Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Flowery Branch, Georgia (GA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 18Number of bridges
  • 203ft / 62.0mTotal length
  • $91,706,000Total costs
  • 315,014Total average daily traffic
  • 3,165Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Flowery Branch
  • No street view available for this location

New bridges in Flowery Branch, GA - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 51960-1969
  • 11970-1979
  • 31980-1989
  • 12000-2009
  • 22010-2019
Average Bridge Daily Traffic in Flowery Branch, GA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 12.5%Excellent
  • 62.5%Good
  • 25.0%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 12.5%Excellent
  • 25.0%Very good
  • 50.0%Good
  • 12.5%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 12.5%Excellent
  • 75.0%Good
  • 12.5%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 37.5%Very good
  • 25.0%Good
  • 37.5%Satisfactory
Find on map >>   Show street view

Structure Number: 1390009,  Location: 1.4 MI E OF FLOWERY BR (Lat: 34.192358,  Lng: -83.902069),  Route carried "on" structure: State highway 13,  Year Built: 1968,  Status: Open,  Structure Length: 6.71m (22.01ft),  Average Daily Traffic: 13,110 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 19,665 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 419 (I-985 US 23),  Facility Carried by Structure: ATLANTA HIGHWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.656,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.9m (75.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $860,000,  Roadway Improvement Cost: $86,000,  Total Project Cost: $1,289,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1390043,  Location: .7 MI SE OF FLOWERY BR (Lat: 34.178758,  Lng: -83.914208),  Route carried "on" structure: Interstate 985,  Year Built: 1968,  Status: Open,  Structure Length: 4.08m (13.39ft),  Average Daily Traffic: 53,410 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 80,115 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: S-2920 SPOUT SPRINGS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.312,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 11.8m (38.7ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $524,000,  Roadway Improvement Cost: $52,000,  Total Project Cost: $785,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1390044,  Location: .7 MI SE OF FLOWERY BR (Lat: 34.178897,  Lng: -83.914458),  Route carried "on" structure: Interstate 985,  Year Built: 1968,  Status: Open,  Structure Length: 4.48m (14.70ft),  Average Daily Traffic: 52,640 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 78,960 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: S-2920 SPOUT SPRINGS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.312,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.0m (68.9ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $574,000,  Roadway Improvement Cost: $57,000,  Total Project Cost: $862,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1390057,  Location: 1.7 MI S OF FLOWERY BR (Lat: 34.160078,  Lng: -83.927647),  Route carried "on" structure: County highway 621,  Year Built: 1968,  Status: Open,  Structure Length: 6.98m (22.90ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: HS 15,  Features Intersected: SR 419 (I-985 US 23),  Facility Carried by Structure: WADE ORR ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.2m (76.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $895,000,  Roadway Improvement Cost: $89,000,  Total Project Cost: $1,342,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1390059,  Location: 1.1 MI W OF FLOWERY BR (Lat: 34.186028,  Lng: -83.943439),  Route carried "on" structure: County highway 1293,  Year Built: 1961,  Status: Open,  Structure Length: 10.49m (34.42ft),  Average Daily Traffic: 6,940 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 10,410 (year 2032),  Design Load: H 20,  Features Intersected: FLOWERY BRANCH (LAKE),  Facility Carried by Structure: McEVER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 45.7m (149.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2021,  Underwater Inspection Date: June 2020,  Bridge Improvement Cost: $1,344,000,  Roadway Improvement Cost: $134,000,  Total Project Cost: $2,016,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 139502,  Location: IN FLOWERY BRANCH (Lat: 34.181089,  Lng: -83.925969),  Route carried "on" structure: County highway 625,  Year Built: 1985,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 520 (year 2012),  Truck Traffic: 5%,  Average Future Daily Traffic: 780 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: FLOWERY BRANCH,  Facility Carried by Structure: MULBERRY STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Good,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $86,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $129,000
Find on map >>   Show street view

Structure Number: 1395021,  Location: 3.5 MI SE OF FLOWERY BR. (Lat: 34.158469,  Lng: -83.871789),  Route carried "on" structure: County highway 634,  Year Built: 1986,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 2,340 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,510 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: MULBERRY CREEK,  Facility Carried by Structure: CASH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $129,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $193,000
Find on map >>   Show street view

Structure Number: 1395022,  Location: 4.3 MI SE OF FLOWERY BR. (Lat: 34.125278,  Lng: -83.898528),  Route carried "on" structure: County highway 654,  Year Built: 1986,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 1,180 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,770 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: MITCHELL CREEK,  Facility Carried by Structure: BLACK JACK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000
Find on map >>   Show street view

Structure Number: 1395061,  Location: 4 MI SE OF FLOWERY BR (Lat: 34.147208,  Lng: -83.879008),  Route carried "on" structure: County highway 1297,  Year Built: 1979,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: MULBERRY CREEK,  Facility Carried by Structure: UNION CIRCLE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $145,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $217,000
Find on map >>   Show street view

