  • National Bridge Inventory (NBI) Statistics
  • 33Number of bridges
  • 364ft / 111mTotal length
  • $21,135,000Total costs
  • 73,828Total average daily traffic
  • 4,358Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Eatonton
  • No street view available for this location

New bridges in Eatonton, GA - historical statistics
  • New bridges - historical statistics
  • 21930-1939
  • 21940-1949
  • 31950-1959
  • 41960-1969
  • 31970-1979
  • 21980-1989
  • 51990-1999
  • 62000-2009
  • 22010-2019
Average Bridge Daily Traffic in Eatonton, GA
Average Bridge Truck Traffic in Eatonton, GA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 66.7%Good
  • 25.0%Satisfactory
  • 8.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 41.7%Very good
  • 33.3%Good
  • 16.7%Satisfactory
  • 8.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 8.3%Very good
  • 50.0%Good
  • 33.3%Satisfactory
  • 8.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 40.7%Very good
  • 3.7%Good
  • 40.7%Satisfactory
  • 14.8%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 52.9%Good
  • 29.4%Satisfactory
  • 17.6%Fair
Find on map >>   Show street view

Structure Number: 2370009,  Location: 4.8 MI SW OF EATONTON (Lat: 33.261536,  Lng: -83.418044),  Route carried "on" structure: US 129,  Year Built: 1967,  Status: Open,  Structure Length: 8.69m (28.51ft),  Average Daily Traffic: 4,230 (year 2011),  Truck Traffic: 22%,  Average Future Daily Traffic: 6,345 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: LITTLE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.656,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 6,  Length of Maximum Span: 17.4m (57.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2020,  Underwater Inspection Date: June 2021,  Bridge Improvement Cost: $1,114,000,  Roadway Improvement Cost: $111,000,  Total Project Cost: $1,670,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 237001,  Location: 4.25 MI NE OF EATONTON (Lat: 33.375789,  Lng: -83.323400),  Route carried "on" structure: State highway 44,  Year Built: 1946,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 4,440 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 6,660 (year 2031),  Design Load: H 15,  Features Intersected: CROOKED CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.359,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 41.21m (135.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000
Find on map >>   Show street view

Structure Number: 2370013,  Location: 3.1 MI NW OF EATONTON (Lat: 33.353000,  Lng: -83.433278),  Route carried "on" structure: County highway 776,  Year Built: 1959,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 450 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 675 (year 2031),  Design Load: H 15,  Features Intersected: GLADY CREEK TRIB,  Facility Carried by Structure: GODFREY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000
Find on map >>   Show street view

Structure Number: 2370014,  Location: 3.5 MI NW OF EATONTON (Lat: 33.356558,  Lng: -83.439258),  Route carried "on" structure: County highway 776,  Year Built: 1959,  Status: Posted for load,  Structure Length: 3.20m (10.50ft),  Average Daily Traffic: 450 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 675 (year 2031),  Design Load: H 15,  Features Intersected: GLADY CREEK,  Facility Carried by Structure: GODFREY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 25.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 15.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $410,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $615,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 237002,  Location: 8.5 MI W OF EATONTON (Lat: 33.352808,  Lng: -83.534306),  Route carried "on" structure: County highway 2397,  Year Built: 1966,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 310 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 465 (year 2031),  Design Load: H 15,  Features Intersected: BEAVERDAM CREEK,  Facility Carried by Structure: GLADES ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $117,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $176,000
Find on map >>   Show street view

Structure Number: 2370022,  Location: 6 MI NW OF EATONTON (Lat: 33.403069,  Lng: -83.433553),  Route carried "on" structure: County highway 2397,  Year Built: 1970,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 310 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 465 (year 2031),  Design Load: H 15,  Features Intersected: GLADY CREEK,  Facility Carried by Structure: GLADES ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.875,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.0m (13.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $160,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $240,000
Find on map >>   Show street view

