Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Dock Junction, Georgia (GA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 30Number of bridges
  • 1,148ft / 350mTotal length
  • $83,605,000Total costs
  • 699,080Total average daily traffic
  • 34,112Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Dock Junction
  • No street view available for this location

New bridges in Dock Junction, GA - historical statistics
  • New bridges - historical statistics
  • 21960-1969
  • 151970-1979
  • 21980-1989
  • 11990-1999
  • 12010-2019
Reconstructed bridges in Dock Junction, GA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21980-1989
  • 11990-1999
  • 32000-2009
  • 22010-2019
Average Bridge Daily Traffic in Dock Junction, GA
Average Bridge Truck Traffic in Dock Junction, GA
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 36.8%Very good
  • 57.9%Good
  • 5.3%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.3%Very good
  • 68.4%Good
  • 15.8%Satisfactory
  • 10.5%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 66.7%Very good
  • 33.3%Good
Find on map >>   Show street view

Structure Number: 1270012,  Location: 1 MI NE OF BRUNSWICK (Lat: 31.228725,  Lng: -81.497286),  Route carried "on" structure: Spur State highway 25,  Year Built: 1976,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 19,560 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 29,340 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: ALTAMAHA CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $223,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $335,000
Find on map >>   Show street view

Structure Number: 1270013,  Location: 5 MI N OF BRUNSWICK (Lat: 31.241578,  Lng: -81.502869),  Route carried "on" structure: Spur State highway 25,  Year Built: 1971,  Status: Open,  Structure Length: 9.33m (30.61ft),  Average Daily Traffic: 23,460 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 35,190 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: I-95 (SR 405)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 13 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 32.6m (107.0ft),  Curb-To-Curb Width: 12.6m (41.3ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,196,000,  Roadway Improvement Cost: $120,000,  Total Project Cost: $1,793,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1270014,  Location: 5 MI N OF BRUNSWICK (Lat: 31.241428,  Lng: -81.502994),  Route carried "on" structure: Spur State highway 25,  Year Built: 1971,  Status: Open,  Structure Length: 9.36m (30.71ft),  Average Daily Traffic: 23,460 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 35,190 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: I-95 (SR 405)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 13 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 32.6m (107.0ft),  Curb-To-Curb Width: 12.6m (41.3ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 21.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,200,000,  Roadway Improvement Cost: $120,000,  Total Project Cost: $1,799,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1270022,  Location: 3 MI S OF JCT SR 99 (Lat: 31.233822,  Lng: -81.535272),  Route carried "on" structure: US 25,  Year Built: 1982,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 18,570 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 27,855 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: BURNETT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.531,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.4m (66.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 25.0m (82.0ft),  Out-to-Out Width: 26.0m (85.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Very good,  Operating Rating: 82.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2020,  Underwater Inspection Date: May 2018,  Bridge Improvement Cost: $966,000,  Roadway Improvement Cost: $97,000,  Total Project Cost: $1,449,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1270023,  Location: 1 MI N SR 303 & SR 27 INT (Lat: 31.215011,  Lng: -81.516742),  Route carried "on" structure: US 25,  Year Built: 1973,  Year Reconstructed: 1985,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 23,900 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 35,850 (year 2031),  Design Load: HS 20,  Features Intersected: YELLOW BLUFF CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.750,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 20.1m (65.9ft),  Out-to-Out Width: 24.4m (80.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Very good,  Operating Rating: 36.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2020,  Underwater Inspection Date: May 2018,  Bridge Improvement Cost: $1,208,000,  Roadway Improvement Cost: $121,000,  Total Project Cost: $1,812,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1270024,  Location: .5 MI N OF BRUNSWICK (Lat: 31.187331,  Lng: -81.503628),  Route carried "on" structure: US 25,  Year Built: 1975,  Status: Open,  Structure Length: 11.19m (36.71ft),  Average Daily Traffic: 23,470 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 35,205 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: CR 13111 BLISS ST - CSX
