Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Bellwood, Illinois (IL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 34Number of bridges
  • 515ft / 157mTotal length
  • $643,000Total costs
  • 364,825Total average daily traffic
  • 22,962Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Bellwood
  • No street view available for this location

New bridges in Bellwood, IL - historical statistics
  • New bridges - historical statistics
  • 21900-1909
  • 101920-1929
  • 11930-1939
  • 51950-1959
  • 121960-1969
  • 21990-1999
  • 12000-2009
  • 12010-2019
Reconstructed bridges in Bellwood, IL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 41960-1969
  • 11970-1979
  • 71980-1989
  • 11990-1999
  • 12000-2009
Average Bridge Daily Traffic in Bellwood, IL
Average Bridge Truck Traffic in Bellwood, IL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 6.3%Good
  • 56.3%Satisfactory
  • 18.8%Fair
  • 18.8%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 18.8%Very good
  • 12.5%Good
  • 37.5%Satisfactory
  • 6.3%Fair
  • 25.0%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 18.8%Very good
  • 31.3%Good
  • 12.5%Satisfactory
  • 37.5%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 16.7%Very good
  • 16.7%Good
  • 55.6%Satisfactory
  • 5.6%Fair
  • 5.6%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 20.0%Satisfactory
  • 50.0%Fair
  • 20.0%Poor
  • 10.0%Serious
Find on map >>   Show street view

Structure Number: 160646,  Location: 0.7 M E US 45 P20 (Lat: 41.881900,  Lng: -87.869117),  Route carried "on" structure: Other road ,  Year Built: 1931,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 9,850 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 20,188 (year 2032),  Features Intersected: ADDISON CR,  Facility Carried by Structure: WASHINGTON BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.545,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 1.3m (4.3ft),  Right: 1.3m (4.3ft),  Curb-To-Curb Width: 13.8m (45.3ft),  Out-to-Out Width: 18.1m (59.4ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 47.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 28.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.43m (4.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $141,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $212,000,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 160686,  Location: 3 M W IL 43 (Lat: 41.871031,  Lng: -87.863169),  Route carried "on" structure: Other road ,  Year Built: 1951,  Year Reconstructed: 1984,  Status: Open,  Structure Length: 7.00m (22.97ft),  Average Daily Traffic: 16,100 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 20,600 (year 2032),  Design Load: HS 20,  Features Intersected: I-290 IKE,  Facility Carried by Structure: 25TH AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.782,  Lanes on structure: 4,  Lanes under structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 20 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 19.1m (62.7ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 16.1m (52.8ft),  Out-to-Out Width: 21.1m (69.2ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Fair,  Operating Rating: 56.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 30.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 161042,  Location: 0.7 M E US 45 (Lat: 41.878206,  Lng: -87.869044),  Route carried "on" structure: Other road ,  Year Built: 1920,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 5,300 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 8,240 (year 2032),  Features Intersected: ADDISON CREEK,  Facility Carried by Structure: MADISON ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.175,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 22.6m (74.1ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 47.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $287,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $431,000
Find on map >>   Show street view