Structure Number: 2370023,  Location: 1.45 MI W OF EATONTON (Lat: 33.319469,  Lng: -83.409744),  Route carried "on" structure: State highway 16,  Year Built: 1992,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 2,980 (year 2011),  Truck Traffic: 12%,  Average Future Daily Traffic: 4,470 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: LITTLE RIVER TRIB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.875,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 5 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $117,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $176,000
Find on map >>   Show street view

Structure Number: 2370025,  Location: 3 MI W OF EATONTON (Lat: 33.313983,  Lng: -83.436894),  Route carried "on" structure: State highway 16,  Year Built: 1997,  Status: Open,  Structure Length: 14.33m (47.01ft),  Average Daily Traffic: 2,980 (year 2011),  Truck Traffic: 12%,  Average Future Daily Traffic: 4,470 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: LITTLE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.656,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 35.1m (115.2ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,836,000,  Roadway Improvement Cost: $184,000,  Total Project Cost: $2,755,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2375001,  Location: 6 MI N OF EATONTON (Lat: 33.413444,  Lng: -83.395094),  Route carried "on" structure: County highway 2,  Year Built: 1950,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Design Load: H 15,  Features Intersected: LITTLE GLADY CREEK,  Facility Carried by Structure: ROCK EAGLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Channel: Very good,  Culverts: Fair,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 41.45m (135.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $156,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $234,000
Find on map >>   Show street view

Structure Number: 2375006,  Location: 4.5 MI NW OF EATONTON (Lat: 33.338536,  Lng: -83.464597),  Route carried "on" structure: County highway 29,  Year Built: 1940,  Year Reconstructed: 2004,  Status: Posted for load,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 10 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 15 (year 2031),  Features Intersected: LITTLE RIVER,  Facility Carried by Structure: MARTINS MILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 3.5m (11.5ft),  Out-to-Out Width: 3.7m (12.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 21.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 14.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 166.30m (545.60ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2020,  Underwater Inspection Date: June 2021,  Bridge Improvement Cost: $511,000,  Roadway Improvement Cost: $51,000,  Total Project Cost: $767,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 237501,  Location: 8.5 MI S OF EATONTON (Lat: 33.202769,  Lng: -83.380761),  Route carried "on" structure: County highway 72,  Year Built: 1982,  Status: Open,  Structure Length: 9.85m (32.32ft),  Average Daily Traffic: 1,840 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,760 (year 2031),  Design Load: HS 15,  Features Intersected: LITTLE RIVER,  Facility Carried by Structure: TWIN BRIDGES ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2020,  Underwater Inspection Date: June 2021,  Bridge Improvement Cost: $1,262,000,  Roadway Improvement Cost: $126,000,  Total Project Cost: $1,893,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2375013,  Location: 1.5 MI SE OF EATONTON (Lat: 33.315508,  Lng: -83.365528),  Route carried "on" structure: County highway 90,  Year Built: 1993,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 870 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,305 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: ROOTY CREEK,  Facility Carried by Structure: MLK JR DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000
Find on map >>   Show street view

Structure Number: 2375014,  Location: 4.8 MI SE OF EATONTON (Lat: 33.284728,  Lng: -83.323089),  Route carried "on" structure: County highway 90,  Year Built: 1984,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: TURKEY CREEK,  Facility Carried by Structure: GOLSTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.047,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $123,000
Find on map >>   Show street view

Structure Number: 237502,  Location: 8.5 MI NE OF EATONTON (Lat: 33.389300,  Lng: -83.261072),  Route carried "on" structure: County highway 122,  Year Built: 1978,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: LICK CREEK TRIB,  Facility Carried by Structure: WARDS CHAPEL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2020,  Underwater Inspection Date: June 2021,  Bridge Improvement Cost: $94,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $141,000
Find on map >>   Show street view

