Bridge Statistics for Brunswick, Georgia (GA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 31Number of bridges
  • 2,254ft / 687mTotal length
  • $183,571,000Total costs
  • 713,530Total average daily traffic
  • 29,576Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Brunswick
  • No street view available for this location

New bridges in Brunswick, GA - historical statistics
  • New bridges - historical statistics
  • 41950-1959
  • 21960-1969
  • 91970-1979
  • 21980-1989
  • 31990-1999
  • 32000-2009
Reconstructed bridges in Brunswick, GA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 31980-1989
  • 11990-1999
  • 82000-2009
Average Bridge Daily Traffic in Brunswick, GA
Average Bridge Truck Traffic in Brunswick, GA
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 26.1%Very good
  • 73.9%Good
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 69.6%Good
  • 21.7%Satisfactory
  • 8.7%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 88.2%Very good
  • 11.8%Good
Find on map >>   Show street view

Structure Number: 1270004,  Location: 1 MI N OF BRUNSWICK (Lat: 31.183139,  Lng: -81.470578),  Route carried "on" structure: US 17,  Year Built: 1975,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 2.47m (8.10ft),  Average Daily Traffic: 28,300 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 42,450 (year 2031),  Design Load: HS 20,  Features Intersected: CYPRESS MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.531,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.2m (26.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 15.3m (50.2ft),  Out-to-Out Width: 16.3m (53.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Very good,  Operating Rating: 49.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $316,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $475,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1270005,  Location: 1 MI N OF BRUNSWICK (Lat: 31.183219,  Lng: -81.470858),  Route carried "on" structure: US 17,  Year Built: 1955,  Year Reconstructed: 1975,  Status: Open,  Structure Length: 2.47m (8.10ft),  Average Daily Traffic: 28,300 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 42,450 (year 2031),  Design Load: HS 20,  Features Intersected: CYPRESS MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.531,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.2m (26.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 17.3m (56.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $403,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $604,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1270041,  Location: 1 MI N OF JCT SR 520 (Lat: 31.153139,  Lng: -81.568150),  Route carried "on" structure: State highway 303,  Year Built: 1965,  Status: Open,  Structure Length: 35.36m (116.01ft),  Average Daily Traffic: 8,690 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 13,035 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SOUTH BRUNSWICK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 15,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2020,  Underwater Inspection Date: June 2018,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $4,532,000,  Roadway Improvement Cost: $453,000,  Total Project Cost: $6,799,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 1270043,  Location: .7 MI E OF INT SR 25-303 (Lat: 31.137675,  Lng: -81.574825),  Route carried "on" structure: Interstate 95,  Year Built: 1976,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 7.77m (25.49ft),  Average Daily Traffic: 46,410 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 69,615 (year 2031),  Design Load: HS 20,  Features Intersected: SR 520 (US 17)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 46.671,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.8m (87.9ft),  Curb-To-Curb Width: 23.3m (76.4ft),  Out-to-Out Width: 24.3m (79.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 58.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,268,000,  Roadway Improvement Cost: $127,000,  Total Project Cost: $1,902,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1270044,  Location: .7 MI E OF INT SR 25-303 (Lat: 31.137828,  Lng: -81.575169),  Route carried "on" structure: Interstate 95,  Year Built: 1976,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 7.74m (25.39ft),  Average Daily Traffic: 46,410 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 69,615 (year 2031),  Design Load: HS 20,  Features Intersected: SR 520 - (US 17)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 46.671,  Lanes on structure: 4,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.8m (87.9ft),  Curb-To-Curb Width: 30.8m (101.0ft),  Out-to-Out Width: 31.7m (104.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,534,000,  Roadway Improvement Cost: $153,000,  Total Project Cost: $2,301,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1270045,  Location: 6 MI W OF BRUNSWICK (Lat: 31.142944,  Lng: -81.571417),  Route carried "on" structure: Interstate 95,  Year Built: 1976,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 46,410 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 69,615 (year 2031),  Design Load: HS 20,  Features Intersected: COLONELS ISLAND-CSX RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 48.280,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 27.4m (89.9ft),  Skew: 11 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.0m (59.1ft),  Curb-To-Curb Width: 27.6m (90.6ft),  Out-to-Out Width: 28.5m (93.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $816,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $1,223,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1270046,  Location: 6 MI W OF BRUNSWICK (Lat: 31.143042,  Lng: -81.571761),  Route carried "on" structure: Interstate 95,  Year Built: 1976,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 5.03m (16.50ft),  Average Daily Traffic: 46,410 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 69,615 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: COLONELS ISLAND-CSX RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 48.280,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Skew: 11 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.0m (59.