Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Anacortes, Washington (WA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 833ft / 254mTotal length
  • $134,432,000Total costs
  • 103,286Total average daily traffic
  • 5,744Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Anacortes
  • No street view available for this location

New bridges in Anacortes, WA - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 21950-1959
  • 31960-1969
  • 41970-1979
  • 21980-1989
  • 12000-2009
Reconstructed bridges in Anacortes, WA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 31980-1989
  • 11990-1999
Average Bridge Daily Traffic in Anacortes, WA
Average Bridge Truck Traffic in Anacortes, WA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 58.3%Good
  • 33.3%Satisfactory
  • 8.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 8.3%Very good
  • 25.0%Good
  • 58.3%Satisfactory
  • 8.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 66.7%Good
  • 25.0%Satisfactory
  • 8.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 77.8%Very good
  • 22.2%Good
Find on map >>   Show street view

Structure Number: 6787A,  Location: 8.1 E ISLAND CO (Lat: 48.463111,  Lng: -122.540361),  Route carried "on" structure: State highway 20,  Year Built: 1962,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 16,865 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 24,825 (year 2039),  Design Load: HS 20,  Features Intersected: ABANDONED RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 80.258,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 26.5m (86.9ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 82.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.10m (20.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,600,000,  Roadway Improvement Cost: $320,000,  Total Project Cost: $3,200,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 7777A,  Location: 8.1 E ISLAND CO (Lat: 48.462944,  Lng: -122.540611),  Route carried "on" structure: State highway 20,  Year Built: 1965,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 16,865 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 24,825 (year 2039),  Design Load: HS 20,  Features Intersected: ABANDONED RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 80.258,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 26.8m (87.9ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 82.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.10m (20.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,600,000,  Roadway Improvement Cost: $320,000,  Total Project Cost: $3,200,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 8985A,  Location: 7.8N ON SR20 SPUR (Lat: 48.506667,  Lng: -122.676667),  Route carried "on" structure: Spur State highway 20,  Year Built: 1959,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 3.20m (10.50ft),  Average Daily Traffic: 3,227 (year 2010),  Truck Traffic: 2%,  Average Future Daily Traffic: 5,576 (year 2036),  Design Load: H 15,  Features Intersected: SHIP HBR/GUEMES CHANNEL
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 89.592,  Lanes on structure: 2,  Base Highway Network: Yes,  Toll: Toll bridge,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Steel,  Design/Construction: Movable - Lift,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.20m (10.50ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Critical Feature Inspection Date: August 2020,  Underwater Inspection Date: June 2018,  Other Special Inspection Date: August 2020,  Bridge Improvement Cost: $567,000,  Roadway Improvement Cost: $113,000,  Total Project Cost: $1,134,000 ( Estimate for 2014),  Deck Structure Type: Closed Grating,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 8985B,  Location: 7.8N ON SR20 SPUR (Lat: 48.506667,  Lng: -122.676667),  Route carried "on" structure: Spur State highway 20,  Year Built: 1971,  Status: Posted for load,  Structure Length: 6.22m (20.41ft),  Average Daily Traffic: 3,227 (year 2010),  Truck Traffic: 2%,  Average Future Daily Traffic: 5,576 (year 2036),  Design Load: H 15,  Features Intersected: SHIP HBR/GUEMES CHANNEL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 89.592,  Lanes on structure: 2,  Base Highway Network: Yes,  Toll: Toll bridge,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 13,  Length of Maximum Span: 5.2m (17.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 6.22m (20.41ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: August 2020,  Underwater Inspection Date: June 2018,  Bridge Improvement Cost: $979,000,  Roadway Improvement Cost: $196,000,  Total Project Cost: $1,958,000 ( Estimate for 2014),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8985D,  Location: 7.8N ON SR20 SPUR (Lat: 48.506667,  Lng: -122.676667),  Route carried "on" structure: Spur State highway 20,  Year Built: 1959,  Status: Posted for load,  Structure Length: 4.82m (15.81ft),  Average Daily Traffic: 3,227 (year 2010),  Truck Traffic: 2%,  Average Future Daily Traffic: 5,576 (year 2036),  Design Load: H 15,  Features Intersected: SHIP HBR/GUEMES CHANNEL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 89.592,  Lanes on structure: 2,  Base Highway Network: Yes,  Toll: Toll bridge,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 10,  Number Of Approach Spans: 10,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 2.3m (7.5ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 29.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 4.82m (15.81ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: August 2020,  Underwater Inspection Date: June 2018,  Bridge Improvement Cost: $1,833,000,  Roadway Improvement Cost: $367,000,  Total Project Cost: $3,666,000 ( Estimate for 2014),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9107A,  Location: 9.3 E ISLAND CO (Lat: 48.456000,  Lng: -122.521611),  Route carried "on" structure: State highway 20,  Year Built: 1972,  Status: Open,  Structure Length: 99.33m (325.89ft),  Average Daily Traffic: 17,232 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 25,365 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: SWINOMISH CHAN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 81.851,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Navigation Control: Yes ( Vertical Clearance: 22.9m (75.1ft), Horizontal Clearance: 30.5m (100.1ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Number Of Approach Spans: 16,  Length of Maximum Span: 75.0m (246.