Bridge Statistics for DuPont, Washington (WA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 19Number of bridges
  • 361ft / 110mTotal length
  • $74,616,000Total costs
  • 915,043Total average daily traffic
  • 97,254Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for DuPont
  • No street view available for this location

New bridges in DuPont, WA - historical statistics
  • New bridges - historical statistics
  • 31930-1939
  • 11950-1959
  • 71960-1969
  • 11980-1989
  • 61990-1999
  • 12010-2019
Reconstructed bridges in DuPont, WA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 11970-1979
Average Bridge Daily Traffic in DuPont, WA
Average Bridge Truck Traffic in DuPont, WA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 63.6%Good
  • 36.4%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 9.1%Very good
  • 54.5%Good
  • 27.3%Satisfactory
  • 9.1%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 90.9%Good
  • 9.1%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 50.0%Very good
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: 2069A,  Location: 2.9 N JCT SR 510 (Lat: 47.071286,  Lng: -122.704864),  Route carried "on" structure: Interstate 5,  Year Built: 1937,  Year Reconstructed: 1982,  Status: Open,  Structure Length: 13.62m (44.69ft),  Average Daily Traffic: 62,281 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 90,182 (year 2039),  Design Load: H 15,  Features Intersected: NISQUALLY RIVER
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 184.881,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Navigation Control: Yes ( Vertical Clearance: 3.4m (11.2ft), Horizontal Clearance: 96.3m (315.9ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 98.5m (323.2ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.62m (44.69ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Critical Feature Inspection Date: April 2021,  Bridge Improvement Cost: $4,828,000,  Roadway Improvement Cost: $966,000,  Total Project Cost: $9,655,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 5284A,  Location: 3.7 N THURSTON CO (Lat: 47.089678,  Lng: -122.637067),  Route carried "on" structure: Interstate 5,  Year Built: 1957,  Year Reconstructed: 1969,  Status: Open,  Structure Length: 5.94m (19.49ft),  Average Daily Traffic: 125,988 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 182,430 (year 2039),  Design Load: HS 20,  Features Intersected: RAILROAD - LAUNDRY SPUR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 190.434,  Lanes on structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 44.8m (147.0ft),  Skew: 34 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 44.8m (147.0ft),  Out-to-Out Width: 46.6m (152.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 21.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 16.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.94m (19.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $5,811,000,  Roadway Improvement Cost: $1,162,000,  Total Project Cost: $11,622,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 6274A,  Location: 2.0 N THURSTON CO (Lat: 47.083194,  Lng: -122.670250),  Route carried "on" structure: County highway 5,  Year Built: 1960,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 9,550 (year 2002),  Truck Traffic: 1%,  Average Future Daily Traffic: 13,122 (year 2036),  Design Load: HS 20,  Features Intersected: BNRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.476,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 70.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $174,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $347,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 8116A,  Location: 2.9 N JCT SR 510 (Lat: 47.071542,  Lng: -122.704944),  Route carried "on" structure: Interstate 5,  Year Built: 1967,  Status: Open,  Structure Length: 13.14m (43.11ft),  Average Daily Traffic: 62,281 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 90,182 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: NISQUALLY RIVER
Minimum Vertical Clearance: 5.61m (18.41ft),  Kilometerpoint: 184.881,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 98.1m (321.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 16.0m (52.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.14m (43.11ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Critical Feature Inspection Date: April 2021,  Bridge Improvement Cost: $5,000,000,  Roadway Improvement Cost: $1,000,000,  Total Project Cost: $9,999,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 8134A,  Location: 0.6 N THURSTON CO (Lat: 47.075639,  Lng: -122.696556),  Route carried "on" structure: Interstate 5,  Year Built: 1968,  Status: Open,  Structure Length: 12.19m (39.99ft),  Average Daily Traffic: 62,281 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 90,182 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: NISQUALLY OVERFLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 185.670,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.7m (51.5ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.19m (39.99ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2018,  Bridge Improvement Cost: $4,160,000,  Roadway Improvement Cost: $832,000,  Total Project Cost: $8,320,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 8134D,  Location: 2.0 N THURSTON CO (Lat: 47.082806,  Lng: -122.670139),  Route carried "on" structure: County highway ,  Year Built: 1967,  Status: Open,  Structure Length: 4.21m (13.81ft),  Average Daily Traffic: 5,686 (year 2016),  Truck Traffic: 2%,  Average Future Daily Traffic: 9,256 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: I-5,  Facility Carried by Structure: OLD NISQUALLY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 21.0m (68.