Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Belen, New Mexico (NM)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 44Number of bridges
  • 518ft / 158mTotal length
  • $3,364,000Total costs
  • 303,547Total average daily traffic
  • 62,494Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Belen
  • No street view available for this location

New bridges in Belen, NM - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 51950-1959
  • 21960-1969
  • 281970-1979
  • 21980-1989
  • 21990-1999
  • 12000-2009
  • 32010-2019
Reconstructed bridges in Belen, NM - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21980-1989
  • 91990-1999
  • 12000-2009
Average Bridge Daily Traffic in Belen, NM
Average Bridge Truck Traffic in Belen, NM
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 36.0%Good
  • 36.0%Satisfactory
  • 24.0%Fair
  • 4.0%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 40.0%Good
  • 48.0%Satisfactory
  • 12.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 24.0%Good
  • 40.0%Satisfactory
  • 36.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 5.6%Very good
  • 61.1%Good
  • 33.3%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 44.4%Good
  • 55.6%Satisfactory
Find on map >>   Show street view

Structure Number: 858,  Location: 6.1 MI E US-60 @ MP-332.1 (Lat: 34.437272,  Lng: -104.063422),  Route carried "on" structure: County highway 11048,  Year Built: 1933,  Status: Open,  Structure Length: 2.87m (9.42ft),  Average Daily Traffic: 204 (year 2020),  Average Future Daily Traffic: 336 (year 2040),  Design Load: H 15,  Features Intersected: UNNAMED WATERWAY,  Facility Carried by Structure: 11-C048
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 61.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.87m (9.42ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $225,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $338,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5983,  Location: Jct I-25/US-60 @ Bernardo (Lat: 34.419944,  Lng: -106.837475),  Route carried "on" structure: Interstate 25,  Year Built: 1958,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 4.39m (14.40ft),  Average Daily Traffic: 9,373 (year 2020),  Truck Traffic: 37%,  Average Future Daily Traffic: 17,059 (year 2040),  Design Load: HS 20,  Features Intersected: US-60
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 282.118,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.0m (39.4ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 80.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5984,  Location: JCT I-25/US-60 @ Bernardo (Lat: 34.420044,  Lng: -106.837753),  Route carried "on" structure: Interstate 25,  Year Built: 1958,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 4.36m (14.30ft),  Average Daily Traffic: 9,373 (year 2020),  Truck Traffic: 37%,  Average Future Daily Traffic: 17,059 (year 2040),  Design Load: HS 20,  Features Intersected: US-60
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 282.118,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.3m (40.4ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 80.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6072,  Location: 1.5 MI S OF S BELEN INTER (Lat: 34.610969,  Lng: -106.785689),  Route carried "on" structure: Interstate 25,  Year Built: 1958,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 9,373 (year 2020),  Truck Traffic: 37%,  Average Future Daily Traffic: 17,059 (year 2040),  Design Load: HS 20,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 303.796,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 37.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $161,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $242,000 ( Estimate for 2030)
Find on map >>   Show street view

Structure Number: 6977,  Location: 1.8 MI N OF N BELEN INTCH (Lat: 34.737575,  Lng: -106.787239),  Route carried "on" structure: Interstate 25,  Year Built: 1969,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 19,793 (year 2020),  Truck Traffic: 37%,  Average Future Daily Traffic: 33,884 (year 2040),  Design Load: HS 20,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 318.280,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 26.8m (87.9ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 51.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $282,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $423,000 ( Estimate for 2030)
Find on map >>   Show street view