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.968,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 36.6m (120.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 22.2m (72.8ft),  Out-to-Out Width: 25.4m (83.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 48.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,216,000,  Roadway Improvement Cost: $222,000,  Total Project Cost: $3,324,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1270025,  Location: .5 MI N OF BRUNSWICK (Lat: 31.183228,  Lng: -81.503958),  Route carried "on" structure: City street 623,  Year Built: 1975,  Status: Open,  Structure Length: 7.77m (25.49ft),  Average Daily Traffic: 3,750 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,625 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: SR 27 (US 25-US 341),  Facility Carried by Structure: CR 592 NORWICH STR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.8m (78.1ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 33.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $725,000,  Roadway Improvement Cost: $72,000,  Total Project Cost: $1,087,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1270026,  Location: .75 MI N OF SR 303 (Lat: 31.184939,  Lng: -81.543108),  Route carried "on" structure: County highway 27,  Year Built: 1976,  Status: Open,  Structure Length: 9.91m (32.51ft),  Average Daily Traffic: 420 (year 2011),  Truck Traffic: 8%,  Average Future Daily Traffic: 630 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: I-95 (SR 405)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 33.8m (110.9ft),  Curb-To-Curb Width: 12.9m (42.3ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 48.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,270,000,  Roadway Improvement Cost: $127,000,  Total Project Cost: $1,905,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1270042,  Location: 4.4 MI N OF JCT SR 520 (Lat: 31.188358,  Lng: -81.530628),  Route carried "on" structure: State highway 303,  Year Built: 1964,  Status: Open,  Structure Length: 90.46m (296.78ft),  Average Daily Traffic: 10,430 (year 2011),  Truck Traffic: 7%,  Average Future Daily Traffic: 15,645 (year 2031),  Design Load: HS 20,  Features Intersected: TURTLE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Navigation Control: Yes ( Vertical Clearance: 10.6m (34.8ft), Horizontal Clearance: 24.3m (79.7ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 49,  Length of Maximum Span: 46.9m (153.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 49.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 130.70m (428.81ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: January 2021,  Underwater Inspection Date: June 2018,  Bridge Improvement Cost: $11,597,000,  Roadway Improvement Cost: $1,160,000,  Total Project Cost: $17,395,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1270051,  Location: 2 MI S INT I-95 & SR 27 (Lat: 31.192378,  Lng: -81.539989),  Route carried "on" structure: Interstate 95,  Year Built: 1977,  Year Reconstructed: 2005,  Status: Open,  Structure Length: 105.10m (344.82ft),  Average Daily Traffic: 46,410 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 69,615 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: TURTLE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 53.108,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 20 degrees,  Navigation Control: Yes ( Vertical Clearance: 10.6m (34.8ft), Horizontal Clearance: 24.3m (79.7ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 40,  Length of Maximum Span: 61.0m (200.1ft),  Curb-To-Curb Width: 43.3m (142.1ft),  Out-to-Out Width: 46.9m (153.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2020,  Underwater Inspection Date: June 2018,  Bridge Improvement Cost: $13,472,000,  Roadway Improvement Cost: $1,347,000,  Total Project Cost: $20,208,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1270053,  Location: 3 MI N I-95 & SR 303 INT (Lat: 31.208250,  Lng: -81.533683),  Route carried "on" structure: Interstate 95,  Year Built: 1976,  Status: Open,  Structure Length: 25.12m (82.41ft),  Average Daily Traffic: 46,410 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 69,615 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: GIBSON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 56.327,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 13,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 23.2m (76.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: January 2021,  Underwater Inspection Date: June 2018,  Bridge Improvement Cost: $4,098,000,  Roadway Improvement Cost: $410,000,  Total Project Cost: $6,146,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1270054,  Location: 3 MI N I-95 & SR 303 INT (Lat: 31.208294,  Lng: -81.533992),  Route carried "on" structure: Interstate 95,  Year Built: 1976,  Status: Open,  Structure Length: 25.12m (82.41ft),  Average Daily Traffic: 46,410 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 69,615 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: GIBSON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 56.327,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 13,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 23.2m (76.