Structure Number: 162714,  Location: 0.7 M E US 45 (Lat: 41.887139,  Lng: -87.870506),  Route carried "on" structure: Other road ,  Year Built: 2002,  Status: Open,  Structure Length: 0.90m (2.95ft),  Average Daily Traffic: 10,700 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 16,274 (year 2032),  Design Load: HS 20,  Features Intersected: ADDISON CREEK,  Facility Carried by Structure: ST CHARLES RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.232,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.7m (28.5ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 19.8m (65.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 84.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 50.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 16323,  Location: 0.5 MI E US45 (Lat: 41.871244,  Lng: -87.872361),  Route carried "on" structure: Other road ,  Year Built: 1952,  Status: Open,  Structure Length: 3.32m (10.89ft),  Average Daily Traffic: 2,000 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,657 (year 2032),  Design Load: HS 20,  Features Intersected: ADDISON CR,  Facility Carried by Structure: HARRISON ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.595,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 1.1m (3.6ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 37.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 166351,  Location: .3 M S of Lake St (Lat: 41.891603,  Lng: -87.863953),  Route carried "on" structure: Other road ,  Year Built: 2016,  Status: Open,  Structure Length: 12.08m (39.63ft),  Average Daily Traffic: 21,800 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 27,500 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: Union Pacific RR,  Facility Carried by Structure: 25th Avenue
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.497,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 21 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 33.5m (109.9ft),  Curb or Sidewalk Widths: Left: 3.2m (10.5ft),  Right: 0.0m,  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 20.5m (67.3ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 54.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 42.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of corrective action,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 166575,  Location: 0.7 M E US 45 (Lat: 41.872753,  Lng: -87.868947),  Route carried "on" structure: City street ,  Year Built: 1928,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 425 (year 2018),  Truck Traffic: 18%,  Average Future Daily Traffic: 421 (year 2032),  Features Intersected: ADDISON CR,  Facility Carried by Structure: VAN BUREN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.159,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb or Sidewalk Widths: Left: 1.3m (4.3ft),  Right: 1.6m (5.2ft)

Condition: Channel: Very good,  Culverts: Fair,  Operating Rating: 43.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 25.9 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020
Find on map >>   Show street view

Structure Number: 166576,  Location: 0.72 M E MANHEIM P20 (Lat: 41.874578,  Lng: -87.869017),  Route carried "on" structure: City street ,  Year Built: 1928,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 550 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 318 (year 2032),  Features Intersected: ADDISON CR,  Facility Carried by Structure: JACKSON ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.159,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 20.4m (66.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 43.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 25.9 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021
Find on map >>   Show street view

Structure Number: 166577,  Location: 0.72 M E MANHEIM P20 (Lat: 41.875492,  Lng: -87.868903),  Route carried "on" structure: City street ,  Year Built: 1928,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 225 (year 2018),  Truck Traffic: 21%,  Average Future Daily Traffic: 318 (year 2032),  Features Intersected: ADDISON CR,  Facility Carried by Structure: ADAMS ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.789,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 20.4m (66.9ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 43.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 25.9 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021
Find on map >>   Show street view

Structure Number: 166578,  Location: 0.72 M E MANHEIM P20 (Lat: 41.876372,  Lng: -87.869017),  Route carried "on" structure: City street ,  Year Built: 1928,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 325 (year 2018),  Average Future Daily Traffic: 318 (year 2032),  Features Intersected: ADDISON CR,  Facility Carried by Structure: WILCOX ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.159,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 20.4m (66.9ft)

Condition: Channel: Satisfactory,  Culverts: Serious,  Operating Rating: 37.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021
Find on map >>   Show street view

Structure Number: 166579,  Location: 0.72 M E MANHEIM P20 (Lat: 41.877303,  Lng: -87.869208),  Route carried "on" structure: City street ,  Year Built: 1928,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 175 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 524 (year 2032),  Features Intersected: ADDISON CR,  Facility Carried by Structure: MONROE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.869,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 20.4m (66.9ft)

Condition: Channel: Satisfactory,  Culverts: Poor,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021
Find on map >>   Show street view

Structure Number: 16658,  Location: 0.7 M E. US 45 (Lat: 41.871636,  Lng: -87.869314),  Route carried "on" structure: City street ,  Year Built: 1928,  Year Reconstructed: 1969,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 50 (year 2018),  Truck Traffic: 30%,  Average Future Daily Traffic: 524 (year 2032),  Features Intersected: ADDISON CR,  Facility Carried by Structure: 30TH AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.290,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 43.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 25.9 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021
Find on map >>   Show street view