Structure Number: 1395084,  Location: 1.1 MI SW OF FLOWERY BR (Lat: 34.178039,  Lng: -83.929658),  Route carried "on" structure: State highway 13,  Year Built: 1931,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 7,040 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 10,560 (year 2032),  Design Load: H 15,  Features Intersected: FLOWERY BRANCH,  Facility Carried by Structure: ATLANTA HIGHWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: April 2021,  Underwater Inspection Date: June 2020,  Bridge Improvement Cost: $86,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $129,000
Find on map >>   Show street view

Structure Number: 13951,  Location: CITY OF FLOWERY BRANCH (Lat: 34.208428,  Lng: -83.904972),  Route carried "on" structure: County highway 99999,  Year Built: 2001,  Status: Open,  Structure Length: 5.64m (18.50ft),  Average Daily Traffic: 500 (year 2002),  Truck Traffic: 1%,  Average Future Daily Traffic: 10 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: NORFOLK SOUTHERN,  Facility Carried by Structure: HF REED INDUSTRIAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 26.5m (86.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $723,000,  Roadway Improvement Cost: $72,000,  Total Project Cost: $1,084,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1395114,  Location: 2 MI S OF OAKWOOD (Lat: 34.200919,  Lng: -83.894336),  Route carried "on" structure: Ramp Interstate 985,  Year Built: 2019,  Status: Open,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 3,897 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 6,140 (year 2040),  Design Load: HL 93,  Features Intersected: MUD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.531,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 93.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.75m (15.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $11,544,000,  Roadway Improvement Cost: $1,154,000,  Total Project Cost: $17,316,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1395116,  Location: 1.9 MI SOUTH OF OAKWOOD (Lat: 34.202219,  Lng: -83.893861),  Route carried "on" structure: County highway 62515,  Year Built: 2019,  Status: Open,  Structure Length: 15.15m (49.70ft),  Average Daily Traffic: 16,157 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 25,460 (year 2040),  Design Load: HL 93,  Features Intersected: I-985 (US 23) STREAM 15,  Facility Carried by Structure: HF REED IND. PKWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 6,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 28.0m (91.9ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 39.6m (129.9ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 28.0m (91.9ft),  Out-to-Out Width: 32.1m (105.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 73.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 18.17m (59.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $44,104,000,  Roadway Improvement Cost: $4,410,000,  Total Project Cost: $66,156,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1390009,  Location: 1.4 MI E OF FLOWERY BR (Lat: 34.192358,  Lng: -83.902069),  Route carried "under" structure: Interstate 985,  Structure Length: 0. m,  Average Daily Traffic: 45,600 (year 1998),  Truck Traffic: 1%,  Features Intersected: SR 13 ATLANTA HIGHWAY,  Facility Carried by Structure: ATLANTA HIGHWAY
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 20.921,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1390043,  Location: .7 MI SE OF FLOWERY BR (Lat: 34.178758,  Lng: -83.914208),  Route carried "under" structure: County highway 2920,  Structure Length: 0. m,  Average Daily Traffic: 10,200 (year 1998),  Truck Traffic: 1%,  Features Intersected: SR 419 NBL (I-985 US 23),  Facility Carried by Structure: I-985 NBL (US 23)
Minimum Vertical Clearance: 5.20m (17.06ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1390044,  Location: .7 MI SE OF FLOWERY BR (Lat: 34.178897,  Lng: -83.914458),  Route carried "under" structure: County highway 2920,  Structure Length: 0. m,  Average Daily Traffic: 10,200 (year 1998),  Truck Traffic: 1%,  Features Intersected: SR 419 SBL (I-985 US 23),  Facility Carried by Structure: I-985 SBL (US 23)
Minimum Vertical Clearance: 6.29m (20.64ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1390057,  Location: 1.7 MI S OF FLOWERY BR (Lat: 34.160078,  Lng: -83.927647),  Route carried "under" structure: Interstate 985,  Structure Length: 0. m,  Average Daily Traffic: 44,700 (year 1998),  Truck Traffic: 1%,  Features Intersected: CR 621 WADE ORR ROAD,  Facility Carried by Structure: WADE ORR ROAD
Minimum Vertical Clearance: 5.56m (18.24ft),  Kilometerpoint: 16.093,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1395116,  Location: 1.9 MI SOUTH OF OAKWOOD (Lat: 34.202219,  Lng: -83.893861),  Route carried "under" structure: Interstate 985,  Structure Length: 0. m,  Average Daily Traffic: 45,600 (year 1998),  Truck Traffic: 1%,  Features Intersected: HF REED IND. PKWY,  Facility Carried by Structure: HF REED IND. PKWY
Minimum Vertical Clearance: 6.27m (20.57ft),  Kilometerpoint: 22.531,  Lanes on structure: 6,  Length of Maximum Span: 0.0m

Discuss Flowery Branch, Georgia (GA) on our hugely popular Georgia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.