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: January 2021,  Underwater Inspection Date: June 2018,  Bridge Improvement Cost: $4,098,000,  Roadway Improvement Cost: $410,000,  Total Project Cost: $6,146,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1270055,  Location: 2 MI W JCT SR 27 & SR 303 (Lat: 31.220867,  Lng: -81.522392),  Route carried "on" structure: Interstate 95,  Year Built: 1971,  Year Reconstructed: 2009,  Status: Open,  Structure Length: 5.64m (18.50ft),  Average Daily Traffic: 46,410 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 69,615 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: SR 27 (US 25-US 341)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 57.936,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 11 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 26.8m (87.9ft),  Out-to-Out Width: 27.8m (91.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 49.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $920,000,  Roadway Improvement Cost: $92,000,  Total Project Cost: $1,380,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1270056,  Location: 2 MI W JCT SR 27 & SR 303 (Lat: 31.221108,  Lng: -81.522628),  Route carried "on" structure: Interstate 95,  Year Built: 1971,  Year Reconstructed: 2009,  Status: Open,  Structure Length: 5.64m (18.50ft),  Average Daily Traffic: 46,450 (year 2011),  Truck Traffic: 20%,  Average Future Daily Traffic: 69,675 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: SR 27 (US 25-US 341)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 57.936,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 11 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 26.8m (87.9ft),  Out-to-Out Width: 27.8m (91.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 49.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $920,000,  Roadway Improvement Cost: $92,000,  Total Project Cost: $1,380,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1270057,  Location: .5 MI N OF JCT SR 27 (Lat: 31.228067,  Lng: -81.515506),  Route carried "on" structure: Interstate 95,  Year Built: 1971,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 13.05m (42.81ft),  Average Daily Traffic: 46,450 (year 2011),  Truck Traffic: 20%,  Average Future Daily Traffic: 69,675 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: M-621- SOU RR- SCL RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 57.936,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.8m (81.4ft),  Skew: 19 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 24.2m (79.4ft),  Out-to-Out Width: 24.7m (81.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 31.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $1,672,000,  Roadway Improvement Cost: $167,000,  Total Project Cost: $2,508,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1270058,  Location: .5 MI N OF JCT SR 27 (Lat: 31.228228,  Lng: -81.515778),  Route carried "on" structure: Interstate 95,  Year Built: 1971,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 11.31m (37.11ft),  Average Daily Traffic: 46,450 (year 2011),  Truck Traffic: 20%,  Average Future Daily Traffic: 69,675 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: M-621- SOU RR- SCL RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 57.936,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.9m (78.4ft),  Skew: 19 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 21.9m (71.9ft),  Curb-To-Curb Width: 23.5m (77.1ft),  Out-to-Out Width: 23.9m (78.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $1,450,000,  Roadway Improvement Cost: $145,000,  Total Project Cost: $2,174,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1270068,  Location: 1.5 MI N OF SR 303 (Lat: 31.222367,  Lng: -81.504328),  Route carried "on" structure: City street 621,  Year Built: 1973,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 10,270 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 15,405 (year 2031),  Design Load: HS 20,  Features Intersected: YELLOW BLUFF CREEK,  Facility Carried by Structure: OLD JESUP ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $313,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $469,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1275002,  Location: 3 MI NW OF BRUNSWICK (Lat: 31.241969,  Lng: -81.535089),  Route carried "on" structure: County highway 78,  Year Built: 1965,  Year Reconstructed: 2001,  Status: Posted for load,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 3,990 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,985 (year 2031),  Design Load: H 15,  Features Intersected: BURNETT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 34.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 8.29m (27.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $246,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $369,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 1275004,  Location: 2 MI S INT SR 32 & SR 27 (Lat: 31.243728,  Lng: -81.572308),  Route carried "on" structure: County highway 59,  Year Built: 1989,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 1,920 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,880 (year 2031),  Design Load: HS 20,  Features Intersected: DILLARD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $234,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $352,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 1275019,  Location: 3.2 MI. N. OF SR 303 (Lat: 31.239169,  Lng: -81.533908),  Route carried "on" structure: City street 621,  Year Built: 1999,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 3,500 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,250 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: BURNETT CREEK,  Facility Carried by Structure: OLD JESUP ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $168,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $252,000
