Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Dana Point, California (CA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 27Number of bridges
  • 449ft / 137mTotal length
  • 1,527,100Total average daily traffic
  • 85,345Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Dana Point
  • No street view available for this location

New bridges in Dana Point, CA - historical statistics
  • New bridges - historical statistics
  • 21920-1929
  • 11950-1959
  • 101960-1969
  • 71970-1979
  • 41980-1989
  • 21990-1999
  • 12010-2019
Reconstructed bridges in Dana Point, CA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11940-1949
  • 01950-1959
  • 01960-1969
  • 01970-1979
  • 01980-1989
  • 11990-1999
  • 12000-2009
  • 12010-2019
Average Bridge Daily Traffic in Dana Point, CA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 58.8%Good
  • 35.3%Fair
  • 5.9%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 68.4%Good
  • 31.6%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 73.7%Good
  • 5.3%Satisfactory
  • 21.1%Fair
Find on map >>   Show street view

Structure Number: 55 0001,  Location: 12-ORA-001-21.55-HNTB (Lat: 33.630753,  Lng: -117.956544),  Route carried "on" structure: State highway 1,  Year Built: 1992,  Status: Open,  Structure Length: 17.16m (56.30ft),  Average Daily Traffic: 32,000 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 42,908 (year 2040),  Design Load: HS 20,  Features Intersected: SANTA ANA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.550,  Lanes on structure: 6,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 29.0m (95.1ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 36.6m (120.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 3.4m (11.2ft),  Curb-To-Curb Width: 29.0m (95.1ft),  Out-to-Out Width: 36.0m (118.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Very good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2021,  Underwater Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 55 001,  Location: 12-ORA-001-31.75-SLB (Lat: 33.731461,  Lng: -118.084558),  Route carried "on" structure: State highway 1,  Year Built: 1967,  Status: Open,  Structure Length: 10.76m (35.30ft),  Average Daily Traffic: 41,000 (year 2012),  Average Future Daily Traffic: 53,686 (year 2040),  Design Load: HS 20,  Features Intersected: ANAHEIM BAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.750,  Lanes on structure: 4,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Skew: 30 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 36.3m (119.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 20.1m (65.9ft),  Out-to-Out Width: 24.4m (80.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Very good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2021,  Underwater Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 55 0015Y,  Location: 12-ORA-001-R1.00-DAPT (Lat: 33.463686,  Lng: -117.682214),  Route carried "on" structure: Ramp State highway 1,  Year Built: 1927,  Year Reconstructed: 1947,  Status: Open,  Structure Length: 13.23m (43.41ft),  Average Daily Traffic: 8,000 (year 2012),  Truck Traffic: 6%,  Average Future Daily Traffic: 9,499 (year 2040),  Design Load: HS 20,  Features Intersected: SAN JUAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.000,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 16.4m (53.8ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 16.5m (54.1ft),  Curb or Sidewalk Widths: Left: 1.3m (4.3ft),  Right: 1.3m (4.3ft),  Curb-To-Curb Width: 16.4m (53.8ft),  Out-to-Out Width: 19.7m (64.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Very good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 55 0224,  Location: 12-ORA-005-5.80-DAPT (Lat: 33.458536,  Lng: -117.656067),  Route carried "on" structure: City street ,  Year Built: 1981,  Year Reconstructed: 2012,  Status: Open,  Structure Length: 6.74m (22.11ft),  Average Daily Traffic: 10,000 (year 2009),  Truck Traffic: 3%,  Average Future Daily Traffic: 12,319 (year 2043),  Design Load: HS 20+Mod,  Features Intersected: INTERSTATE 5,  Facility Carried by Structure: CAMINO DE ESTRELLA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 7,  Lanes under structure: 9,  Owner: State Highway Agency,  Approaching Roadway Width: 28.6m (93.8ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 36.9m (121.1ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 28.6m (93.8ft),  Out-to-Out Width: 33.5m (109.9ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 55 0225,  Location: 12-ORA-005-6.62-DAPT (Lat: 33.465364,  Lng: -117.667800),  Route carried "on" structure: County highway ,  Year Built: 1960,  Status: Open,  Structure Length: 13.44m (44.09ft),  Average Daily Traffic: 5,000 (year 2009),  Truck Traffic: 3%,  Average Future Daily Traffic: 5,918 (year 2037),  Design Load: HS 20,  Features Intersected: ROUTE 5,  Facility Carried by Structure: VIA CALIFORNIA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 14,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 29.6m (97.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2019,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 55 0226,  Location: 12-ORA-005-6.69 (Lat: 33.466342,  Lng: -117.668092),  Route carried "on" structure: Interstate 5,  Year Built: 1960,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 6.98m (22.90ft),  Average Daily Traffic: 234,300 (year 2015),  Truck Traffic: 4%,  Average Future Daily Traffic: 298,413 (year 2043),  Design Load: HS 20,  Features Intersected: N5-N1 CONNECTOR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.690,  Lanes on structure: 11,  Lanes under structure: 2,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 54.9m (180.1ft),  Skew: 39 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 54.9m (180.1ft),  Out-to-Out Width: 56.5m (185.