Structure Number: 7036,  Location: S Belen Inter-Change (Lat: 34.632014,  Lng: -106.782964),  Route carried "on" structure: Interstate 13,  Year Built: 1970,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 11.37m (37.30ft),  Average Daily Traffic: 1,663 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,341 (year 2040),  Design Load: HS 20,  Features Intersected: I-25 NB and SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 37.5m (123.0ft),  Curb-To-Curb Width: 13.7m (44.9ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 7037,  Location: 1.6 Mi N of S Belen Inter (Lat: 34.653208,  Lng: -106.794958),  Route carried "on" structure: Interstate 25,  Year Built: 1970,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 4.30m (14.11ft),  Average Daily Traffic: 10,244 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 18,878 (year 2040),  Design Load: HS 20,  Features Intersected: NM-548 Camino Del Llano
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 308.833,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 7038,  Location: 1.6 Mi N of S Belen Inter (Lat: 34.653144,  Lng: -106.795250),  Route carried "on" structure: Interstate 25,  Year Built: 1970,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 4.27m (14.01ft),  Average Daily Traffic: 10,244 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 18,878 (year 2040),  Design Load: HS 20,  Features Intersected: NM-548 Camino Del Llano
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 308.833,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 7044,  Location: 0.2 Mi S of N Belen Intch (Lat: 34.707911,  Lng: -106.790967),  Route carried "on" structure: Interstate 25,  Year Built: 1970,  Status: Open,  Structure Length: 6.19m (20.31ft),  Average Daily Traffic: 12,006 (year 2020),  Truck Traffic: 37%,  Average Future Daily Traffic: 20,554 (year 2040),  Design Load: HS 20,  Features Intersected: BNSF R/R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 314.949,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.6m (41.3ft),  Skew: 14 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 12.7m (41.7ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 7045,  Location: 0.2 Mi S of N Belen Intch (Lat: 34.708311,  Lng: -106.791261),  Route carried "on" structure: Interstate 25,  Year Built: 1970,  Status: Open,  Structure Length: 6.16m (20.21ft),  Average Daily Traffic: 12,102 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 22,301 (year 2040),  Design Load: HS 20,  Features Intersected: BNSF R/R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 314.949,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.4m (37.4ft),  Skew: 14 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 7046,  Location: North Belen Interchange (Lat: 34.711375,  Lng: -106.790183),  Route carried "on" structure: Interstate 25,  Year Built: 1970,  Status: Open,  Structure Length: 6.80m (22.31ft),  Average Daily Traffic: 12,102 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 22,301 (year 2040),  Design Load: HS 20,  Features Intersected: Loop 13/ N Belen Interch
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 315.351,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.3m (43.6ft),  Skew: 14 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 29.9m (98.1ft),  Curb-To-Curb Width: 12.9m (42.3ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 6.80m (22.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $390,000,  Roadway Improvement Cost: $84,000,  Total Project Cost: $630,000 ( Estimate for 2030),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 7047,  Location: North Belen Interchange (Lat: 34.711778,  Lng: -106.790483),  Route carried "on" structure: Interstate 25,  Year Built: 1970,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 6.71m (22.01ft),  Average Daily Traffic: 12,102 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 22,301 (year 2040),  Design Load: HS 20,  Features Intersected: I-25 Business loop
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 315.351,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Skew: 14 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 29.9m (98.1ft),  Curb-To-Curb Width: 12.6m (41.3ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.80m (22.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $390,000,  Roadway Improvement Cost: $84,000,  Total Project Cost: $630,000 ( Estimate for 2030),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 7116,  Location: 0.4 M E JCT NM-314 (Lat: 34.692581,  Lng: -106.761083),  Route carried "on" structure: County highway 61023,  Year Built: 1970,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 1,316 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,144 (year 2040),  Features Intersected: Irrigation Ditch,  Facility Carried by Structure: 61-4023
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.2m (23.6ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 56.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 40.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7127,  Location: 1.9 MI E I-25 N BELEN INT (Lat: 34.693886,  Lng: -106.767156),  Route carried "on" structure: State highway 314,  Year Built: 1970,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 7,455 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 10,491 (year 2040),  Design Load: HS 20,  Features Intersected: LOOP 001-3/BELEN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 1,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 32.3m (106.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.10m (20.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $352,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $528,000 ( Estimate for 2030),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 7129,  Location: 2.8 Mi N of S Belen Inchg (Lat: 34.670197,  Lng: -106.795942),  Route carried "on" structure: Interstate 25,  Year Built: 1970,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 4.11m (13.48ft),  Average Daily Traffic: 12,006 (year 2020),  Truck Traffic: 37%,  Average Future Daily Traffic: 20,554 (year 2040),  Design Load: HS 20,  Features Intersected: Aragon Road(FR-4228)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 310.716,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 713,  Location: 2.8 Mi N of S Belen Inchg (Lat: 34.670228,  Lng: -106.796308),  Route carried "on" structure: Interstate 25,  Year Built: 1970,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 4.11m (13.48ft),  Average Daily Traffic: 12,006 (year 2020),  Truck Traffic: 37%,  Average Future Daily Traffic: 20,554 (year 2040),  Design Load: HS 20,  Features Intersected: Aragon Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 310.716,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.2m (53.1ft),  Curb-To-Curb Width: 12.7m (41.7ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 7202,  Location: 3.4 MI N OF S BELEN INTCH (Lat: 34.678650,  Lng: -106.795019),  Route carried "on" structure: Interstate 25,  Year Built: 1970,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 12,006 (year 2020),  Truck Traffic: 37%,  Average Future Daily Traffic: 20,554 (year 2040),  Design Load: HS 20,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 311.730,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 32.3m (106.0ft),  Skew: 11 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 1.2m (3.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2022
Find on map >>   Show street view