Structure Number: 166581,  Location: 0.6 M E US 45 (Lat: 41.871567,  Lng: -87.870531),  Route carried "on" structure: City street ,  Year Built: 1928,  Year Reconstructed: 1969,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 450 (year 2018),  Truck Traffic: 17%,  Average Future Daily Traffic: 1,039 (year 2032),  Features Intersected: ADDISON CR,  Facility Carried by Structure: 31ST AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.724,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.7m (5.6ft)

Condition: Channel: Satisfactory,  Culverts: Poor,  Operating Rating: 33.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021
Find on map >>   Show street view

Structure Number: 166582,  Location: 0.6 M E US 45 (Lat: 41.871542,  Lng: -87.871758),  Route carried "on" structure: City street ,  Year Built: 1928,  Year Reconstructed: 1969,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 75 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 524 (year 2032),  Features Intersected: ADDISON CR,  Facility Carried by Structure: 32ND AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.306,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.7m (28.5ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 43.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 25.9 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021
Find on map >>   Show street view

Structure Number: 101003,  Location: 2.5 MI S ILL 75 (Lat: 42.457639,  Lng: -89.019606),  Route carried "on" structure: State highway 251,  Year Built: 1967,  Status: Open,  Structure Length: 12.89m (42.29ft),  Average Daily Traffic: 13,400 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 10,600 (year 2040),  Design Load: HS 20,  Features Intersected: UP RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 212.701,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 6 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 32.9m (107.9ft),  Curb-To-Curb Width: 9.9m (32.5ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Operating Rating: 70.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 36.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 1010101,  Location: 0.4 MI S HARRISON AV (Lat: 42.232142,  Lng: -89.028839),  Route carried "on" structure: Other road ,  Year Built: 1963,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 4.53m (14.86ft),  Average Daily Traffic: 24,000 (year 2017),  Truck Traffic: 9%,  Average Future Daily Traffic: 27,900 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: UNION PACIFIC RR,  Facility Carried by Structure: ALPINE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.822,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 20 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.2m (53.1ft),  Curb-To-Curb Width: 19.8m (65.0ft),  Out-to-Out Width: 20.7m (67.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 76.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 46.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1010109,  Location: IN ROCKTON (Lat: 42.449281,  Lng: -89.072481),  Route carried "on" structure: State highway 75,  Year Built: 1927,  Year Reconstructed: 1974,  Status: Open,  Structure Length: 17.32m (56.82ft),  Average Daily Traffic: 7,750 (year 2021),  Truck Traffic: 7%,  Average Future Daily Traffic: 12,000 (year 2040),  Design Load: HS 20,  Features Intersected: ROCK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 56.068,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Navigation Control: Yes ( Vertical Clearance: 0.6m (2.0ft), Horizontal Clearance: 19.2m (63.0ft)),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 21.6m (70.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 53.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Underwater Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 101012,  Location: .2 MI S RT 20 BR (Lat: 42.277831,  Lng: -89.192850),  Route carried "on" structure: County highway ,  Year Built: 1961,  Year Reconstructed: 2011,  Status: Open,  Structure Length: 8.02m (26.31ft),  Average Daily Traffic: 1,150 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,200 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: US RT 20,  Facility Carried by Structure: WELDON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.851,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.0m (75.5ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 71.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 54.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1010124,  Location: IN ROCKTON (Lat: 42.451031,  Lng: -89.059511),  Route carried "on" structure: Other road ,  Year Built: 1966,  Status: Open,  Structure Length: 8.14m (26.71ft),  Average Daily Traffic: 5,000 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 7,900 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: ILL 2,  Facility Carried by Structure: HONONEGAH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.883,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.9m (78.4ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 9.5m (31.2ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 70.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 37.