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 55 023,  Location: 12-ORA-005-10.00-SJCP (Lat: 33.508278,  Lng: -117.660147),  Route carried "on" structure: Interstate 5,  Year Built: 1958,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 5.42m (17.78ft),  Average Daily Traffic: 316,000 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 343,915 (year 2043),  Design Load: HS 20,  Features Intersected: EL HORNO STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.000,  Lanes on structure: 12,  Lanes under structure: 2,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 59.0m (193.6ft),  Skew: 34 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.3m (83.0ft),  Curb-To-Curb Width: 59.0m (193.6ft),  Out-to-Out Width: 60.2m (197.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 55 0239,  Location: 12-ORA-001-R0.40-DAPT (Lat: 33.464208,  Lng: -117.672647),  Route carried "on" structure: State highway 1,  Year Built: 1960,  Status: Open,  Structure Length: 6.77m (22.21ft),  Average Daily Traffic: 37,000 (year 2012),  Truck Traffic: 6%,  Average Future Daily Traffic: 47,900 (year 2040),  Design Load: HS 20,  Features Intersected: CAMINO CAPISTRANO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.400,  Lanes on structure: 5,  Lanes under structure: 3,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 25.3m (83.0ft),  Skew: 29 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 29.6m (97.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 25.3m (83.0ft),  Out-to-Out Width: 30.7m (100.7ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 34.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 55 0511,  Location: 12-ORA-001-R0.20-DAPT (Lat: 33.466042,  Lng: -117.670658),  Route carried "on" structure: State highway 1,  Year Built: 1973,  Status: Open,  Structure Length: 9.36m (30.71ft),  Average Daily Traffic: 37,000 (year 2012),  Truck Traffic: 6%,  Average Future Daily Traffic: 47,900 (year 2040),  Design Load: HS 20,  Features Intersected: N5-N1 CONNECTOR RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.200,  Lanes on structure: 4,  Lanes under structure: 1,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 29.8m (97.8ft),  Skew: 29 degrees,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 93.6m (307.1ft),  Curb-To-Curb Width: 29.8m (97.8ft),  Out-to-Out Width: 29.8m (97.8ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 55 0545,  Location: 12-ORA-001-R0.78-DAPT (Lat: 33.464278,  Lng: -117.678842),  Route carried "on" structure: State highway 1,  Year Built: 1976,  Status: Open,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 37,000 (year 2012),  Truck Traffic: 6%,  Average Future Daily Traffic: 48,704 (year 2040),  Design Load: HS 20,  Features Intersected: DOHENY PARK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.780,  Lanes on structure: 6,  Lanes under structure: 4,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 28.8m (94.5ft),  Skew: 39 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 49.4m (162.1ft),  Curb-To-Curb Width: 28.8m (94.5ft),  Out-to-Out Width: 30.1m (98.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 55 0546,  Location: 12-ORA-001-R0.86-DAPT (Lat: 33.464539,  Lng: -117.680247),  Route carried "on" structure: State highway 1,  Year Built: 1976,  Status: Open,  Structure Length: 5.46m (17.91ft),  Average Daily Traffic: 37,000 (year 2012),  Truck Traffic: 6%,  Average Future Daily Traffic: 48,704 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: BNSF RY,AMTRAK,METROLINK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.860,  Lanes on structure: 4,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 28.3m (92.8ft),  Curb-To-Curb Width: 21.3m (69.9ft),  Out-to-Out Width: 22.6m (74.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 55 0546S,  Location: 12-ORA-001-R0.85-DAPT (Lat: 33.464664,  Lng: -117.680256),  Route carried "on" structure: Ramp State highway 1,  Year Built: 1976,  Status: Open,  Structure Length: 5.39m (17.68ft),  Average Daily Traffic: 3,000 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,563 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: BNSF RY,AMTRAK,METROLINK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.850,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 28.3m (92.8ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 55 0547,  Location: 12-ORA-001-R0.97-DAPT (Lat: 33.464489,  Lng: -117.681956),  Route carried "on" structure: State highway 1,  Year Built: 1976,  Status: Open,  Structure Length: 15.48m (50.79ft),  Average Daily Traffic: 37,000 (year 2012),  Truck Traffic: 6%,  Average Future Daily Traffic: 48,704 (year 2040),  Design Load: HS 20,  Features Intersected: SAN JUAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.970,  Lanes on structure: 4,  Base Highway Network: Yes (,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 29 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 40.8m (133.9ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 22.6m (74.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 55C0521,  Location: 0.1 MI W/O ROUTE 1 (Lat: 33.476778,  Lng: -117.719194),  Route carried "on" structure: City street ,  Year Built: 1974,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 5,300 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 6,306 (year 2038),  Design Load: HS 20,  Features Intersected: SALT CREEK BEACH PARK,  Facility Carried by Structure: RITZ CARLTON DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 83.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 55C0607,  Location: 0.4 MI. E/O DEL OBISPO ST (Lat: 33.474394,  Lng: -117.679767),  Route carried "on" structure: City street ,  Year Built: 1992,  Status: Open,  Structure Length: 7.96m (26.12ft),  Average Daily Traffic: 31,000 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 27,241 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: SAN JUAN CREEK CHANNEL,  Facility Carried by Structure: STONEHILL DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 37.8m (124.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 25.6m (84.0ft),  Out-to-Out Width: 29.3m (96.1ft)