Structure Number: 7203,  Location: 0.05 MI N OF N BELEN INTR (Lat: 34.713506,  Lng: -106.789603),  Route carried "on" structure: Interstate 2195,  Year Built: 1970,  Year Reconstructed: 2009,  Status: Open,  Structure Length: 0.84m (2.76ft),  Average Daily Traffic: 3,718 (year 2018),  Truck Traffic: 19%,  Average Future Daily Traffic: 4,910 (year 2038),  Design Load: HS 20,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 315.592,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 35.4m (116.1ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 56.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2019
Find on map >>   Show street view

Structure Number: 7204,  Location: NORTH BELEN INTERCHANGE (Lat: 34.713511,  Lng: -106.791517),  Route carried "on" structure: Ramp City street 2195,  Year Built: 1970,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 316 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 582 (year 2040),  Design Load: HS 20,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 35.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2020
Find on map >>   Show street view

Structure Number: 7205,  Location: 0.4 MI N OF N BELEN INTCH (Lat: 34.717294,  Lng: -106.788850),  Route carried "on" structure: Interstate 25,  Year Built: 1970,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 11,551 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 21,287 (year 2040),  Design Load: HS 20,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 318.035,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 32.9m (107.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 35.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2020
Find on map >>   Show street view

Structure Number: 7206,  Location: 0.9M N OF N BELEN INTR (Lat: 34.724914,  Lng: -106.787561),  Route carried "on" structure: Interstate 25,  Year Built: 1970,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 19,793 (year 2020),  Truck Traffic: 37%,  Average Future Daily Traffic: 33,884 (year 2040),  Design Load: HS 20,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 316.864,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 32.9m (107.9ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2022
Find on map >>   Show street view

Structure Number: 724,  Location: 0.8 MI N OF S BELEN INTER (Lat: 34.643347,  Lng: -106.789850),  Route carried "on" structure: Interstate 25,  Year Built: 1970,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 9,932 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 18,303 (year 2040),  Design Load: HS 20,  Features Intersected: BELEN HIGHLINE CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 309.667,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 32.9m (107.9ft),  Skew: 25 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 85.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: January 2021
Find on map >>   Show street view

Structure Number: 7449,  Location: .3 MI E OF JCT I-25/BELEN (Lat: 34.707753,  Lng: -106.787014),  Route carried "on" structure: State highway 13,  Year Built: 1970,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 8,022 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 11,289 (year 2040),  Design Load: HS 20,  Features Intersected: BELEN HIGHLINE CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.474,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 28.0m (91.9ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: December 2020
Find on map >>   Show street view

Structure Number: 7476,  Location: 2.1 MI N US-60/NM-47 (Lat: 34.459456,  Lng: -106.549536),  Route carried "on" structure: State highway 47,  Year Built: 1974,  Status: Open,  Structure Length: 5.39m (17.68ft),  Average Daily Traffic: 1,111 (year 2020),  Truck Traffic: 21%,  Average Future Daily Traffic: 954 (year 2040),  Design Load: HS 20,  Features Intersected: ABO ARROYO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.380,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 50.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.40m (17.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $350,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $525,000 ( Estimate for 2030),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Other
Find on map >>   Show street view