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 1010125,  Location: 0.1 M S HONONEGAH RD (Lat: 42.450150,  Lng: -89.059767),  Route carried "on" structure: State highway 2,  Year Built: 1966,  Status: Posted for load,  Structure Length: 18.59m (60.99ft),  Average Daily Traffic: 7,950 (year 2021),  Truck Traffic: 7%,  Average Future Daily Traffic: 4,200 (year 2040),  Design Load: HS 20,  Features Intersected: ROCK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 108.612,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Navigation Control: Yes ( Vertical Clearance: 3.0m (9.8ft), Horizontal Clearance: 36.3m (119.1ft)),  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 5,  Number Of Approach Spans: 2,  Length of Maximum Span: 36.4m (119.4ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 41.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 22.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Critical Feature Inspection Date: August 2021,  Underwater Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 1010126,  Location: 0.1 M S HONONEGAH RD (Lat: 42.450033,  Lng: -89.059753),  Route carried "on" structure: State highway 2,  Year Built: 1966,  Status: Posted for load,  Structure Length: 18.59m (60.99ft),  Average Daily Traffic: 7,950 (year 2021),  Truck Traffic: 7%,  Average Future Daily Traffic: 4,200 (year 2040),  Design Load: HS 20,  Features Intersected: ROCK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 108.596,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Navigation Control: Yes ( Vertical Clearance: 3.0m (9.8ft), Horizontal Clearance: 36.3m (119.1ft)),  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 5,  Number Of Approach Spans: 2,  Length of Maximum Span: 36.4m (119.4ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 41.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 22.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Critical Feature Inspection Date: August 2021,  Underwater Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 1010127,  Location: 0.3 M S HONONEGAH RD (Lat: 42.441836,  Lng: -89.061719),  Route carried "on" structure: State highway 2,  Year Built: 1966,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 8.07m (26.48ft),  Average Daily Traffic: 7,950 (year 2021),  Truck Traffic: 7%,  Average Future Daily Traffic: 4,200 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: SOO RR &OLD RIVER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 107.710,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 73.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 44.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1010128,  Location: 0.3 M S HONONEGAH RD (Lat: 42.441681,  Lng: -89.061842),  Route carried "on" structure: State highway 2,  Year Built: 1966,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 8.07m (26.48ft),  Average Daily Traffic: 7,950 (year 2021),  Truck Traffic: 7%,  Average Future Daily Traffic: 4,200 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: SOO RR &OLD RIVER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 107.694,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 73.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 44.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 101308,  Location: .4 MI W. OF ROCKTON (Lat: 42.460269,  Lng: -89.095086),  Route carried "on" structure: Other road ,  Year Built: 1990,  Status: Open,  Structure Length: 11.32m (37.14ft),  Average Daily Traffic: 2,250 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,000 (year 2040),  Design Load: HS 20,  Features Intersected: ROCK RIVER,  Facility Carried by Structure: ROCKTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.209,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Navigation Control: Yes ( Vertical Clearance: 1.8m (5.9ft), Horizontal Clearance: 27.1m (88.9ft)),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 68.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 40.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1013082,  Location: W. EDGE OF ROCKTON (Lat: 42.455500,  Lng: -89.082764),  Route carried "on" structure: Other road ,  Year Built: 1990,  Status: Open,  Structure Length: 8.14m (26.71ft),  Average Daily Traffic: 2,250 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,000 (year 2040),  Design Load: HS 20,  Features Intersected: ROCKTN DAM MILL RACE,  Facility Carried by Structure: ROCKTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.368,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 19.9m (65.3ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 70.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 37.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 101511,  Location: .5 MI N OF ROSCOE RD (Lat: 42.419336,  Lng: -89.059800),  Route carried "on" structure: Other road ,  Year Built: 1967,  Status: Open,  Structure Length: 0.66m (2.17ft),  Average Daily Traffic: 2,400 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 4,500 (year 2040),  Design Load: HS 20,  Features Intersected: UNNAMED CREEK,  Facility Carried by Structure: OLD RIVER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.685,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 74.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020
Find on map >>   Show street view

Structure Number: 160647,  Location: 0.74 M EUS45 P20 (Lat: 41.881903,  Lng: -87.868922),  Route carried "under" structure: Other road ,  Year Built: 1900,  Structure Length: 0. m,  Average Daily Traffic: 9,850 (year 2021),  Truck Traffic: 3%,  Features Intersected: WASHINGTON BLVD,  Facility Carried by Structure: IHB RR
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 1.561,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 15.2m (49.9ft)

