Bridge Statistics for Hampton, Georgia (GA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 21Number of bridges
  • 243ft / 74.0mTotal length
  • $14,113,000Total costs
  • 115,584Total average daily traffic
  • 1,508Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Hampton
  • No street view available for this location

New bridges in Hampton, GA - historical statistics
  • New bridges - historical statistics
  • 51950-1959
  • 21970-1979
  • 21990-1999
  • 82000-2009
Average Bridge Daily Traffic in Hampton, GA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 80.0%Good
  • 10.0%Satisfactory
  • 10.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 90.0%Good
  • 10.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 70.0%Good
  • 10.0%Satisfactory
  • 20.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 53.8%Very good
  • 38.5%Good
  • 7.7%Satisfactory
Find on map >>   Show street view

Structure Number: 1510001,  Location: .5 MI S OF HAMPTON (Lat: 33.365625,  Lng: -84.293017),  Route carried "on" structure: County highway 2009,  Year Built: 1979,  Status: Open,  Structure Length: 5.97m (19.59ft),  Average Daily Traffic: 4,120 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 6,180 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: CR 241- NOR-SOU RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $766,000,  Roadway Improvement Cost: $77,000,  Total Project Cost: $1,149,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1510002,  Location: IN HAMPTON (Lat: 33.383542,  Lng: -84.303150),  Route carried "on" structure: US 19,  Year Built: 1953,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 21,580 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 32,370 (year 2031),  Design Load: H 15,  Features Intersected: BEAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $227,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $341,000
Find on map >>   Show street view

Structure Number: 1510051,  Location: IN WESTSIDE OF HAMPTON (Lat: 33.381819,  Lng: -84.305947),  Route carried "on" structure: County highway 1070,  Year Built: 1993,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 6,680 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 10,020 (year 2032),  Design Load: H 15,  Features Intersected: BEAR CREEK,  Facility Carried by Structure: RICHARD PETTY BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2020,  Underwater Inspection Date: December 2019,  Bridge Improvement Cost: $266,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $399,000
Find on map >>   Show street view

Structure Number: 1510053,  Location: 2.5 MI E OF HAMPTON (Lat: 33.376275,  Lng: -84.232447),  Route carried "on" structure: County highway 1577,  Year Built: 1950,  Status: Posted for load,  Structure Length: 4.11m (13.48ft),  Average Daily Traffic: 4,480 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 6,720 (year 2031),  Design Load: H 10,  Features Intersected: TOWALIGA RIVER,  Facility Carried by Structure: HAMPTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 8.2m (26.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 36.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.55m (34.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $527,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $791,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1515028,  Location: 1 MI E OF HAMPTON (Lat: 33.377611,  Lng: -84.240172),  Route carried "on" structure: County highway 285,  Year Built: 1978,  Year Reconstructed: 2011,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 3,160 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,740 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: TOWALIGA RIVER,  Facility Carried by Structure: ROCKY CREEK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $119,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $179,000
Find on map >>   Show street view

Structure Number: 1515054,  Location: CITY OF HAMPTON (Lat: 33.389889,  Lng: -84.305350),  Route carried "on" structure: City street 544,  Year Built: 1991,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 3,270 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,905 (year 2031),  Design Load: H 15,  Features Intersected: BEAR CREEK,  Facility Carried by Structure: OAK STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.9m (3.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $129,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $193,000
Find on map >>   Show street view

Structure Number: 1515069,  Location: 1 MI W OF HAMPTON (Lat: 33.395917,  Lng: -84.308397),  Route carried "on" structure: County highway 2299,  Year Built: 2003,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 1,940 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,910 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: BEAR CREEK,  Facility Carried by Structure: REVOLUTIONARY DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $168,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $252,000
Find on map >>   Show street view

Structure Number: 1515077,  Location: 2.5 MI W OF HAMPTON (Lat: 33.369100,  Lng: -84.349208),  Route carried "on" structure: County highway 1070,  Year Built: 2004,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 2,420 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,630 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: BEAR CREEK TRIB,  Facility Carried by Structure: LOWER WOOLSEY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $172,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $258,000
Find on map >>   Show street view

