Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Cheat Lake, West Virginia (WV)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 39Number of bridges
  • 1,299ft / 396mTotal length
  • $6,175,000Total costs
  • 301,501Total average daily traffic
  • 44,217Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Cheat Lake
  • No street view available for this location

New bridges in Cheat Lake, WV - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 11950-1959
  • 191970-1979
  • 11990-1999
  • 22000-2009
  • 152010-2019
Average Bridge Daily Traffic in Cheat Lake, WV
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 4.8%Very good
  • 47.6%Good
  • 38.1%Satisfactory
  • 4.8%Fair
  • 4.8%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 8.7%Very good
  • 73.9%Good
  • 8.7%Satisfactory
  • 4.3%Fair
  • 4.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 69.6%Good
  • 13.0%Satisfactory
  • 8.7%Fair
  • 8.7%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 77.8%Very good
  • 22.2%Good
Find on map >>   Show street view

Structure Number: 31A124,  Location: 0.01 MI SOUTH MGL CO 857 (Lat: 39.670969,  Lng: -79.859061),  Route carried "on" structure: County highway 85717,  Year Built: 1973,  Status: Open,  Structure Length: 4.80m (15.75ft),  Average Daily Traffic: 2,000 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,100 (year 2041),  Design Load: HS 20,  Features Intersected: MGL CO RT 857/17,  Facility Carried by Structure: MGL CO RT 857/17
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 45.8m (150.3ft),  Curb-To-Curb Width: 9.9m (32.5ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Superstructure: Good,  Substructure: Good,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 31A126,  Location: 3.08 MI EAST CO RT 857 (Lat: 39.671500,  Lng: -79.851000),  Route carried "on" structure: Interstate 6800,  Year Built: 1973,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 9,000 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 12,870 (year 2041),  Design Load: HS 20,  Features Intersected: Mon Co 69/6,  Facility Carried by Structure: INTERSTATE 68 EB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.544,  Lanes on structure: 3,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 23.2m (76.1ft),  Curb-To-Curb Width: 14.2m (46.6ft),  Out-to-Out Width: 15.4m (50.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.49m (18.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $431,000,  Roadway Improvement Cost: $183,000,  Total Project Cost: $953,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 31A127,  Location: 3.08 MI EAST CO RT 857 (Lat: 39.671600,  Lng: -79.850900),  Route carried "on" structure: Interstate 6800,  Year Built: 1973,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 9,000 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 12,870 (year 2041),  Design Load: HS 20,  Features Intersected: Mon. Co. 69/6,  Facility Carried by Structure: INTERSTATE 68 WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.544,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 23.2m (76.1ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.49m (18.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $431,000,  Roadway Improvement Cost: $183,000,  Total Project Cost: $953,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 31A142,  Location: 1.44 MI WEST MON CO 857 (Lat: 39.627239,  Lng: -79.903461),  Route carried "on" structure: Interstate 6800,  Year Built: 1975,  Status: Open,  Structure Length: 4.43m (14.53ft),  Average Daily Traffic: 19,350 (year 2018),  Truck Traffic: 18%,  Average Future Daily Traffic: 26,325 (year 2038),  Design Load: HS 20,  Features Intersected: Mgl Co Rt 68/7,  Facility Carried by Structure: INTERSTATE 68 EB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.270,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.39m (14.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $281,000,  Roadway Improvement Cost: $92,000,  Total Project Cost: $428,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 31A143,  Location: 0.02 MI NORTH CO RT 857 (Lat: 39.653681,  Lng: -79.889281),  Route carried "on" structure: County highway 6700,  Year Built: 1976,  Status: Open,  Structure Length: 6.90m (22.64ft),  Average Daily Traffic: 4,400 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,975 (year 2038),  Design Load: HS 20,  Features Intersected: I-68 (X),  Facility Carried by Structure: MON CO Rt. 67
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.152,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 33.7m (110.6ft),  Curb-To-Curb Width: 9.9m (32.5ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 31A147,  Location: 0.05 MI SOUTH CO RT 71/1 (Lat: 39.705069,  Lng: -79.830831),  Route carried "on" structure: County highway 7100,  Year Built: 1950,  Status: Posted for load,  Structure Length: 0.75m (2.46ft),  Average Daily Traffic: 250 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 350 (year 2038),  Features Intersected: MORGAN RUN,  Facility Carried by Structure: MONONGALIA CR 71
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.465,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 3.5m (11.5ft),  Curb-To-Curb Width: 3.6m (11.8ft),  Out-to-Out Width: 3.6m (11.8ft)