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.1m (36.4ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.21m (13.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,104,000,  Roadway Improvement Cost: $221,000,  Total Project Cost: $2,208,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 12137B,  Location: 0.6 N THURSTON CO (Lat: 47.075111,  Lng: -122.694972),  Route carried "on" structure: Interstate 5,  Year Built: 1983,  Status: Open,  Structure Length: 12.19m (39.99ft),  Average Daily Traffic: 62,281 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 90,182 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: NISQUALLY OVERFLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 185.750,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 41.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.19m (39.99ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2018,  Bridge Improvement Cost: $4,320,000,  Roadway Improvement Cost: $864,000,  Total Project Cost: $8,640,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 14963A,  Location: 2.5 N THURSTON CO (Lat: 47.087647,  Lng: -122.644583),  Route carried "on" structure: County highway 5,  Year Built: 1997,  Status: Open,  Structure Length: 11.09m (36.38ft),  Average Daily Traffic: 16,910 (year 2013),  Truck Traffic: 2%,  Average Future Daily Traffic: 30,386 (year 2035),  Design Load: HS 25 or greater,  Features Intersected: I-5,  Facility Carried by Structure: CENTER DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.113,  Lanes on structure: 3,  Lanes under structure: 9,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.4m (66.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 30.8m (101.0ft),  Curb-To-Curb Width: 20.4m (66.9ft),  Out-to-Out Width: 21.4m (70.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.09m (36.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $5,023,000,  Roadway Improvement Cost: $1,005,000,  Total Project Cost: $10,046,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 14963B,  Location: 3.1 N THURSTON CO (Lat: 47.087578,  Lng: -122.647992),  Route carried "on" structure: Ramp Interstate 5,  Year Built: 1997,  Status: Open,  Structure Length: 18.11m (59.42ft),  Average Daily Traffic: 4,429 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 6,413 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: BN RR,  Facility Carried by Structure: S-S RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.209,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 37.5m (123.0ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 23.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 17.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 18.11m (59.42ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $3,445,000,  Roadway Improvement Cost: $689,000,  Total Project Cost: $6,890,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 14963C,  Location: 3.5 N THURSTON CO (Lat: 47.089194,  Lng: -122.640639),  Route carried "on" structure: Ramp Interstate 5,  Year Built: 1997,  Status: Open,  Structure Length: 15.61m (51.21ft),  Average Daily Traffic: 4,431 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 6,416 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: BN RR,  Facility Carried by Structure: S-N RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.354,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 37.5m (123.0ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 15.61m (51.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $2,970,000,  Roadway Improvement Cost: $594,000,  Total Project Cost: $5,939,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 14963D,  Location: 3.3 N THURSTON CO (Lat: 47.085725,  Lng: -122.643717),  Route carried "on" structure: ServiceOther road 5,  Year Built: 1997,  Status: Open,  Structure Length: 3.02m (9.91ft),  Average Daily Traffic: 125 (year 2002),  Truck Traffic: 5%,  Average Future Daily Traffic: 172 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: TRUCK RAMP,  Facility Carried by Structure: CENTER DR-FT LEWIS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 1,  Lanes under structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.02m (9.91ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $475,000,  Roadway Improvement Cost: $95,000,  Total Project Cost: $950,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2082A,  Location: 1.7 N THURSTON CO (Lat: 47.082000,  Lng: -122.675778),  Route carried "under" structure: Interstate 5,  Year Built: 1936,  Structure Length: 0. m,  Average Daily Traffic: 61,806 (year 2019),  Truck Traffic: 11%,  Features Intersected: I-5,  Facility Carried by Structure: BNRR FT LEWIS SPUR
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 187.376,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 27.7m (90.9ft)