Structure Number: 1515078,  Location: 1.5 MI EAST OF HAMPTON (Lat: 33.394689,  Lng: -84.252928),  Route carried "on" structure: State highway 20,  Year Built: 2004,  Status: Open,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 11,140 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 16,710 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: TOWALIGA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.750,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 14 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $781,000,  Roadway Improvement Cost: $78,000,  Total Project Cost: $1,172,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1515079,  Location: 1.5 MI EAST OF HAMPTON (Lat: 33.394528,  Lng: -84.252758),  Route carried "on" structure: State highway 20,  Year Built: 2004,  Status: Open,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 11,140 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 16,710 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: TOWALIGA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.750,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 14 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $781,000,  Roadway Improvement Cost: $78,000,  Total Project Cost: $1,172,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 151508,  Location: 0.9 MI WEST OF HAMPTON (Lat: 33.377019,  Lng: -84.293469),  Route carried "on" structure: State highway 20,  Year Built: 2005,  Status: Open,  Structure Length: 13.75m (45.11ft),  Average Daily Traffic: 13,920 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 20,880 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: COUNTY RD 241 - NS RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.578,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 15 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 40.2m (131.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,762,000,  Roadway Improvement Cost: $176,000,  Total Project Cost: $2,643,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1515081,  Location: 2.5 MI WEST FROM HAMPTON (Lat: 33.376869,  Lng: -84.308569),  Route carried "on" structure: County highway 652,  Year Built: 2005,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 2,420 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,630 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: BEAR CREEK,  Facility Carried by Structure: LOWER WOOLSEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 25.9m (85.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $320,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $480,000
Find on map >>   Show street view

Structure Number: 1515083,  Location: 0.9 MI WEST OF HAMPTON (Lat: 33.376608,  Lng: -84.293789),  Route carried "on" structure: State highway 20,  Year Built: 2005,  Status: Open,  Structure Length: 13.75m (45.11ft),  Average Daily Traffic: 13,920 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 20,880 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: COUNTY RD 241 - NS RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.578,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 15 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 40.2m (131.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $1,762,000,  Roadway Improvement Cost: $176,000,  Total Project Cost: $2,643,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1515084,  Location: 0.9 MI WEST OF HAMPTON (Lat: 33.375858,  Lng: -84.294119),  Route carried "on" structure: Ramp State highway 20,  Year Built: 2005,  Status: Open,  Structure Length: 12.44m (40.81ft),  Average Daily Traffic: 2,740 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,110 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: COUNTY RD 241 - NS RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.578,  Lanes on structure: 1,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 5 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 39.3m (128.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,159,000,  Roadway Improvement Cost: $116,000,  Total Project Cost: $1,739,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2555026,  Location: 2 MI E OF SUNNY SIDE (Lat: 33.347767,  Lng: -84.263933),  Route carried "on" structure: County highway 143,  Year Built: 1956,  Status: Posted for load,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 110 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 165 (year 2031),  Design Load: H 15,  Features Intersected: TOWALIGA RIVER TRIB,  Facility Carried by Structure: NORTH POMONA RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 1.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 0.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 41.45m (135.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $156,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $234,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2555027,  Location: 6 MI NW OF GRIFFIN (Lat: 33.348608,  Lng: -84.339958),  Route carried "on" structure: County highway 159,  Year Built: 1956,  Status: Temporarily open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 520 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 780 (year 2031),  Design Load: H 15,  Features Intersected: BEAR CREEK TRIB,  Facility Carried by Structure: STELLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 41.45m (135.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $156,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $234,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 2555042,  Location: AT HENRY CO. LINE (Lat: 33.335939,  Lng: -84.247319),  Route carried "on" structure: County highway 328,  Year Built: 1959,  Status: Temporarily open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 1,740 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,610 (year 2031),  Design Load: H 15,  Features Intersected: TOWALIGA RIVER TRIB,  Facility Carried by Structure: JORDAN HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 1.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 0.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 41.45m (135.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $156,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $234,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 1510001,  Location: .5 MI S OF HAMPTON (Lat: 33.365625,  Lng: -84.293017),  Route carried "under" structure: County highway 241,  Structure Length: 0. m,  Average Daily Traffic: 4,284 (year 1999),  Truck Traffic: 1%,  Features Intersected: FAS 2009,  Facility Carried by Structure: FAS 2009
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 151508,  Location: 0.9 MI WEST OF HAMPTON (Lat: 33.377019,  Lng: -84.293469),  Route carried "under" structure: County highway 20,  Structure Length: 0. m,  Average Daily Traffic: 2,500 (year 2003),  Truck Traffic: 7%,  Features Intersected: COUNTY ROAD 241
Minimum Vertical Clearance: 8.33m (27.33ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1515083,  Location: 0.9 MI WEST OF HAMPTON (Lat: 33.376608,  Lng: -84.293789),  Route carried "under" structure: State highway 20,  Structure Length: 0. m,  Average Daily Traffic: 2,500 (year 2003),  Truck Traffic: 7%,  Features Intersected: COUNTY ROAD 241
Minimum Vertical Clearance: 8.91m (29.23ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1515084,  Location: 0.9 MI WEST OF HAMPTON (Lat: 33.375858,  Lng: -84.294119),  Route carried "under" structure: Ramp State highway 20,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2003),  Truck Traffic: 7%,  Features Intersected: COUNTY ROAD 241
Minimum Vertical Clearance: 7.92m (25.98ft),  Kilometerpoint: 3.219,  Lanes on structure: 1,  Length of Maximum Span: 0.0m