Condition: Deck: Good,  Superstructure: Poor,  Substructure: Poor,  Channel: Good,  Operating Rating: 31.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $171,000,  Roadway Improvement Cost: $132,000,  Total Project Cost: $364,000 ( Estimate for 2020),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 31A148,  Location: 0.88 MI WEST CO RT 69/6 (Lat: 39.669311,  Lng: -79.863700),  Route carried "on" structure: Interstate 6800,  Year Built: 1976,  Status: Open,  Structure Length: 59.92m (196.59ft),  Average Daily Traffic: 33,946 (year 2020),  Truck Traffic: 18%,  Average Future Daily Traffic: 45,500 (year 2040),  Design Load: HS 20,  Features Intersected: Cheat Lake & Mon Co 857,  Facility Carried by Structure: INTERSTATE 68
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.128,  Lanes on structure: 4,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.9m (85.0ft),  Skew: 30 degrees,  Material/Design: Steel continuous,  Design/Construction: Truss - Deck,  Number Of Spans In Main Unit: 5,  Number Of Approach Spans: 2,  Length of Maximum Span: 110.9m (363.8ft),  Curb-To-Curb Width: 24.8m (81.4ft),  Out-to-Out Width: 26.6m (87.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 59.92m (196.59ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Critical Feature Inspection Date: September 2021,  Underwater Inspection Date: September 2019,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $1,664,000,  Roadway Improvement Cost: $117,000,  Total Project Cost: $2,148,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 31A206,  Location: 0.36 MI SOUTH CO RT 67 (Lat: 39.646600,  Lng: -79.894600),  Route carried "on" structure: County highway 85700,  Year Built: 1973,  Status: Open,  Structure Length: 6.43m (21.10ft),  Average Daily Traffic: 27,300 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 42,320 (year 2041),  Design Load: HL 93,  Features Intersected: I-68 (X),  Facility Carried by Structure: MONONGALIA CR 857
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.684,  Lanes on structure: 6,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 31.6m (103.7ft),  Curb-To-Curb Width: 27.4m (89.9ft),  Out-to-Out Width: 28.2m (92.5ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.71m (22.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 31A208,  Location: 0.02 MI SOUTH CO RT 69/2 (Lat: 39.697081,  Lng: -79.816719),  Route carried "on" structure: County highway 85700,  Year Built: 1936,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 2,000 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,100 (year 2041),  Features Intersected: DARNELL RUN,  Facility Carried by Structure: MON CO RT 857
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 10.3m (33.8ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: High priority of replacement,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $324,000,  Roadway Improvement Cost: $163,000,  Total Project Cost: $522,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 31A27,  Location: 0.02 MI NORTH CO RT 75/1 (Lat: 39.658681,  Lng: -79.863981),  Route carried "on" structure: County highway 7500,  Year Built: 1996,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 3,300 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,100 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: WHITES RUN,  Facility Carried by Structure: MON. CO. Rt. 75
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.840,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.07m (3.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $211,000,  Roadway Improvement Cost: $89,000,  Total Project Cost: $348,000 ( Estimate for 2021),  Deck Structure Type: Other,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31A312,  Location: 0.21 mi. N. of I 68 (Lat: 39.675800,  Lng: -79.848581),  Route carried "on" structure: State highway 43,  Year Built: 2010,  Status: Open,  Structure Length: 8.96m (29.40ft),  Average Daily Traffic: 900 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,160 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: Mon. Co. Rt. 857
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.338,  Lanes on structure: 3,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 37.5m (123.0ft),  Curb-To-Curb Width: 14.7m (48.2ft),  Out-to-Out Width: 15.5m (50.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31A313,  Location: 0.21 mi. N. I 68 (Lat: 39.675739,  Lng: -79.848939),  Route carried "on" structure: State highway 43,  Year Built: 2010,  Status: Open,  Structure Length: 8.96m (29.40ft),  Average Daily Traffic: 900 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,160 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: Mon. Co. Rt. 857
Minimum Vertical Clearance: 7.67m (25.16ft),  Kilometerpoint: 0.338,  Lanes on structure: 2,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 37.5m (123.0ft),  Curb-To-Curb Width: 13.5m (44.3ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31A314,  Location: 0.4 mi. N of MON CO 857 (Lat: 39.680500,  Lng: -79.847600),  Route carried "on" structure: State highway 43,  Year Built: 2010,  Status: Open,  Structure Length: 9.60m (31.50ft),  Average Daily Traffic: 900 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,160 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: Mon Co Rt 88/1 (SLS)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.901,  Lanes on structure: 4,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Skew: 13 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 42.8m (140.4ft),  Curb-To-Curb Width: 20.6m (67.6ft),  Out-to-Out Width: 21.3m (69.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31A315,  Location: 0.6 mi. N of MON CO 857 (Lat: 39.680900,  Lng: -79.848000),  Route carried "on" structure: State highway 43,  Year Built: 2011,  Status: Open,  Structure Length: 9.60m (31.50ft),  Average Daily Traffic: 900 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,160 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: MON CO RT 88/1 (SLS)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.901,  Lanes on structure: 3,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 42.8m (140.4ft),  Curb-To-Curb Width: 18.2m (59.7ft),  Out-to-Out Width: 19.0m (62.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31A316,  Location: 1.0 MILES N OF MON CO 857 (Lat: 39.687489,  Lng: -79.845381),  Route carried "on" structure: State highway 4300,  Year Built: 2010,  Status: Open,  Structure Length: 44.01m (144.39ft),  Average Daily Traffic: 900 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,160 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: Mon. Co. 69/17,  Facility Carried by Structure: WV Rt. 43