Condition: Deck: Poor,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 55C069,  Location: 0.25 SOUTH SANTIAGO RD (Lat: 33.810294,  Lng: -117.782244),  Route carried "on" structure: City street ,  Year Built: 2012,  Status: Open,  Structure Length: 1.20m (3.94ft),  Average Daily Traffic: 1,100 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,033 (year 2037),  Design Load: HL 93,  Features Intersected: HANDY CREEK,  Facility Carried by Structure: ORANGE PARK BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 13.2m (43.3ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.7m (38.4ft),  Curb-To-Curb Width: 13.2m (43.3ft),  Out-to-Out Width: 17.8m (58.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2019,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 55C0697,  Location: .17 MI SE OF NIGUEL DR (Lat: 33.473847,  Lng: -117.715036),  Route carried "on" structure: City street ,  Year Built: 1969,  Status: Open,  Structure Length: 4.48m (14.70ft),  Average Daily Traffic: 5,000 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,918 (year 2038),  Design Load: HS 20,  Features Intersected: SR 1 PACIFIC COAST HWY,  Facility Carried by Structure: NIGUEL SHORES DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 21.9m (71.9ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 37.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 55C0698,  Location: .12 MI NW NIGUEL RD (Lat: 33.477475,  Lng: -117.717608),  Route carried "on" structure: City street ,  Year Built: 1969,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 40,000 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 45,037 (year 2038),  Design Load: H 15,  Features Intersected: PEDESTRIAN WALKWAY,  Facility Carried by Structure: PACIFIC COAST HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Base Highway Network: Yes (,  Subroute: 1),  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 23.8m (78.1ft),  Material/Design: Steel,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 23.8m (78.1ft),  Out-to-Out Width: 43.0m (141.1ft)

Condition: Superstructure: Fair,  Substructure: Good,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020
Find on map >>   Show street view

Structure Number: 55C0699,  Location: 0.09 MI SE OF PT MONARCH (Lat: 33.482447,  Lng: -117.721853),  Route carried "on" structure: City street ,  Year Built: 1983,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 40,000 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 45,037 (year 2038),  Features Intersected: PEDESTRIAN WALKWAY,  Facility Carried by Structure: PACIFIC COAST HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Base Highway Network: Yes (,  Subroute: 1),  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 24.7m (81.0ft),  Skew: 21 degrees,  Material/Design: Steel,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 24.7m (81.0ft),  Out-to-Out Width: 24.7m (81.0ft)