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 99.33m (325.89ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: Febuary 2021,  Critical Feature Inspection Date: Febuary 2021,  Underwater Inspection Date: July 2020,  Bridge Improvement Cost: $28,679,000,  Roadway Improvement Cost: $5,736,000,  Total Project Cost: $57,358,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 11612A,  Location: 9.3 E ISLAND CO (Lat: 48.456361,  Lng: -122.521861),  Route carried "on" structure: State highway 20,  Year Built: 1981,  Status: Open,  Structure Length: 108.05m (354.49ft),  Average Daily Traffic: 17,232 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 25,365 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: SWINOMISH CHANNEL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 81.819,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Navigation Control: Yes ( Vertical Clearance: 23.2m (76.1ft), Horizontal Clearance: 30.5m (100.1ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Number Of Approach Spans: 19,  Length of Maximum Span: 75.0m (246.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 108.05m (354.49ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Underwater Inspection Date: July 2020,  Other Special Inspection Date: Febuary 2021,  Bridge Improvement Cost: $24,815,000,  Roadway Improvement Cost: $4,963,000,  Total Project Cost: $49,630,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 16178A,  Location: 7.8N ON SR20 SPUR (Lat: 48.506667,  Lng: -122.676667),  Route carried "on" structure: Spur State highway 20,  Year Built: 1971,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 3.20m (10.50ft),  Average Daily Traffic: 3,227 (year 2010),  Truck Traffic: 2%,  Average Future Daily Traffic: 5,576 (year 2036),  Design Load: HS 20,  Features Intersected: SHIP HBR/GUEMES CHANNEL
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 89.592,  Lanes on structure: 2,  Base Highway Network: Yes,  Toll: Toll bridge,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Steel,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.20m (10.50ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Critical Feature Inspection Date: August 2020,  Underwater Inspection Date: June 2018,  Other Special Inspection Date: August 2020,  Bridge Improvement Cost: $567,000,  Roadway Improvement Cost: $113,000,  Total Project Cost: $1,134,000 ( Estimate for 2014),  Deck Structure Type: Closed Grating,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 17358A,  Location: 2.8 E ISLAND CO (Lat: 48.427861,  Lng: -122.609167),  Route carried "on" structure: State highway 20,  Year Built: 2008,  Status: Open,  Structure Length: 4.39m (14.40ft),  Average Daily Traffic: 16,961 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 24,966 (year 2039),  Design Load: HL 93,  Features Intersected: MEADOW CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 71.954,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.4m (57.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 43.9m (144.0ft),  Curb-To-Curb Width: 17.2m (56.4ft),  Out-to-Out Width: 18.0m (59.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.39m (14.40ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2018,  Bridge Improvement Cost: $1,699,000,  Roadway Improvement Cost: $340,000,  Total Project Cost: $3,398,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 81511,  Location: 0.41 N JCT SR 20 (Lat: 48.518656,  Lng: -122.623475),  Route carried "on" structure: County highway 18410,  Year Built: 1925,  Year Reconstructed: 1976,  Status: Open,  Structure Length: 6.25m (20.51ft),  Average Daily Traffic: 500 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 650 (year 2040),  Design Load: HS 20,  Features Intersected: GUEMES CHANNEL,  Facility Carried by Structure: I AVENUE
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 0.001,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 28.0m (91.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Deck: Good,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 25.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 19.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.55m (21.49ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Critical Feature Inspection Date: October 2020,  Underwater Inspection Date: May 2017,  Other Special Inspection Date: October 2020,  Bridge Improvement Cost: $2,236,000,  Roadway Improvement Cost: $447,000,  Total Project Cost: $4,472,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 81521,  Location: GUEMES ISLAND (Lat: 48.528219,  Lng: -122.624658),  Route carried "on" structure: County highway 18410,  Year Built: 1981,  Status: Open,  Structure Length: 5.03m (16.50ft),  Average Daily Traffic: 500 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 650 (year 2040),  Design Load: HS 20,  Features Intersected: GUEMES CHANNEL,  Facility Carried by Structure: GUEMES ISLAND ROAD
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 0.001,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 25.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 19.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.33m (17.49ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Critical Feature Inspection Date: October 2020,  Underwater Inspection Date: May 2017,  Other Special Inspection Date: October 2020,  Bridge Improvement Cost: $1,820,000,  Roadway Improvement Cost: $364,000,  Total Project Cost: $3,640,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 84366,  Location: 1.6 N JCT SR 20 (Lat: 48.487667,  Lng: -122.575750),  Route carried "on" structure: County highway 16610,  Year Built: 1960,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 996 (year 2021),  Truck Traffic: 25%,  Average Future Daily Traffic: 1,480 (year 2041),  Features Intersected: PETROLEUM PIPELINES,  Facility Carried by Structure: MARCH POINT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $821,000,  Roadway Improvement Cost: $164,000,  Total Project Cost: $1,642,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8985C,  Location: 7.8 N JCT SR 20 (Lat: 48.507167,  Lng: -122.677694),  Route carried "under" structure: State highway 20,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 3,227 (year 2010),  Truck Traffic: 2%,  Features Intersected: SHIP HBR/GUEMES CHANNEL
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 89.592,  Lanes under structure: 2,  Toll: Toll bridge,  Material/Design: Steel,  Design/Construction: Movable - Lift,  Length of Maximum Span: 29.3m (96.1ft)

Discuss Anacortes, Washington (WA) on our hugely popular Washington forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.