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.754,  Lanes on structure: 3,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.4m (50.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31A317,  Location: 1.0 MILES N OF MON CO 857 (Lat: 39.687669,  Lng: -79.845600),  Route carried "on" structure: State highway 4300,  Year Built: 2010,  Status: Open,  Structure Length: 4.40m (14.44ft),  Average Daily Traffic: 900 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,160 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: MON. CO. 69/17,  Facility Carried by Structure: WV Rt. 43
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.754,  Lanes on structure: 3,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 14.9m (48.9ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 19.4m (63.6ft),  Out-to-Out Width: 20.2m (66.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31A318,  Location: 2.48 mi. N. of I68 (Lat: 39.701919,  Lng: -79.829050),  Route carried "on" structure: State highway 43,  Year Built: 2008,  Status: Open,  Structure Length: 42.20m (138.45ft),  Average Daily Traffic: 900 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 900 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: Mon Co 71, Morgan Run
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.991,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 4,  Length of Maximum Span: 76.0m (249.3ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31A319,  Location: 2.48 mi. N. of I68 (Lat: 39.702200,  Lng: -79.829100),  Route carried "on" structure: State highway 43,  Year Built: 2008,  Status: Open,  Structure Length: 42.20m (138.45ft),  Average Daily Traffic: 900 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 900 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: Mon Co 71 & Morgan Run
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.991,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 5,  Length of Maximum Span: 80.0m (262.5ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31A32,  Location: 0.2 miles S of PA line (Lat: 39.718831,  Lng: -79.822419),  Route carried "on" structure: State highway 43,  Year Built: 2011,  Status: Open,  Structure Length: 44.00m (144.36ft),  Average Daily Traffic: 900 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 900 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: Rubles Run
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.697,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 4,  Length of Maximum Span: 84.0m (275.6ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31A321,  Location: 1.7mi s of penn.st. 3002 (Lat: 39.719011,  Lng: -79.822669),  Route carried "on" structure: State highway 43,  Year Built: 2011,  Status: Open,  Structure Length: 41.85m (137.30ft),  Average Daily Traffic: 900 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 900 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: Rubles Run
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.697,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 4,  Length of Maximum Span: 77.5m (254.3ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31A324,  Location: 0.20 mi. S. of Co. 69/8 (Lat: 39.667300,  Lng: -79.860600),  Route carried "on" structure: County highway 857,  Year Built: 2012,  Status: Open,  Structure Length: 29.50m (96.78ft),  Average Daily Traffic: 5,300 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 7,200 (year 2038),  Design Load: HL 93,  Features Intersected: CHEAT LAKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.415,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 9 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 79.2m (259.8ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 0.0m,  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 57.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: December 2020,  Underwater Inspection Date: September 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 39A1,  Location: 0.05 MI SOUTH CO RT 73/73 (Lat: 39.658489,  Lng: -79.780669),  Route carried "on" structure: County highway 7312,  Year Built: 1972,  Status: Open,  Structure Length: 7.07m (23.20ft),  Average Daily Traffic: 400 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 560 (year 2041),  Design Load: HS 20,  Features Intersected: I-68,  Facility Carried by Structure: PRESTON CO 73/12
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 22.8m (74.8ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Poor,  Superstructure: Good,  Substructure: Poor,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.01m (23.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $332,000,  Roadway Improvement Cost: $101,000,  Total Project Cost: $459,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 39A151,  Location: 0.15 MI SOUTH CO RT 73/73 (Lat: 39.655711,  Lng: -79.762939),  Route carried "on" structure: County highway 7302,  Year Built: 1972,  Status: Open,  Structure Length: 7.93m (26.02ft),  Average Daily Traffic: 200 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 280 (year 2041),  Design Load: HS 20,  Features Intersected: PRESTON CO RT 73/2,  Facility Carried by Structure: PRESTON CO RT 73/2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.150,  Lanes on structure: 2,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 24.5m (80.4ft),  Curb-To-Curb Width: 9.9m (32.5ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 31A124,  Location: 0.01 MI SOUTH MGL CO 857 (Lat: 39.670969,  Lng: -79.859061),  Route carried "under" structure: Interstate 6800,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 27,450 (year 0017),  Truck Traffic: 18%,  Features Intersected: MGL CO RT 857/17,  Facility Carried by Structure: MGL CO RT 857/17
Minimum Vertical Clearance: 5.72m (18.77ft),  Kilometerpoint: 15.820,  Lanes on structure: 2,  Lanes under structure: 4,  Length of Maximum Span: 45.8m (150.3ft)