Structure Number: 2375023,  Location: 4.8 MI SW OF EATONTON (Lat: 33.263692,  Lng: -83.421625),  Route carried "on" structure: County highway 181,  Year Built: 1938,  Status: Posted for load,  Structure Length: 13.08m (42.91ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Design Load: H 15,  Features Intersected: LITTLE RIVER,  Facility Carried by Structure: OLD MACON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 6,  Length of Maximum Span: 50.9m (167.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 5.7m (18.7ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 27.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 53.04m (174.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,676,000,  Roadway Improvement Cost: $168,000,  Total Project Cost: $2,514,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2375026,  Location: 3.6 MI SW OF EATONTON (Lat: 33.288853,  Lng: -83.432675),  Route carried "on" structure: County highway 212,  Year Built: 1960,  Status: Open,  Structure Length: 9.75m (31.99ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: H 15,  Features Intersected: LITTLE RIVER,  Facility Carried by Structure: GLENWOOD SPGS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.265,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 19.5m (64.0ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Fair,  Operating Rating: 32.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 49.93m (163.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,250,000,  Roadway Improvement Cost: $125,000,  Total Project Cost: $1,875,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2375028,  Location: 1.5 MI N OF EATONTON (Lat: 33.350536,  Lng: -83.381044),  Route carried "on" structure: County highway 214,  Year Built: 1938,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 1,096 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,644 (year 2031),  Design Load: H 15,  Features Intersected: ROOTY CREEK,  Facility Carried by Structure: LOWER HARMONY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $123,000
Find on map >>   Show street view

Structure Number: 237503,  Location: 11 MI NE OF EATONTON (Lat: 33.471900,  Lng: -83.308711),  Route carried "on" structure: County highway 215,  Year Built: 1978,  Status: Open,  Structure Length: 6.37m (20.90ft),  Average Daily Traffic: 1,520 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,280 (year 2031),  Design Load: HS 15,  Features Intersected: SUGAR CREEK,  Facility Carried by Structure: PARKS MILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2020,  Underwater Inspection Date: June 2021,  Bridge Improvement Cost: $817,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $1,225,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2375037,  Location: 2.9 MI E OF EATONTON (Lat: 33.324431,  Lng: -83.337911),  Route carried "on" structure: County highway 1085,  Year Built: 1967,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 580 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 870 (year 2031),  Design Load: H 15,  Features Intersected: ROOTY CREEK TRIB,  Facility Carried by Structure: OCONEE SPRINGS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $98,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $147,000
Find on map >>   Show street view

Structure Number: 2375039,  Location: 5.2 MI SW OF EATONTON (Lat: 33.257678,  Lng: -83.405158),  Route carried "on" structure: County highway 196,  Year Built: 1993,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: LITTLE RIVER TRIB,  Facility Carried by Structure: RIVER OAK DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $109,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $164,000
Find on map >>   Show street view

Structure Number: 237504,  Location: 3 MI NW OF EATONTON (Lat: 33.335903,  Lng: -83.440183),  Route carried "on" structure: County highway 29,  Year Built: 1993,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 104 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 156 (year 2031),  Design Load: H 15,  Features Intersected: GLADY CREEK,  Facility Carried by Structure: MARTINS MILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $90,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $135,000
Find on map >>   Show street view

Structure Number: 2375044,  Location: 2.8 MI SW OF EATONTON (Lat: 33.295228,  Lng: -83.416828),  Route carried "on" structure: County highway 212,  Year Built: 2003,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 1,310 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,965 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: LITTLE RIVER TRIB,  Facility Carried by Structure: GLENWOOD SPGS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.875,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $141,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $211,000
Find on map >>   Show street view

Structure Number: 2375047,  Location: 0.8 MI E OF EATONTON (Lat: 33.331319,  Lng: -83.375481),  Route carried "on" structure: State highway 16,  Year Built: 2008,  Status: Open,  Structure Length: 6.55m (21.49ft),  Average Daily Traffic: 11,230 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 16,845 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: ROOTY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.093,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 29.0m (95.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 17.2m (56.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $840,000,  Roadway Improvement Cost: $84,000,  Total Project Cost: $1,260,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2375048,  Location: 3.5 MI SE OF EATONTON (Lat: 33.288150,  Lng: -83.345508),  Route carried "on" structure: County highway 89,  Year Built: 2008,  Status: Open,  Structure Length: 3.57m (11.71ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: ROOTY CREEK,  Facility Carried by Structure: PARKS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 35.7m (117.1ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $457,000,  Roadway Improvement Cost: $46,000,  Total Project Cost: $686,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2375049,  Location: 1 MI W OF EATONTON (Lat: 33.323661,  Lng: -83.408711),  Route carried "on" structure: County highway 40,  Year Built: 2008,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 1,096 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,644 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: LITTLE RIVER TRIB,  Facility Carried by Structure: CHURCH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $123,000
Find on map >>   Show street view