Structure Number: 858,  Location: 2.23 M E OF I-25/US-60 (Lat: 34.417450,  Lng: -106.799894),  Route carried "on" structure: US 60,  Year Built: 1988,  Status: Open,  Structure Length: 16.37m (53.71ft),  Average Daily Traffic: 724 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 1,051 (year 2040),  Design Load: HS 20,  Features Intersected: Rio Grande River
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 269.967,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.3m (40.4ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 23.2m (76.1ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 44.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 8683,  Location: 2.5 MI E OF MAIN ST/BELEN (Lat: 34.652747,  Lng: -106.737911),  Route carried "on" structure: State highway 309,  Year Built: 1987,  Status: Open,  Structure Length: 18.38m (60.30ft),  Average Daily Traffic: 11,792 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 13,209 (year 2040),  Design Load: HS 20,  Features Intersected: RIO GRANDE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.023,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Skew: 21 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 22.9m (75.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 21.3m (69.9ft),  Out-to-Out Width: 22.3m (73.2ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 45.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 892,  Location: 0.5 Mi W of 10th St/Belen (Lat: 34.661542,  Lng: -106.790200),  Route carried "on" structure: City street 5220,  Year Built: 1970,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 2,966 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 4,834 (year 2040),  Design Load: HS 20,  Features Intersected: Belen Highline Canal,  Facility Carried by Structure: Delgado Street
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 35.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8963,  Location: 0.9 Mi W of Main St/Belen (Lat: 34.670058,  Lng: -106.790178),  Route carried "on" structure: City street 4228,  Year Built: 1995,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 435 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 710 (year 2040),  Features Intersected: Belen Highline Canal,  Facility Carried by Structure: Aragon Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.448,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 13.2m (43.3ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 13.2m (43.3ft),  Out-to-Out Width: 16.4m (53.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 9013,  Location: 0.16 Mi W of I-25 (Lat: 34.638942,  Lng: -106.789297),  Route carried "on" structure: County highway 61000,  Year Built: 1968,  Status: Posted for load,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 270 (year 2020),  Average Future Daily Traffic: 465 (year 2040),  Design Load: HS 20,  Features Intersected: Belen Highline Canal,  Facility Carried by Structure: 61-Z000
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.6m (31.5ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 13.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 7.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.04m (3.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $32,000,  Roadway Improvement Cost: $3,000,  Total Project Cost: $48,000 ( Estimate for 2030),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9028,  Location: 0.31 ME Camino Del Llano (Lat: 34.654272,  Lng: -106.789572),  Route carried "on" structure: City street 4224,  Year Built: 1996,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 5,490 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 6,150 (year 2040),  Design Load: HS 20,  Features Intersected: Belen Highline Canal
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 904,  Location: 0.5 Mi E of Jct Loop-13 (Lat: 34.661319,  Lng: -106.767264),  Route carried "on" structure: State highway 309,  Year Built: 2004,  Status: Open,  Structure Length: 12.01m (39.40ft),  Average Daily Traffic: 12,620 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 14,136 (year 2040),  Design Load: HS 20,  Features Intersected: BNSF Railroad
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 20.8m (68.2ft),  Skew: 20 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 45.7m (149.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 19.8m (65.0ft),  Out-to-Out Width: 26.2m (86.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 64.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 9434,  Location: Aragon Road (Lat: 34.666842,  Lng: -106.767975),  Route carried "on" structure: City street 61101,  Year Built: 2013,  Status: Open,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 785 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,280 (year 2040),  Design Load: HS 20,  Features Intersected: BNSF RR
Minimum Vertical Clearance: 5.15m (16.90ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 13.9m (45.6ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 28.7m (94.2ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9635,  Location: 7.5 M N Jct US-60/NM-304 (Lat: 34.525750,  Lng: -106.763656),  Route carried "on" structure: State highway 30,  Year Built: 2015,  Status: Open,  Structure Length: 5.44m (17.85ft),  Average Daily Traffic: 1,854 (year 2020),  Truck Traffic: 21%,  Average Future Daily Traffic: 1,593 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: Abo Arroyo
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.853,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 10.9m (35.8ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 63.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Bituminous
Find on map >>   Show street view

Structure Number: 9671,  Location: 0.9 M N NM-309 (Lat: 34.675272,  Lng: -106.772625),  Route carried "on" structure: State highway 6101,  Year Built: 2017,  Status: Open,  Structure Length: 8.78m (28.81ft),  Average Daily Traffic: 13,410 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 18,871 (year 2040),  Design Load: HS 20,  Features Intersected: BNSF Railroad,  Facility Carried by Structure: L00013/Main St.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.779,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.5m (31.2ft),  Skew: 5 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 37.8m (124.0ft),  Curb-To-Curb Width: 20.6m (67.6ft),  Out-to-Out Width: 24.7m (81.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 5983,  Location: Jct I-25/US-60 @ Bernardo (Lat: 34.419944,  Lng: -106.837475),  Route carried "under" structure: Ramp US 60,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 487 (year 2020),  Truck Traffic: 37%,  Features Intersected: US-60,  Facility Carried by Structure: I-25 NBL
Minimum Vertical Clearance: 5.12m (16.80ft),  Kilometerpoint: 266.346,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 14.3m (46.9ft)

