Bridge Statistics for Gresham Park, Georgia (GA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 21Number of bridges
  • 269ft / 82.3mTotal length
  • $23,618,000Total costs
  • 1,378,932Total average daily traffic
  • 67,481Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Gresham Park
  • No street view available for this location

New bridges in Gresham Park, GA - historical statistics
  • New bridges - historical statistics
  • 31950-1959
  • 71960-1969
  • 41980-1989
  • 11990-1999
  • 12000-2009
Reconstructed bridges in Gresham Park, GA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 31970-1979
  • 01980-1989
  • 11990-1999
  • 02000-2009
  • 22010-2019
Average Bridge Daily Traffic in Gresham Park, GA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 27.3%Very good
  • 72.7%Good
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 63.6%Very good
  • 36.4%Good
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 81.8%Good
  • 18.2%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 33.3%Very good
  • 22.2%Good
  • 22.2%Satisfactory
  • 22.2%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 80.0%Good
  • 20.0%Satisfactory
Find on map >>   Show street view

Structure Number: 890054,  Location: 4 MI SW OF DECATUR (Lat: 33.720919,  Lng: -84.321239),  Route carried "on" structure: Interstate 20,  Year Built: 1959,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 132,720 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 199,080 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: SUGAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 99.779,  Lanes on structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 51.2m (168.0ft),  Skew: 33 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $622,000,  Roadway Improvement Cost: $62,000,  Total Project Cost: $932,000
Find on map >>   Show street view

Structure Number: 890102,  Location: 9.5 MI S OF DECATUR (Lat: 33.680311,  Lng: -84.314942),  Route carried "on" structure: Interstate 285,  Year Built: 1966,  Year Reconstructed: 1984,  Status: Open,  Structure Length: 5.94m (19.49ft),  Average Daily Traffic: 148,250 (year 2011),  Truck Traffic: 13%,  Average Future Daily Traffic: 222,375 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: SOUTH RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 82.077,  Lanes on structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 46.3m (151.9ft),  Skew: 33 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 48.0m (157.5ft),  Out-to-Out Width: 49.7m (163.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 34.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,424,000,  Roadway Improvement Cost: $242,000,  Total Project Cost: $3,636,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 890103,  Location: 9.5 MI S OF DECATUR (Lat: 33.672631,  Lng: -84.329089),  Route carried "on" structure: Interstate 285,  Year Built: 1967,  Year Reconstructed: 1978,  Status: Open,  Structure Length: 6.86m (22.51ft),  Average Daily Traffic: 105,190 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 157,785 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: NS RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 83.686,  Lanes on structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 39.0m (128.0ft),  Skew: 34 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 28.3m (92.8ft),  Curb-To-Curb Width: 41.0m (134.5ft),  Out-to-Out Width: 42.6m (139.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,318,000,  Roadway Improvement Cost: $232,000,  Total Project Cost: $3,477,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 890104,  Location: 9.5 MI S OF DECATUR (Lat: 33.672228,  Lng: -84.330239),  Route carried "on" structure: Interstate 285,  Year Built: 1967,  Year Reconstructed: 1983,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 105,190 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 157,785 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: SOUTH RIVER TRIB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 83.686,  Lanes on structure: 9,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 39.0m (128.0ft),  Skew: 39 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Very good,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $318,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $477,000
Find on map >>   Show street view