Find on map >>   Show street view

Structure Number: 31A125,  Location: 0.37 MI WEST CO RT 69/6 (Lat: 39.671361,  Lng: -79.857769),  Route carried "under" structure: Interstate 6800,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 30,800 (year 2019),  Truck Traffic: 16%,  Features Intersected: I-68,  Facility Carried by Structure: GOLF CART ROADWAY
Minimum Vertical Clearance: 6.40m (21.00ft),  Kilometerpoint: 15.949,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 27.0m (88.6ft)

Find on map >>   Show street view

Structure Number: 31A126,  Location: 3.08 MI EAST CO RT 857 (Lat: 39.671500,  Lng: -79.850950),  Route carried "under" structure: County highway 696,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 1,200 (year 0018),  Truck Traffic: 6%,  Features Intersected: Mon Co 69/6,  Facility Carried by Structure: INTERSTATE 68 EB
Minimum Vertical Clearance: 5.59m (18.34ft),  Kilometerpoint: 0.402,  Lanes on structure: 3,  Lanes under structure: 3,  Length of Maximum Span: 23.2m (76.1ft)

Find on map >>   Show street view

Structure Number: 31A127,  Location: 3.08 MI EAST CO RT 857 (Lat: 39.671681,  Lng: -79.850811),  Route carried "under" structure: County highway 6906,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 1,200 (year 0018),  Truck Traffic: 6%,  Features Intersected: Mon. Co. 69/6,  Facility Carried by Structure: INTERSTATE 68 WB
Minimum Vertical Clearance: 6.63m (21.75ft),  Kilometerpoint: 0.402,  Lanes on structure: 2,  Lanes under structure: 3,  Length of Maximum Span: 23.2m (76.1ft)

Find on map >>   Show street view

Structure Number: 31A143,  Location: 0.02 MI NORTH CO RT 857 (Lat: 39.653681,  Lng: -79.889281),  Route carried "under" structure: Interstate 6800,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 34,200 (year 0018),  Truck Traffic: 18%,  Features Intersected: I-68 (X),  Facility Carried by Structure: MON CO Rt. 67
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 12.505,  Lanes on structure: 2,  Lanes under structure: 4,  Length of Maximum Span: 33.7m (110.6ft)

Find on map >>   Show street view

Structure Number: 31A148,  Location: 0.88 MI WEST CO RT 69/6 (Lat: 39.670481,  Lng: -79.860369),  Route carried "under" structure: County highway 85700,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 5,300 (year 0018),  Truck Traffic: 6%,  Features Intersected: Cheat Lake & Mon Co 857,  Facility Carried by Structure: INTERSTATE 68
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 16.962,  Lanes on structure: 4,  Lanes under structure: 2,  Length of Maximum Span: 110.9m (363.8ft)

Find on map >>   Show street view

Structure Number: 31A148,  Location: 0.88 MI WEST CO RT 69/6 (Lat: 39.670481,  Lng: -79.860369),  Route carried "under" structure: Other road ,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 20 (year 0009),  Features Intersected: Cheat Lake & Mon Co 857,  Facility Carried by Structure: INTERSTATE 68
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 1,  Length of Maximum Span: 110.9m (363.8ft)

Find on map >>   Show street view

Structure Number: 31A206,  Location: 0.36 MI SOUTH CO RT 67 (Lat: 39.646550,  Lng: -79.894831),  Route carried "under" structure: Interstate 6800,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 34,200 (year 0018),  Truck Traffic: 18%,  Features Intersected: I-68 (X),  Facility Carried by Structure: MONONGALIA CR 857
Minimum Vertical Clearance: 4.98m (16.34ft),  Kilometerpoint: 11.587,  Lanes on structure: 6,  Lanes under structure: 4,  Length of Maximum Span: 31.6m (103.7ft)