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 25.5m (83.7ft),  Out-to-Out Width: 26.4m (86.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $821,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $1,231,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1270047,  Location: 1.2 MI N I-95 & SR520 INT (Lat: 31.152622,  Lng: -81.564131),  Route carried "on" structure: Interstate 95,  Year Built: 1977,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 56.45m (185.20ft),  Average Daily Traffic: 46,410 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 69,615 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: SOUTH BRUNSWICK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 48.280,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.9m (75.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 28,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 23.1m (75.8ft),  Out-to-Out Width: 24.1m (79.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 62.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: December 2020,  Underwater Inspection Date: June 2018,  Bridge Improvement Cost: $9,210,000,  Roadway Improvement Cost: $921,000,  Total Project Cost: $13,814,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1270048,  Location: 1.2 MI N I-95 & SR520 INT (Lat: 31.152750,  Lng: -81.564411),  Route carried "on" structure: Interstate 95,  Year Built: 1977,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 56.45m (185.20ft),  Average Daily Traffic: 46,410 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 69,615 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: SOUTH BRUNSWICK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 48.280,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.9m (75.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 28,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 23.1m (75.8ft),  Out-to-Out Width: 24.1m (79.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: December 2020,  Underwater Inspection Date: June 2018,  Bridge Improvement Cost: $9,210,000,  Roadway Improvement Cost: $921,000,  Total Project Cost: $13,814,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1270049,  Location: INT I-95 & SR 303 (Lat: 31.166522,  Lng: -81.553731),  Route carried "on" structure: Interstate 95,  Year Built: 1977,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 36.55m (119.91ft),  Average Daily Traffic: 46,410 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 69,615 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: SR 303 - HILLERY SLOUGH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 49.890,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.6m (74.1ft),  Skew: 19 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 12,  Length of Maximum Span: 47.5m (155.8ft),  Curb-To-Curb Width: 23.2m (76.1ft),  Out-to-Out Width: 24.1m (79.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2020,  Underwater Inspection Date: May 2018,  Bridge Improvement Cost: $5,962,000,  Roadway Improvement Cost: $596,000,  Total Project Cost: $8,944,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 127005,  Location: INT OF I-95 AND SR 303 (Lat: 31.166622,  Lng: -81.554014),  Route carried "on" structure: Interstate 95,  Year Built: 1977,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 40.97m (134.42ft),  Average Daily Traffic: 46,410 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 69,615 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: SR 303 - HILLERY SLOUGH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 49.890,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.2m (63.0ft),  Skew: 19 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Number Of Approach Spans: 12,  Length of Maximum Span: 47.9m (157.2ft),  Curb-To-Curb Width: 23.1m (75.8ft),  Out-to-Out Width: 24.0m (78.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2020,  Underwater Inspection Date: May 2018,  Bridge Improvement Cost: $6,683,000,  Roadway Improvement Cost: $668,000,  Total Project Cost: $10,025,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1270061,  Location: 3.7 MI E OF BRUNSWICK (Lat: 31.167808,  Lng: -81.413428),  Route carried "on" structure: State highway 25,  Year Built: 1950,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 38.98m (127.89ft),  Average Daily Traffic: 22,740 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 34,110 (year 2031),  Design Load: H 15,  Features Intersected: FREDERICA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.656,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.4m (57.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 32,  Length of Maximum Span: 38.7m (127.0ft),  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 23.0m (75.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2020,  Underwater Inspection Date: July 2018,  Bridge Improvement Cost: $7,723,000,  Roadway Improvement Cost: $772,000,  Total Project Cost: $11,585,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1270063,  Location: 2.2 MI E OF BRUNSWICK (Lat: 31.168814,  Lng: -81.436561),  Route carried "on" structure: State highway 25,  Year Built: 1950,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 22.71m (74.51ft),  Average Daily Traffic: 22,740 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 34,110 (year 2031),  Design Load: H 15,  Features Intersected: LITTLE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.875,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.0m (59.1ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 14,  Length of Maximum Span: 17.1m (56.