Find on map >>   Show street view

Structure Number: 160675,  Location: 0.8 M E US 45 P20 (Lat: 41.887383,  Lng: -87.868758),  Route carried "under" structure: Other road ,  Year Built: 1900,  Structure Length: 0. m,  Average Daily Traffic: 10,700 (year 2018),  Truck Traffic: 4%,  Features Intersected: ST CHARLES RD,  Facility Carried by Structure: IHB RR
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 4.377,  Lanes under structure: 4,  Material/Design: Concrete,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 160686,  Location: 3 M W IL 43 (Lat: 41.871031,  Lng: -87.863169),  Route carried "under" structure: Interstate 290,  Year Built: 1951,  Structure Length: 0. m,  Average Daily Traffic: 163,600 (year 2021),  Truck Traffic: 6%,  Features Intersected: I-290 IKE,  Facility Carried by Structure: 25TH AVE
Minimum Vertical Clearance: 4.39m (14.40ft),  Kilometerpoint: 29.853,  Lanes on structure: 4,  Lanes under structure: 7,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.1m (62.7ft)

Find on map >>   Show street view

Structure Number: 160864,  Location: 0.81 M E 12-45 P20 (Lat: 41.878219,  Lng: -87.867681),  Route carried "under" structure: Other road ,  Year Built: 1951,  Structure Length: 0. m,  Average Daily Traffic: 5,300 (year 2018),  Truck Traffic: 6%,  Features Intersected: MADISON ST,  Facility Carried by Structure: IHB RR
Minimum Vertical Clearance: 4.24m (13.91ft),  Kilometerpoint: 1.287,  Lanes under structure: 2,  Material/Design: Steel,  Length of Maximum Span: 20.1m (65.9ft)

Find on map >>   Show street view

Structure Number: 160865,  Location: 0.8 M E 12-45 P20 (Lat: 41.878219,  Lng: -87.867486),  Route carried "under" structure: Other road ,  Year Built: 1951,  Structure Length: 0. m,  Average Daily Traffic: 5,300 (year 2018),  Truck Traffic: 6%,  Features Intersected: MADISON ST,  Facility Carried by Structure: IHB RR
Minimum Vertical Clearance: 4.55m (14.93ft),  Kilometerpoint: 1.304,  Lanes under structure: 2,  Material/Design: Steel,  Length of Maximum Span: 20.1m (65.9ft)

Find on map >>   Show street view

Structure Number: 1010124,  Location: IN ROCKTON (Lat: 42.451172,  Lng: -89.059736),  Route carried "under" structure: State highway 2,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 7,950 (year 2021),  Truck Traffic: 7%,  Features Intersected: ILL 2,  Facility Carried by Structure: HONONEGAH ROAD
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 108.708,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.9m (78.4ft)

Find on map >>   Show street view

Structure Number: 1010127,  Location: 0.3 M S HONONEGAH RD (Lat: 42.441656,  Lng: -89.061553),  Route carried "under" structure: Other road ,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 2,050 (year 2017),  Truck Traffic: 6%,  Features Intersected: SOO RR &OLD RIVER RD,  Facility Carried by Structure: IL 2 S B
Minimum Vertical Clearance: 5.87m (19.26ft),  Kilometerpoint: 1.191,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 1010128,  Location: 0.3 M S HONONEGAH RD (Lat: 42.441836,  Lng: -89.061719),  Route carried "under" structure: Other road ,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 2,050 (year 2017),  Truck Traffic: 6%,  Features Intersected: SOO RR &OLD RIVER RD,  Facility Carried by Structure: ILL 2 N B
Minimum Vertical Clearance: 5.87m (19.26ft),  Kilometerpoint: 1.159,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Discuss Bellwood, Illinois (IL) on our hugely popular Illinois forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.