Find on map >>   Show street view

Structure Number: 1275025,  Location: 1MI E OF I-95, SP-25 INT (Lat: 31.247197,  Lng: -81.484700),  Route carried "on" structure: County highway 855,  Year Built: 2017,  Status: Open,  Structure Length: 2.59m (8.50ft),  Design Load: HS 20+Mod,  Features Intersected: ALTAMAHA CANAL,  Facility Carried by Structure: GLYNN CO PARKWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 24.1m (79.1ft),  Out-to-Out Width: 25.0m (82.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.11m (10.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $7,548,000,  Roadway Improvement Cost: $754,000,  Total Project Cost: $11,322,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1270013,  Location: 5 MI N OF BRUNSWICK (Lat: 31.241578,  Lng: -81.502869),  Route carried "under" structure: Interstate 95,  Structure Length: 0. m,  Average Daily Traffic: 45,650 (year 2009),  Truck Traffic: 1%,  Features Intersected: SR 25 SPUR NBL,  Facility Carried by Structure: SR 25 SPUR NBL
Minimum Vertical Clearance: 6.04m (19.82ft),  Kilometerpoint: 59.546,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1270014,  Location: 5 MI N OF BRUNSWICK (Lat: 31.241428,  Lng: -81.502994),  Route carried "under" structure: Interstate 95,  Structure Length: 0. m,  Average Daily Traffic: 45,650 (year 2009),  Truck Traffic: 1%,  Features Intersected: SR 25 SPUR SBL,  Facility Carried by Structure: SR 25 SPUR SBL
Minimum Vertical Clearance: 6.14m (20.14ft),  Kilometerpoint: 59.546,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1270024,  Location: .5 MI N OF BRUNSWICK (Lat: 31.187331,  Lng: -81.503628),  Route carried "under" structure: City street 13111,  Structure Length: 0. m,  Average Daily Traffic: 1,120 (year 1999),  Truck Traffic: 1%,  Features Intersected: SR 27 (US 25-US 341),  Facility Carried by Structure: US 25 / SR27
Minimum Vertical Clearance: 6.93m (22.74ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1270025,  Location: .5 MI N OF BRUNSWICK (Lat: 31.183228,  Lng: -81.503958),  Route carried "under" structure: US 25,  Structure Length: 0. m,  Average Daily Traffic: 17,260 (year 1999),  Truck Traffic: 1%,  Features Intersected: M-623 NORWICH STREET,  Facility Carried by Structure: CR 592 NORWICH STR
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 30.578,  Lanes on structure: 1,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1270026,  Location: .75 MI N OF SR 303 (Lat: 31.184939,  Lng: -81.543108),  Route carried "under" structure: Interstate 95,  Structure Length: 0. m,  Average Daily Traffic: 40,170 (year 2009),  Truck Traffic: 1%,  Features Intersected: CR 27 BLYTHE ISLAND RD,  Facility Carried by Structure: CR 27 BLYTHE ISLAN
Minimum Vertical Clearance: 5.96m (19.55ft),  Kilometerpoint: 53.108,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1270055,  Location: 2 MI W JCT SR 27 & SR 303 (Lat: 31.220867,  Lng: -81.522392),  Route carried "under" structure: US 25,  Structure Length: 0. m,  Average Daily Traffic: 21,560 (year 1999),  Truck Traffic: 1%,  Features Intersected: I-95 NBL (SR 405),  Facility Carried by Structure: I-95 NBL
Minimum Vertical Clearance: 5.35m (17.55ft),  Kilometerpoint: 25.750,  Lanes on structure: 3,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1270056,  Location: 2 MI W JCT SR 27 & SR 303 (Lat: 31.221108,  Lng: -81.522628),  Route carried "under" structure: US 25,  Structure Length: 0. m,  Average Daily Traffic: 21,560 (year 1999),  Truck Traffic: 1%,  Features Intersected: I-95 SBL (SR 405),  Facility Carried by Structure: I-95 SBL
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 25.750,  Lanes on structure: 3,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1270057,  Location: .5 MI N OF JCT SR 27 (Lat: 31.228067,  Lng: -81.515506),  Route carried "under" structure: City street 621,  Structure Length: 0. m,  Average Daily Traffic: 7,210 (year 1999),  Truck Traffic: 1%,  Features Intersected: I-95 NBL (SR 405),  Facility Carried by Structure: I-95 NBL
Minimum Vertical Clearance: 7.54m (24.74ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1270058,  Location: .5 MI N OF JCT SR 27 (Lat: 31.228228,  Lng: -81.515778),  Route carried "under" structure: City street 621,  Structure Length: 0. m,  Average Daily Traffic: 7,210 (year 1999),  Truck Traffic: 1%,  Features Intersected: I-95 SBL (SR 405),  Facility Carried by Structure: I-95 SBL
Minimum Vertical Clearance: 7.26m (23.82ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Discuss Dock Junction, Georgia (GA) on our hugely popular Georgia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.