Find on map >>   Show street view

Structure Number: 2108A,  Location: 0.9 N THURSTON CO (Lat: 47.076667,  Lng: -122.690917),  Route carried "under" structure: Interstate 5,  Year Built: 1936,  Structure Length: 0. m,  Average Daily Traffic: 62,281 (year 2019),  Truck Traffic: 11%,  Features Intersected: I-5,  Facility Carried by Structure: BNRR PT DEFIANCE
Minimum Vertical Clearance: 7.01m (23.00ft),  Kilometerpoint: 186.088,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 10.4m (34.1ft)

Find on map >>   Show street view

Structure Number: 8134B,  Location: 0.9 N THURSTON CO (Lat: 47.078333,  Lng: -122.690000),  Route carried "under" structure: Interstate 5,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 62,281 (year 2019),  Truck Traffic: 11%,  Features Intersected: I-5,  Facility Carried by Structure: BNRR PT DEFIANCE
Minimum Vertical Clearance: 5.72m (18.77ft),  Kilometerpoint: 186.169,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 22.3m (73.2ft)

Find on map >>   Show street view

Structure Number: 8134C,  Location: 1.7 N THURSTON CO (Lat: 47.081083,  Lng: -122.676611),  Route carried "under" structure: Interstate 5,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 62,281 (year 2019),  Truck Traffic: 11%,  Features Intersected: I-5,  Facility Carried by Structure: BNRR FT LEWIS SPUR
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 187.295,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 11.0m (36.1ft)

Find on map >>   Show street view

Structure Number: 8134D,  Location: 2.0 N THURSTON CO (Lat: 47.082806,  Lng: -122.670139),  Route carried "under" structure: Interstate 5,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 123,611 (year 2019),  Truck Traffic: 11%,  Features Intersected: I-5,  Facility Carried by Structure: OLD NISQUALLY RD
Minimum Vertical Clearance: 6.35m (20.83ft),  Kilometerpoint: 187.810,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.0m (68.9ft)

Find on map >>   Show street view

Structure Number: 14963A,  Location: 2.5 N THURSTON CO (Lat: 47.087647,  Lng: -122.644583),  Route carried "under" structure: Interstate 5,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 125,988 (year 2019),  Truck Traffic: 11%,  Features Intersected: I-5,  Facility Carried by Structure: CENTER DRIVE
Minimum Vertical Clearance: 6.65m (21.82ft),  Kilometerpoint: 189.838,  Lanes on structure: 3,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 14963D,  Location: 2.8 N THURSTON CO (Lat: 47.085725,  Lng: -122.643717),  Route carried "under" structure: Ramp Interstate 5,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 502 (year 2015),  Truck Traffic: 84%,  Features Intersected: TRUCK RAMP,  Facility Carried by Structure: CENTER DR-FT LEWIS
Minimum Vertical Clearance: 5.61m (18.41ft),  Kilometerpoint: 1.159,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.0m (91.9ft)

Find on map >>   Show street view

Structure Number: 8906,  Location: 1.3 NORTH & WEST JCT. SR5 (Lat: 47.082900,  Lng: -122.690336),  Route carried "under" structure: ServiceCounty highway 10060,  Year Built: 2018,  Structure Length: 0. m,  Average Daily Traffic: 50 (year 2021),  Truck Traffic: 1%,  Features Intersected: MOUNTS RD SW,  Facility Carried by Structure: BNSF RAILROAD
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 0.001,  Lanes under structure: 1,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 5.8m (19.0ft)