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 22.1m (72.5ft),  Out-to-Out Width: 25.1m (82.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2020,  Underwater Inspection Date: July 2018,  Bridge Improvement Cost: $4,499,000,  Roadway Improvement Cost: $450,000,  Total Project Cost: $6,748,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1270064,  Location: 1.5 MI E OF BRUNSWICK (Lat: 31.164519,  Lng: -81.446069),  Route carried "on" structure: State highway 25,  Year Built: 1986,  Status: Open,  Structure Length: 48.37m (158.69ft),  Average Daily Traffic: 22,740 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 34,110 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: BACK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.484,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Navigation Control: Yes ( Vertical Clearance: 12.1m (39.7ft), Horizontal Clearance: 27.4m (89.9ft)),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 19,  Length of Maximum Span: 36.6m (120.1ft),  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 23.0m (75.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2020,  Underwater Inspection Date: July 2018,  Bridge Improvement Cost: $9,583,000,  Roadway Improvement Cost: $958,000,  Total Project Cost: $14,374,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1270065,  Location: .5 MI E OF BRUNSWICK (Lat: 31.161689,  Lng: -81.468839),  Route carried "on" structure: County highway 582,  Year Built: 1950,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 9.88m (32.41ft),  Average Daily Traffic: 22,740 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 34,110 (year 2031),  Design Load: H 15,  Features Intersected: TERRY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.093,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 13,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 23.0m (75.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 69.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2020,  Underwater Inspection Date: July 2018,  Bridge Improvement Cost: $1,956,000,  Roadway Improvement Cost: $196,000,  Total Project Cost: $2,935,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1270072,  Location: 6 MI W JCT SR 303 & SR 25 (Lat: 31.191919,  Lng: -81.661028),  Route carried "on" structure: US 82,  Year Built: 1982,  Status: Open,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 9,400 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 14,100 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: COLLEGE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.265,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2020,  Underwater Inspection Date: May 2018,  Bridge Improvement Cost: $445,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $668,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1270076,  Location: BRUNSWICK - NORTHSIDE (Lat: 31.203269,  Lng: -81.501639),  Route carried "on" structure: State highway 303,  Year Built: 1993,  Status: Open,  Structure Length: 5.88m (19.29ft),  Average Daily Traffic: 15,010 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 22,515 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: CR 1065-CSX RR 729234W
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.265,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 9 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 34.7m (113.8ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 19.3m (63.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,165,000,  Roadway Improvement Cost: $117,000,  Total Project Cost: $1,748,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1270078,  Location: 5 MI S OF BRUNSWICK (Lat: 31.127278,  Lng: -81.552497),  Route carried "on" structure: US 17,  Year Built: 1996,  Status: Open,  Structure Length: 18.93m (62.11ft),  Average Daily Traffic: 11,830 (year 2011),  Truck Traffic: 8%,  Average Future Daily Traffic: 17,745 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: FANCY BLUFF CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.047,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 36.6m (120.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2020,  Underwater Inspection Date: June 2018,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $2,426,000,  Roadway Improvement Cost: $243,000,  Total Project Cost: $3,640,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1275001,  Location: 2 MI E SR 25-SR 405 INT (Lat: 31.138206,  Lng: -81.558067),  Route carried "on" structure: County highway 20,  Year Built: 1962,  Status: Posted for load,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 1,000 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,500 (year 2031),  Design Load: H 15,  Features Intersected: FANCY BLUFF CREEK TRIB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 48.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $234,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $352,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1275018,  Location: 5 MI S OF BRUNSWICK (Lat: 31.127119,  Lng: -81.552658),  Route carried "on" structure: US 17,  Year Built: 1997,  Status: Open,  Structure Length: 18.90m (62.01ft),  Average Daily Traffic: 11,830 (year 2011),  Truck Traffic: 8%,  Average Future Daily Traffic: 17,745 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: FANCY BLUFF CREEK,  Facility Carried by Structure: SR 520 EBL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.047,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 36.6m (120.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2020,  Underwater Inspection Date: June 2018,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $2,422,000,  Roadway Improvement Cost: $242,000,  Total Project Cost: $3,634,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 127502,  Location: 0.5 S BRUNSWICK CTY LMTS (Lat: 31.116236,  Lng: -81.485344),  Route carried "on" structure: US 25,  Year Built: 2002,  Status: Open,  Structure Length: 237.13m (777.99ft),  Average Daily Traffic: 11,950 (year 2011),  Truck Traffic: 6%,  Average Future Daily Traffic: 17,925 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: BRUNSWICK RIVER,  Facility Carried by Structure: SIDNEY LANIER BRID