Condition: Superstructure: Fair,  Substructure: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020
Find on map >>   Show street view

Structure Number: 55 0007,  Location: 12-ORA-001-R0.80-DAPT (Lat: 33.463111,  Lng: -117.680056),  Route carried "under" structure: Ramp State highway 1,  Year Built: 1927,  Structure Length: 0. m,  Average Daily Traffic: 8,000 (year 2009),  Truck Traffic: 6%,  Features Intersected: S1-COAST HIGHWAY OFFRAMP,  Facility Carried by Structure: BNSF,AMTRAK,METRO
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 0.800,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 24.1m (79.1ft)

Find on map >>   Show street view

Structure Number: 55 0224,  Location: 12-ORA-005-5.80-DAPT (Lat: 33.458536,  Lng: -117.656067),  Route carried "under" structure: Interstate 5,  Year Built: 1981,  Structure Length: 0. m,  Average Daily Traffic: 205,600 (year 2019),  Truck Traffic: 8%,  Features Intersected: INTERSTATE 5,  Facility Carried by Structure: CAMINO DE ESTRELLA
Minimum Vertical Clearance: 5.02m (16.47ft),  Kilometerpoint: 5.800,  Lanes on structure: 7,  Lanes under structure: 9,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 36.9m (121.1ft)

Find on map >>   Show street view

Structure Number: 55 0225,  Location: 12-ORA-005-6.62-DAPT (Lat: 33.465364,  Lng: -117.667800),  Route carried "under" structure: Interstate 5,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 267,000 (year 2016),  Truck Traffic: 10%,  Features Intersected: ROUTE 5,  Facility Carried by Structure: VIA CALIFORNIA
Minimum Vertical Clearance: 9.14m (29.99ft),  Kilometerpoint: 6.620,  Lanes on structure: 2,  Lanes under structure: 14,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 29.6m (97.1ft)

Find on map >>   Show street view

Structure Number: 55 0226,  Location: 12-ORA-005-6.69 (Lat: 33.466342,  Lng: -117.668092),  Route carried "under" structure: Ramp Interstate 5,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 14,900 (year 2009),  Truck Traffic: 4%,  Features Intersected: N5-N1 CONNECTOR
Minimum Vertical Clearance: 4.92m (16.14ft),  Kilometerpoint: 6.690,  Lanes on structure: 11,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>   Show street view

Structure Number: 55 0239,  Location: 12-ORA-001-R0.40-DAPT (Lat: 33.464208,  Lng: -117.672647),  Route carried "under" structure: City street ,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2012),  Truck Traffic: 1%,  Features Intersected: CAMINO CAPISTRANO,  Facility Carried by Structure: STATE ROUTE 1
Minimum Vertical Clearance: 7.44m (24.41ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 3,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 29.6m (97.1ft)

Find on map >>   Show street view

Structure Number: 55 0511,  Location: 12-ORA-001-R0.20-DAPT (Lat: 33.466042,  Lng: -117.670658),  Route carried "under" structure: Ramp Interstate 5,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 14,900 (year 2012),  Truck Traffic: 6%,  Features Intersected: N5-N1 CONNECTOR RAMP,  Facility Carried by Structure: STATE ROUTE 1
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 6.690,  Lanes on structure: 4,  Lanes under structure: 1,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 93.6m (307.1ft)

Find on map >>   Show street view

Structure Number: 55C0555,  Location: 0.5 M S/O PARK LANTEM (Lat: 33.458289,  Lng: -117.672969),  Route carried "under" structure: City street ,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 19,000 (year 2017),  Truck Traffic: 1%,  Features Intersected: PACIFIC COAST HIGHWAY,  Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 5.99m (19.65ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.7m (90.9ft)

Find on map >>   Show street view

Structure Number: 55C0697,  Location: .17 MI SE OF NIGUEL DR (Lat: 33.473847,  Lng: -117.715036),  Route carried "under" structure: City street ,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 40,000 (year 2019),  Truck Traffic: 5%,  Features Intersected: SR 1 PACIFIC COAST HWY,  Facility Carried by Structure: NIGUEL SHORES DR
Minimum Vertical Clearance: 5.02m (16.47ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 21.9m (71.9ft)

Discuss Dana Point, California (CA) on our hugely popular California forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.