Structure Number: 237505,  Location: 8 MI NE OF EATONTON (Lat: 33.423658,  Lng: -83.309139),  Route carried "on" structure: County highway 133,  Year Built: 2008,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Design Load: H 15,  Features Intersected: LICK CREEK,  Facility Carried by Structure: ALEXANDER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $211,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $316,000
Find on map >>   Show street view

Structure Number: 2375051,  Location: 1.1 MI E OF EATONTON (Lat: 33.327875,  Lng: -83.367236),  Route carried "on" structure: County highway 1085,  Year Built: 2008,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 580 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 870 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: ROOTY CREEK,  Facility Carried by Structure: OCONEE SPRINGS ROA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000
Find on map >>   Show street view

Structure Number: 2375052,  Location: 4.0 MI S OF EATONTON (Lat: 33.274558,  Lng: -83.366664),  Route carried "on" structure: US 441,  Year Built: 2012,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 14,000 (year 2010),  Truck Traffic: 8%,  Average Future Daily Traffic: 22,800 (year 2030),  Design Load: HS 20+Mod,  Features Intersected: DENNIS STATION
Minimum Vertical Clearance: 5.61m (18.41ft),  Kilometerpoint: 12.875,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $938,000,  Roadway Improvement Cost: $94,000,  Total Project Cost: $1,407,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2375053,  Location: 4,0 MI S OF EATONTON (Lat: 33.274361,  Lng: -83.366725),  Route carried "on" structure: US 441,  Year Built: 2012,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 14,000 (year 2010),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,280 (year 2030),  Design Load: HS 20+Mod,  Features Intersected: DENNIS STATION
Minimum Vertical Clearance: 5.76m (18.90ft),  Kilometerpoint: 12.875,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $938,000,  Roadway Improvement Cost: $94,000,  Total Project Cost: $1,407,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2375031,  Location: CITY OF EATONTON (Lat: 33.328256,  Lng: -83.387872),  Route carried "under" structure: City street 509,  Structure Length: 0. m,  Average Daily Traffic: 1,096 (year 2011),  Truck Traffic: 1%,  Features Intersected: CS 509 E HARRIS STREET,  Facility Carried by Structure: NOR-SOU (733045G)
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 0.000,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 2375032,  Location: CITY OF EATONTON (Lat: 33.327153,  Lng: -83.387222),  Route carried "under" structure: City street 510,  Structure Length: 0. m,  Average Daily Traffic: 1,096 (year 2011),  Truck Traffic: 1%,  Features Intersected: CS 510 EAST MARION ST.,  Facility Carried by Structure: NOR-SOU (733044A)
Minimum Vertical Clearance: 2.18m (7.15ft),  Kilometerpoint: 0.000,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 2375052,  Location: 4.0 MI S OF EATONTON (Lat: 33.274558,  Lng: -83.366664),  Route carried "under" structure: County highway 66,  Structure Length: 0. m,  Average Daily Traffic: 1,280 (year 2010),  Truck Traffic: 4%,  Features Intersected: US441,  Facility Carried by Structure: US441,SR24
Minimum Vertical Clearance: 5.61m (18.41ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 2375053,  Location: 4,0 MI S OF EATONTON (Lat: 33.274361,  Lng: -83.366725),  Route carried "under" structure: County highway 66,  Structure Length: 0. m,  Average Daily Traffic: 1,280 (year 2010),  Truck Traffic: 8%,  Features Intersected: US441,  Facility Carried by Structure: US441,SR24
Minimum Vertical Clearance: 5.76m (18.90ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Length of Maximum Span: 0.0m