  Location: S 939 T 47 N R 6 E (Lat: 38.775186,  Lng: -90.340411),  Route carried "under" structure: Interstate 270,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 52,951 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 270
Minimum Vertical Clearance: 8.43m (27.66ft),  Kilometerpoint: 14.689,  Lanes on structure: 1,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 46.6m (152.9ft)

Find on map >>   Show street view

Structure Number: 29167,  Location: S 939 T 47 N R 6 E (Lat: 38.775186,  Lng: -90.340411),  Route carried "under" structure: Interstate 170,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 15,044 (year 2021),  Truck Traffic: 7%,  Features Intersected: IS 170
Minimum Vertical Clearance: 5.44m (17.85ft),  Kilometerpoint: 17.637,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 46.6m (152.9ft)

Find on map >>   Show street view

Structure Number: 29167,  Location: S 939 T 47 N R 6 E (Lat: 38.775186,  Lng: -90.340411),  Route carried "under" structure: ServiceState highway 270,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 4,716 (year 2021),  Truck Traffic: 5%,  Features Intersected: OR 270
Minimum Vertical Clearance: 7.67m (25.16ft),  Kilometerpoint: 2.108,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 46.6m (152.9ft)

Find on map >>   Show street view

Structure Number: 29201,  Location: S 939 T 47 N R 6 E (Lat: 38.774328,  Lng: -90.339894),  Route carried "under" structure: ServiceState highway 270,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 2,358 (year 2021),  Truck Traffic: 5%,  Features Intersected: OR 270
Minimum Vertical Clearance: 5.38m (17.65ft),  Kilometerpoint: 2.194,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: 29204,  Location: S 939 T 47 N R 6 E (Lat: 38.775175,  Lng: -90.338433),  Route carried "under" structure: Ramp State highway ,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 5,092 (year 2021),  Truck Traffic: 10%,  Features Intersected: RP IS270E TO NORTH HANLE,  Facility Carried by Structure: RP IS170W TO IS270
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 0.307,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 45.1m (148.0ft)

Find on map >>   Show street view

Structure Number: 3161,  Location: S 939 T 47 N R 6 E (Lat: 38.774267,  Lng: -90.341417),  Route carried "under" structure: ServiceState highway 270,  Year Built: 1978,  Structure Length: 0. m,  Average Daily Traffic: 4,716 (year 2021),  Truck Traffic: 5%,  Features Intersected: OR 270,  Facility Carried by Structure: IS 170 E
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 2.070,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.8m (74.8ft)

Find on map >>   Show street view

Structure Number: 3496,  Location: S 2093 T 47 N R 5 E (Lat: 38.772767,  Lng: -90.400428),  Route carried "under" structure: Interstate 270,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 53,039 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 270,  Facility Carried by Structure: MISSOURI BOTTOM RD
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 37.235,  Lanes on structure: 6,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.9m (107.9ft)

Find on map >>   Show street view

Structure Number: 3496,  Location: S 2093 T 47 N R 5 E (Lat: 38.772767,  Lng: -90.400428),  Route carried "under" structure: Interstate 270,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 66,450 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 270,  Facility Carried by Structure: MISSOURI BOTTOM RD
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 20.341,  Lanes on structure: 6,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.9m (107.9ft)

Find on map >>   Show street view

Structure Number: 36405,  Location: S 33 T 47 N R 6 W (Lat: 38.779589,  Lng: -90.359581),  Route carried "under" structure: ServiceState highway 270,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 418 (year 2021),  Truck Traffic: 10%,  Features Intersected: OR 270,  Facility Carried by Structure: US 67 N
Minimum Vertical Clearance: 5.10m (16.73ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 20.1m (65.9ft)

Find on map >>   Show street view

Structure Number: 36408,  Location: S 33 T 47 N R 6 E (Lat: 38.778250,  Lng: -90.359939),  Route carried "under" structure: Interstate 270,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 61,641 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 270,  Facility Carried by Structure: US 67 N
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 16.398,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 48.2m (158.1ft)

Find on map >>   Show street view

Structure Number: 36408,  Location: S 33 T 47 N R 6 E (Lat: 38.778250,  Lng: -90.359939),  Route carried "under" structure: Interstate 270,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 59,283 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 270,  Facility Carried by Structure: US 67 N
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 41.154,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 48.2m (158.1ft)

Find on map >>   Show street view

Structure Number: 36423,  Location: S 33 T 47 N R 6 E (Lat: 38.778261,  Lng: -90.360061),  Route carried "under" structure: Interstate 270,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 67,096 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 270,  Facility Carried by Structure: US 67 S
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 16.493,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 47.6m (156.2ft)

Find on map >>   Show street view

Structure Number: 36423,  Location: S 33 T 47 N R 6 E (Lat: 38.778261,  Lng: -90.360061),  Route carried "under" structure: Interstate 270,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 67,789 (year 2021),  Truck Traffic: 18%,  Features Intersected: IS 270,  Facility Carried by Structure: US 67 S
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 41.061,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 47.6m (156.2ft)

Discuss Hazelwood, Missouri (MO) on our hugely popular Missouri forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.