Find on map >>   Show street view

Structure Number: 31A312,  Location: 0.21 mi. N. of I 68 (Lat: 39.675711,  Lng: -79.848931),  Route carried "under" structure: County highway 857,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 2,000 (year 2018),  Truck Traffic: 6%,  Features Intersected: Mon. Co. Rt. 857,  Facility Carried by Structure: WV RT. 43
Minimum Vertical Clearance: 6.00m (19.69ft),  Kilometerpoint: 18.186,  Lanes on structure: 3,  Length of Maximum Span: 37.5m (123.0ft)

Find on map >>   Show street view

Structure Number: 31A313,  Location: 0.21 mi. N. I 68 (Lat: 39.677061,  Lng: -79.848811),  Route carried "under" structure: County highway 857,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 2,000 (year 2018),  Truck Traffic: 6%,  Features Intersected: Mon. Co. Rt. 857,  Facility Carried by Structure: WV RT. 43
Minimum Vertical Clearance: 7.32m (24.02ft),  Kilometerpoint: 18.186,  Lanes on structure: 2,  Lanes under structure: 3,  Length of Maximum Span: 37.5m (123.0ft)

Find on map >>   Show street view

Structure Number: 31A314,  Location: 0.4 mi. N of MON CO 857 (Lat: 39.680581,  Lng: -79.847731),  Route carried "under" structure: County highway 881,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 0018),  Features Intersected: Mon Co Rt 88/1 (SLS),  Facility Carried by Structure: WV RT. 43
Minimum Vertical Clearance: 6.05m (19.85ft),  Kilometerpoint: 0.966,  Lanes on structure: 4,  Lanes under structure: 2,  Length of Maximum Span: 42.8m (140.4ft)

Find on map >>   Show street view

Structure Number: 31A315,  Location: 0.6 mi. N of MON CO 857 (Lat: 39.680781,  Lng: -79.848050),  Route carried "under" structure: County highway 881,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 10 (year 0016),  Features Intersected: MON CO RT 88/1 (SLS),  Facility Carried by Structure: WV RT. 43
Minimum Vertical Clearance: 6.10m (20.01ft),  Kilometerpoint: 0.966,  Lanes on structure: 3,  Length of Maximum Span: 42.8m (140.4ft)

Find on map >>   Show street view

Structure Number: 31A316,  Location: 1.0 MILES N OF MON CO 857 (Lat: 39.687400,  Lng: -79.845450),  Route carried "under" structure: County highway 6917,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2018),  Features Intersected: Mon. Co. 69/17,  Facility Carried by Structure: WV Rt. 43
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 0.772,  Lanes on structure: 3,  Length of Maximum Span: 16.5m (54.1ft)

Find on map >>   Show street view

Structure Number: 31A317,  Location: 1.0 MILES N OF MON CO 857 (Lat: 39.687531,  Lng: -79.845619),  Route carried "under" structure: County highway 6917,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2018),  Features Intersected: MON. CO. 69/17,  Facility Carried by Structure: WV Rt. 43
Minimum Vertical Clearance: 6.86m (22.51ft),  Kilometerpoint: 0.772,  Lanes on structure: 3,  Length of Maximum Span: 16.5m (54.1ft)

Find on map >>   Show street view

Structure Number: 39A1,  Location: 0.05 MI SOUTH CO RT 73/73 (Lat: 39.658489,  Lng: -79.780669),  Route carried "under" structure: Interstate 6800,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 19,300 (year 0018),  Truck Traffic: 15%,  Features Intersected: I-68,  Facility Carried by Structure: PRESTON CO 73/12
Minimum Vertical Clearance: 6.02m (19.75ft),  Kilometerpoint: 23.883,  Lanes on structure: 2,  Lanes under structure: 4,  Length of Maximum Span: 22.8m (74.8ft)

Find on map >>   Show street view

Structure Number: 39A151,  Location: 0.15 MI SOUTH CO RT 73/73 (Lat: 39.655711,  Lng: -79.762939),  Route carried "under" structure: Interstate 6800,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 18,075 (year 0017),  Truck Traffic: 15%,  Features Intersected: PRESTON CO RT 73/2,  Facility Carried by Structure: PRESTON CO RT 73/2
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 25.492,  Lanes on structure: 2,  Lanes under structure: 5,  Length of Maximum Span: 24.5m (80.4ft)

Discuss Cheat Lake, West Virginia (WV) on our hugely popular West Virginia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.