Find on map >>   Show street view

Structure Number: 5984,  Location: JCT I-25/US-60 @ Bernardo (Lat: 34.420044,  Lng: -106.837753),  Route carried "under" structure: Ramp US 60,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 487 (year 2020),  Truck Traffic: 37%,  Features Intersected: US-60,  Facility Carried by Structure: I-25 SBL
Minimum Vertical Clearance: 4.76m (15.62ft),  Kilometerpoint: 266.346,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 14.3m (46.9ft)

Find on map >>   Show street view

Structure Number: 7036,  Location: S Belen Inter-Change (Lat: 34.632014,  Lng: -106.782964),  Route carried "under" structure: Interstate 25,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 10,542 (year 2020),  Truck Traffic: 13%,  Features Intersected: I-25 NB and SB,  Facility Carried by Structure: L-00013
Minimum Vertical Clearance: 5.15m (16.90ft),  Kilometerpoint: 306.258,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.5m (123.0ft)

Find on map >>   Show street view

Structure Number: 7037,  Location: 1.6 Mi N of S Belen Inter (Lat: 34.653208,  Lng: -106.794958),  Route carried "under" structure: City street 4224,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 5,490 (year 2020),  Truck Traffic: 7%,  Features Intersected: NM-548 Camino Del Llano,  Facility Carried by Structure: I-25 NBL
Minimum Vertical Clearance: 4.91m (16.11ft),  Kilometerpoint: 0.063,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.5m (54.1ft)

Find on map >>   Show street view

Structure Number: 7038,  Location: 1.6 Mi N of S Belen Inter (Lat: 34.653144,  Lng: -106.795250),  Route carried "under" structure: City street 4224,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 5,490 (year 2020),  Truck Traffic: 7%,  Features Intersected: NM-548 Camino Del Llano,  Facility Carried by Structure: I-25 SBL
Minimum Vertical Clearance: 4.94m (16.21ft),  Kilometerpoint: 0.064,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.5m (54.1ft)

Find on map >>   Show street view

Structure Number: 7046,  Location: North Belen Interchange (Lat: 34.711375,  Lng: -106.790183),  Route carried "under" structure: State highway 13,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 1,778 (year 2020),  Truck Traffic: 7%,  Features Intersected: Loop 13/ N Belen Interch,  Facility Carried by Structure: I-25 NBL
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 10.461,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.9m (98.1ft)

Find on map >>   Show street view

Structure Number: 7047,  Location: North Belen Interchange (Lat: 34.711778,  Lng: -106.790483),  Route carried "under" structure: Interstate 13,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 1,778 (year 2020),  Truck Traffic: 7%,  Features Intersected: I-25 Business loop,  Facility Carried by Structure: I-25 SBL
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 10.300,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.9m (98.1ft)

Find on map >>   Show street view

Structure Number: 7127,  Location: 1.9 MI E I-25 N BELEN INT (Lat: 34.693886,  Lng: -106.767156),  Route carried "under" structure: State highway 13,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 8,468 (year 2020),  Truck Traffic: 7%,  Features Intersected: LOOP 001-3/BELEN,  Facility Carried by Structure: NM-314 SBL
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 32.3m (106.0ft)

Find on map >>   Show street view

Structure Number: 7129,  Location: 2.8 Mi N of S Belen Inchg (Lat: 34.670197,  Lng: -106.795942),  Route carried "under" structure: City street 4228,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 435 (year 2020),  Truck Traffic: 6%,  Features Intersected: Aragon Road(FR-4228),  Facility Carried by Structure: I-25 NBL
Minimum Vertical Clearance: 4.97m (16.31ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.5m (54.1ft)

Find on map >>   Show street view

Structure Number: 713,  Location: 2.8 Mi N of S Belen Inchg (Lat: 34.670228,  Lng: -106.796308),  Route carried "under" structure: City street 4226,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 435 (year 2020),  Truck Traffic: 6%,  Features Intersected: Aragon Road,  Facility Carried by Structure: I-25 SBL
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.2m (53.1ft)

Discuss Belen, New Mexico (NM) on our hugely popular New Mexico forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.