Structure Number: 890148,  Location: 9 MI S OF DECATUR (Lat: 33.683931,  Lng: -84.310003),  Route carried "on" structure: City street 9092,  Year Built: 1966,  Status: Open,  Structure Length: 7.53m (24.70ft),  Average Daily Traffic: 21,150 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 31,725 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: I-285 (SR 407),  Facility Carried by Structure: BOULDERCREST RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 4,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 21 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.9m (71.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 22.1m (72.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,491,000,  Roadway Improvement Cost: $149,000,  Total Project Cost: $2,237,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 890149,  Location: 6 MI S OF DECATUR (Lat: 33.688969,  Lng: -84.330039),  Route carried "on" structure: City street 9082,  Year Built: 1958,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 3.09m (10.14ft),  Average Daily Traffic: 5,350 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 8,025 (year 2032),  Design Load: H 15,  Features Intersected: ENTRENCHMENT CREEK,  Facility Carried by Structure: CONSTITUTION ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.3m (37.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 58.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.45m (31.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $387,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $580,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 89015,  Location: 5.3 MI S OF DECATUR (Lat: 33.694719,  Lng: -84.303978),  Route carried "on" structure: City street 9119,  Year Built: 1965,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 12,240 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 18,360 (year 2031),  Design Load: H 15,  Features Intersected: SUGAR CREEK,  Facility Carried by Structure: CLIFTON CHURCH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.0m

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000
Find on map >>   Show street view

Structure Number: 890151,  Location: 5.3 MI SE OF DECATUR (Lat: 33.701169,  Lng: -84.332239),  Route carried "on" structure: County highway 9120,  Year Built: 1958,  Year Reconstructed: 2018,  Status: Posted for load,  Structure Length: 3.60m (11.81ft),  Average Daily Traffic: 1,320 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,980 (year 2031),  Design Load: H 15,  Features Intersected: ENTRENCHMENT CREEK,  Facility Carried by Structure: KEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.7m (44.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Fair,  Operating Rating: 62.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 43.83m (143.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $461,000,  Roadway Improvement Cost: $46,000,  Total Project Cost: $692,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 890187,  Location: 4 MI SE OF DECATUR (Lat: 33.715689,  Lng: -84.323558),  Route carried "on" structure: City street 9234,  Year Built: 1960,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 3,150 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,725 (year 2031),  Design Load: H 15,  Features Intersected: SUGAR CREEK,  Facility Carried by Structure: BRANNEN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $141,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $211,000
Find on map >>   Show street view

Structure Number: 890282,  Location: 5.5 MI S OF DECATUR (Lat: 33.675128,  Lng: -84.327622),  Route carried "on" structure: Ramp Interstate 285,  Year Built: 1984,  Status: Open,  Structure Length: 9.20m (30.18ft),  Average Daily Traffic: 74,810 (year 2011),  Truck Traffic: 13%,  Average Future Daily Traffic: 112,215 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: SR413(I675R N TO I285 W)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 83.686,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 49.7m (163.1ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,180,000,  Roadway Improvement Cost: $118,000,  Total Project Cost: $1,770,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 89029,  Location: 7 MI S OF DECATUR (Lat: 33.672697,  Lng: -84.328325),  Route carried "on" structure: Interstate 675,  Year Built: 1984,  Status: Open,  Structure Length: 13.78m (45.21ft),  Average Daily Traffic: 74,810 (year 2011),  Truck Traffic: 13%,  Average Future Daily Traffic: 112,215 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: I-285 (SR 407)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.093,  Lanes on structure: 2,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 51.8m (169.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Operating Rating: 47.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,766,000,  Roadway Improvement Cost: $177,000,  Total Project Cost: $2,649,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 890291,  Location: 9.5 MI S OF DECATUR (Lat: 33.673769,  Lng: -84.326058),  Route carried "on" structure: Interstate 675,  Year Built: 1984,  Status: Open,  Structure Length: 8.53m (27.99ft),  Average Daily Traffic: 74,810 (year 2011),  Truck Traffic: 13%,  Average Future Daily Traffic: 112,215 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: I-285 (SR 407)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.093,  Lanes on structure: 2,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 47.2m (154.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,094,000,  Roadway Improvement Cost: $109,000,  Total Project Cost: $1,641,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 890292,  Location: 5 MI S OF DECATUR (Lat: 33.675108,  Lng: -84.329358),  Route carried "on" structure: Ramp Interstate 675,  Year Built: 1984,  Status: Open,  Structure Length: 4.54m (14.90ft),  Average Daily Traffic: 74,810 (year 2011),  Truck Traffic: 13%,  Average Future Daily Traffic: 112,215 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: NS RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.093,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.4m (57.1ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $582,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $873,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 890318,  Location: 6 MI S OF DECATUR (Lat: 33.716000,  Lng: -84.310453),  Route carried "on" structure: City street 101,  Year Built: 1992,  Status: Open,  Structure Length: 6.40m (21.00ft),  Average Daily Traffic: 8,550 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 12,825 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: I-20,  Facility Carried by Structure: GRESHAM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 4,  Lanes under structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.0m (105.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 20.2m (66.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,268,000,  Roadway Improvement Cost: $127,000,  Total Project Cost: $1,902,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 895001,  Location: 4 MI S OF DECATUR (Lat: 33.702989,  Lng: -84.322189),  Route carried "on" structure: County highway 94,  Year Built: 1969,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 2,202 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,303 (year 2031),  Design Load: H 15,  Features Intersected: SUGAR CREEK,  Facility Carried by Structure: MARY LOU LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $168,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $252,000
Find on map >>   Show street view