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.484,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Skew: 30 degrees,  Navigation Control: Yes ( Vertical Clearance: 56.3m (184.7ft), Horizontal Clearance: 304.4m (998.7ft)),  Material/Design: Prestressed concrete,  Design/Construction: Stayed Girder,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 34,  Length of Maximum Span: 381.0m (1,250.0ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 22.6m (74.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: December 2020,  Underwater Inspection Date: September 2018,  Bridge Improvement Cost: $46,979,000,  Roadway Improvement Cost: $4,698,000,  Total Project Cost: $70,468,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1275021,  Location: 1.5 MILES E. OF JCT. SR 2 (Lat: 31.088689,  Lng: -81.479669),  Route carried "on" structure: State highway 520,  Year Built: 2005,  Status: Open,  Structure Length: 9.14m (29.99ft),  Average Daily Traffic: 3,440 (year 2011),  Truck Traffic: 9%,  Average Future Daily Traffic: 5,160 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: CEDAR CREEK,  Facility Carried by Structure: JEKYLL ISLAND ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.187,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: December 2020,  Underwater Inspection Date: May 2018,  Bridge Improvement Cost: $1,172,000,  Roadway Improvement Cost: $117,000,  Total Project Cost: $1,758,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1275022,  Location: 5 MI S OF BRUNSWICK (Lat: 31.120747,  Lng: -81.543142),  Route carried "on" structure: US 25,  Year Built: 2007,  Status: Open,  Structure Length: 15.24m (50.00ft),  Average Daily Traffic: 3,440 (year 2011),  Truck Traffic: 9%,  Average Future Daily Traffic: 5,160 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: PORT AUTHORITY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.047,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.9m (75.1ft),  Skew: 7 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 23.0m (75.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 37.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $3,019,000,  Roadway Improvement Cost: $302,000,  Total Project Cost: $4,529,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1270043,  Location: .7 MI E OF INT SR 25-303 (Lat: 31.137675,  Lng: -81.574825),  Route carried "under" structure: US 17,  Structure Length: 0. m,  Average Daily Traffic: 8,200 (year 1999),  Truck Traffic: 1%,  Features Intersected: I-95 NBL (SR 405),  Facility Carried by Structure: I-95 NBL
Minimum Vertical Clearance: 5.15m (16.90ft),  Kilometerpoint: 20.921,  Lanes on structure: 3,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1270044,  Location: .7 MI E OF INT SR 25-303 (Lat: 31.137828,  Lng: -81.575169),  Route carried "under" structure: US 17,  Structure Length: 0. m,  Average Daily Traffic: 8,200 (year 1999),  Truck Traffic: 1%,  Features Intersected: I-95 SBL (SR 405),  Facility Carried by Structure: I-95 SBL & RAMP
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 20.921,  Lanes on structure: 4,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1270049,  Location: INT I-95 & SR 303 (Lat: 31.166522,  Lng: -81.553731),  Route carried "under" structure: State highway 303,  Structure Length: 0. m,  Average Daily Traffic: 42,700 (year 2000),  Truck Traffic: 24%,  Features Intersected: I-95 NBL (SR 405),  Facility Carried by Structure: I-95 NBL
Minimum Vertical Clearance: 5.15m (16.90ft),  Kilometerpoint: 3.219,  Lanes on structure: 3,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 127005,  Location: INT OF I-95 AND SR 303 (Lat: 31.166622,  Lng: -81.554014),  Route carried "under" structure: State highway 303,  Structure Length: 0. m,  Average Daily Traffic: 42,700 (year 2000),  Truck Traffic: 24%,  Features Intersected: I-95 SBL (SR 405),  Facility Carried by Structure: I-95 SBL
Minimum Vertical Clearance: 5.02m (16.47ft),  Kilometerpoint: 3.219,  Lanes on structure: 3,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1270076,  Location: BRUNSWICK - NORTHSIDE (Lat: 31.203269,  Lng: -81.501639),  Route carried "under" structure: City street 1065,  Structure Length: 0. m,  Average Daily Traffic: 15,600 (year 1999),  Truck Traffic: 1%,  Features Intersected: SR 303,  Facility Carried by Structure: SR 303
Minimum Vertical Clearance: 6.90m (22.64ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 127502,  Location: 0.5 S BRUNSWICK CTY LMTS (Lat: 31.116236,  Lng: -81.485344),  Route carried "under" structure: City street 99999,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2006),  Truck Traffic: 1%,  Features Intersected: LANIER BRIDGE,  Facility Carried by Structure: SIDNEY LANIER BRID
Minimum Vertical Clearance: 5.38m (17.65ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 127502,  Location: 0.5 S BRUNSWICK CTY LMTS (Lat: 31.116236,  Lng: -81.485344),  Route carried "under" structure: State lands road ,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2006),  Truck Traffic: 1%,  Features Intersected: DNR ROAD.,  Facility Carried by Structure: SIDNEY LANIER BRID
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 1275022,  Location: 5 MI S OF BRUNSWICK (Lat: 31.120747,  Lng: -81.543142),  Route carried "under" structure: State highway 520,  Structure Length: 0. m,  Average Daily Traffic: 500 (year 2005),  Truck Traffic: 1%,  Features Intersected: PORT AVTHOURTY
Minimum Vertical Clearance: 7.13m (23.39ft),  Kilometerpoint: 8.047,  Lanes on structure: 4,  Length of Maximum Span: 0.0m

Discuss Brunswick, Georgia (GA) on our hugely popular Georgia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.