Structure Number: 895157,  Location: 6.5 MI S OF DECATUR (Lat: 33.679628,  Lng: -84.307878),  Route carried "on" structure: County highway 5187,  Year Built: 2007,  Status: Open,  Structure Length: 7.07m (23.20ft),  Average Daily Traffic: 17,680 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 26,520 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: SOUTH RIVER,  Facility Carried by Structure: BOULDERCREST ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 33.8m (110.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 19.0m (62.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,401,000,  Roadway Improvement Cost: $140,000,  Total Project Cost: $2,101,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 890148,  Location: 9 MI S OF DECATUR (Lat: 33.683931,  Lng: -84.310003),  Route carried "under" structure: Interstate 285,  Structure Length: 0. m,  Average Daily Traffic: 129,500 (year 1999),  Truck Traffic: 1%,  Features Intersected: M-9092 BOULDERCREST RD.,  Facility Carried by Structure: BOULDERCREST RD
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 82.077,  Lanes on structure: 4,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 890282,  Location: 5.5 MI S OF DECATUR (Lat: 33.675128,  Lng: -84.327622),  Route carried "under" structure: Ramp Interstate 675,  Structure Length: 0. m,  Average Daily Traffic: 60,500 (year 1999),  Truck Traffic: 1%,  Features Intersected: I-285 RAMP TO I-675 SB
Minimum Vertical Clearance: 6.17m (20.24ft),  Kilometerpoint: 16.093,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 89029,  Location: 7 MI S OF DECATUR (Lat: 33.672697,  Lng: -84.328325),  Route carried "under" structure: Interstate 285,  Structure Length: 0. m,  Average Daily Traffic: 79,600 (year 1999),  Truck Traffic: 1%,  Features Intersected: I-675 SBL (SR 413),  Facility Carried by Structure: I-675 SBL
Minimum Vertical Clearance: 7.59m (24.90ft),  Kilometerpoint: 83.686,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 890291,  Location: 9.5 MI S OF DECATUR (Lat: 33.673769,  Lng: -84.326058),  Route carried "under" structure: Interstate 285,  Structure Length: 0. m,  Average Daily Traffic: 115,600 (year 1999),  Truck Traffic: 1%,  Features Intersected: I-675 NBL (SR 413),  Facility Carried by Structure: I-675 NBL
Minimum Vertical Clearance: 6.80m (22.31ft),  Kilometerpoint: 83.686,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 890318,  Location: 6 MI S OF DECATUR (Lat: 33.716000,  Lng: -84.310453),  Route carried "under" structure: Interstate 20,  Structure Length: 0. m,  Average Daily Traffic: 131,500 (year 1999),  Truck Traffic: 1%,  Features Intersected: CR 101 GRESHAM ROAD,  Facility Carried by Structure: GRESHAM ROAD
Minimum Vertical Clearance: 6.85m (22.47ft),  Kilometerpoint: 101.389,  Lanes on structure: 4,  Length of Maximum Span: 0.0m

Discuss Gresham Park, Georgia (GA) on our hugely popular Georgia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.